Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Abbeville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 285ft / 87.2mTotal length
  • $28,006,000Total costs
  • 29,621Total average daily traffic
  • 3,098Total average daily truck traffic
  • 39,463Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Abbeville
  • No street view available for this location

New bridges in Abbeville, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 31940-1949
  • 41960-1969
  • 51970-1979
  • 71980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Abbeville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 77.8%Good
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 88.9%Good
  • 11.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 55.6%Good
  • 44.4%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 45.5%Good
  • 36.4%Satisfactory
  • 9.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 13.3%Good
  • 46.7%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 648,  Location: 1 MI. N. HENRY CO.32 (Lat: 31.513317,  Lng: -85.329267),  Route carried "on" structure: State highway 27,  Year Built: 1929,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 880 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,277 (year 2033),  Design Load: H 15,  Features Intersected: WATSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 112.965,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1991,  Location: 0.8 MI. S. U.S. 431 (Lat: 31.555450,  Lng: -85.264917),  Route carried "on" structure: State highway 27,  Year Built: 1939,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 4,220 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,125 (year 2033),  Design Load: H 15,  Features Intersected: SKIPPERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 121.507,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $312,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2539,  Location: IN ABBEVILLE (Lat: 31.569000,  Lng: -85.231283),  Route carried "on" structure: State highway 10,  Year Built: 1941,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 4,030 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,218 (year 2033),  Design Load: H 15,  Features Intersected: VAN MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 351.572,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $579,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 254,  Location: 1.5 MI. E. OF ABBEVILLE (Lat: 31.562300,  Lng: -85.205250),  Route carried "on" structure: State highway 10,  Year Built: 1941,  Status: Open,  Structure Length: 16.79m (55.09ft),  Average Daily Traffic: 2,290 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,965 (year 2033),  Design Load: H 15,  Features Intersected: ABBIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 354.180,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 25,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.52m (57.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,244,000,  Roadway Improvement Cost: $324,000,  Total Project Cost: $3,568,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2925,  Location: 5.8 MI.E. SR 105 (Lat: 31.596533,  Lng: -85.326117),  Route carried "on" structure: State highway 10,  Year Built: 1946,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,710 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,214 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 341.298,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $344,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $378,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7884,  Location: 1.2 MI. NO. OF AL 10 (Lat: 31.614869,  Lng: -85.326569),  Route carried "on" structure: County highway 81,  Year Built: 1963,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 70 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 90 (year 2034),  Design Load: H 20,  Features Intersected: UNNAMED BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 35.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $264,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7885,  Location: 2.1 MI. OF AL #10 (Lat: 31.625589,  Lng: -85.329383),  Route carried "on" structure: County highway 81,  Year Built: 1963,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 70 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 90 (year 2034),  Design Load: H 20,  Features Intersected: ROBINSON BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8419,  Location: 0.5 MI. N. ABBEVILLE (Lat: 31.580350,  Lng: -85.241833),  Route carried "on" structure: State highway 95,  Year Built: 1964,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,050 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,454 (year 2033),  Design Load: H 20,  Features Intersected: OWENS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.632,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $924,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9021,  Location: BR. CULVT. ON PAVEDRD. 32 (Lat: 31.486933,  Lng: -85.266675),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 320 (year 2015),  Truck Traffic: 3%,  Average Future Daily Traffic: 350 (year 2035),  Design Load: H 15,  Features Intersected: WARD MILL CREEK,  Facility Carried by Structure: ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $403,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $443,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10222,  Location: RCDG BR. ON PAVED RD. 46 (Lat: 31.609939,  Lng: -85.202558),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 500 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 600 (year 2034),  Design Load: H 15,  Features Intersected: ABBIE CREEK,  Facility Carried by Structure: ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.28m (33.73ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Underwater Inspection Date: December 2018,  Bridge Improvement Cost: $2,186,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $2,405,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10903,  Location: BR. CULVT. ON PAVEDRD.107 (Lat: 31.512811,  Lng: -85.274317),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 120 (year 2015),  Average Future Daily Traffic: 150 (year 2035),  Design Load: H 15,  Features Intersected: WARD BRANCH,  Facility Carried by Structure: ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $464,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $510,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10914,  Location: 2 MI. N JCT. SR 27 (Lat: 31.576500,  Lng: -85.280600),  Route carried "on" structure: US 431,  Year Built: 1973,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 3,885 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,030 (year 2033),  Design Load: HS 20,  Features Intersected: SEABOARD RR(ABANDONED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.852,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 15 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.56m (24.