Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ahtanum, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 36ft / 10.7mTotal length
  • $12,768,000Total costs
  • 17,126Total average daily traffic
  • 1,031Total average daily truck traffic
  • 21,541Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ahtanum
  • No street view available for this location

New bridges in Ahtanum, WA - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 51970-1979
  • 31980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in Ahtanum, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 66.7%Good
  • 8.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 58.3%Good
  • 8.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 91.7%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 91.7%Very good
  • 8.3%Satisfactory
Find on map >>   Show street view

Structure Number: 79665,  Location: 00.51 S AHTANUM RD (Lat: 46.550883,  Lng: -120.628578),  Route carried "on" structure: County highway 33290,  Year Built: 1992,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 715 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 858 (year 2041),  Design Load: HS 20,  Features Intersected: BACHELOR CREEK,  Facility Carried by Structure: 90TH AVE.,S.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,064,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80052,  Location: 00.08 W SO 38TH AVE (Lat: 46.558333,  Lng: -120.560000),  Route carried "on" structure: County highway 30260,  Year Built: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 9,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,000 (year 2039),  Design Load: HS 20,  Features Intersected: BACHELOR CREEK,  Facility Carried by Structure: AHTANUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,094,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80132,  Location: 00.08 S AHTANUM RD (Lat: 46.556667,  Lng: -120.561667),  Route carried "on" structure: County highway 35570,  Year Built: 1974,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 365 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 565 (year 2039),  Design Load: H 15,  Features Intersected: BACHELOR CREEK,  Facility Carried by Structure: 42ND AVE.,S.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $973,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80454,  Location: 00.13 S RUTHERFORD (Lat: 46.540000,  Lng: -120.613333),  Route carried "on" structure: County highway 33170,  Year Built: 1963,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 135 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 275 (year 2041),  Design Load: HS 20,  Features Intersected: AHTANUM CREEK,  Facility Carried by Structure: 79TH AVE,N.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,034,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80591,  Location: 00.10 S OF AHTANUM (Lat: 46.545000,  Lng: -120.691667),  Route carried "on" structure: County highway 30750,  Year Built: 1985,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 550 (year 2039),  Design Load: HS 20,  Features Intersected: BACHELOR CREEK,  Facility Carried by Structure: MARKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 7 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $973,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80759,  Location: 00.37 N OF MEADOWBK (Lat: 46.548108,  Lng: -120.592458),  Route carried "on" structure: County highway 33140,  Year Built: 1984,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 532 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 680 (year 2040),  Design Load: HS 20,  Features Intersected: AHTANUM CREEK,  Facility Carried by Structure: 62ND AVE.,S.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 20