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,178,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,396,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10915,  Location: 2 MI. N JCT. SR.-27 (Lat: 31.576433,  Lng: -85.280350),  Route carried "on" structure: US 431,  Year Built: 1973,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 3,885 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,030 (year 2033),  Design Load: HS 20,  Features Intersected: SEABOARD RR (ABANDONED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.852,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 15 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.56m (24.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,178,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,396,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11366,  Location: RC CULVERT ON FAS RT 18 (Lat: 31.551697,  Lng: -85.312750),  Route carried "on" structure: County highway 40,  Year Built: 1975,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 650 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 900 (year 2034),  Design Load: H 15,  Features Intersected: POOR CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $414,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $455,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12516,  Location: RCDG BRIDGE ON FAS RT. 01 (Lat: 31.507661,  Lng: -85.220878),  Route carried "on" structure: County highway 53,  Year Built: 1981,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 300 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2034),  Design Load: H 20,  Features Intersected: ABBIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,106,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,217,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12517,  Location: RCDG BRIDGE ON FAS RT. 01 (Lat: 31.507756,  Lng: -85.222544),  Route carried "on" structure: County highway 53,  Year Built: 1981,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 300 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2034),  Design Load: H 20,  Features Intersected: ABBIE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Underwater Inspection Date: December 2018,  Bridge Improvement Cost: $1,295,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,425,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13199,  Location: RC BR CULVT ON CAPPS RD. (Lat: 31.540575,  Lng: -85.325250),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 25 (year 2015),  Average Future Daily Traffic: 30 (year 2035),  Design Load: H 20,  Features Intersected: POOR CREEK,  Facility Carried by Structure: ROAD NO 25
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.58m (8.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $656,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $722,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13359,  Location: 2.1 MI.S. ABBEVILLE (Lat: 31.532283,  Lng: -85.209333),  Route carried "on" structure: State highway 95,  Year Built: 1984,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 1,020 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,412 (year 2033),  Design Load: HS 20,  Features Intersected: HOG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.275,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.69m (5.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $783,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $861,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1336,  Location: 2.0 MI.S.ABBEVILLE (Lat: 31.533133,  Lng: -85.209333),  Route carried "on" structure: State highway 95,  Year Built: 1984,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 1,020 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,412 (year 2033),  Design Load: HS 20,  Features Intersected: ABBIE CREEK SOUTH FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.452,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.73m (31.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,802,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $3,082,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13361,  Location: 1.9 MI. S. OF ABBEVILLE (Lat: 31.534133,  Lng: -85.212867),  Route carried "on" structure: State highway 95,  Year Built: 1984,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 1,020 (year 2013),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,412 (year 2033),  Design Load: HS 20,  Features Intersected: ABBIE CREEK NORTH FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.689,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,454,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $2,699,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13362,  Location: 1 MI.N.HENRY CO.37 (Lat: 31.647533,  Lng: -85.221550),  Route carried "on" structure: State highway 95,  Year Built: 1984,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 900 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,246 (year 2033),  Design Load: HS 20,  Features Intersected: BOGGY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.976,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 68.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $424,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16222,  Location: RC BR CULV ON FAS 08 (Lat: 31.536606,  Lng: -85.254811),  Route carried "on" structure: County highway 99,  Year Built: 1994,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 850 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,000 (year 2034),  Design Load: H 20,  Features Intersected: SKIPPER CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $808,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $889,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18526,  Location: 1 MILE EAST OF HWY 95 (Lat: 31.602886,  Lng: -85.218078),  Route carried "on" structure: County highway 46,  Year Built: 2002,  Status: Open,  Structure Length: 2.64m (8.66ft),  Average Daily Traffic: 500 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 650 (year 2034),  Design Load: HS 15,  Features Intersected: LITTLE ABBIE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 83.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.55m (11.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,081,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19213,  Location: MARY NELSON ROAD (Lat: 31.626711,  Lng: -85.270031),  Route carried "on" structure: County highway 90,  Year Built: 2005,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 6 (year 2014),  Average Future Daily Traffic: 8 (year 2034),  Design Load: H 20,  Features Intersected: CAT BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Abbeville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.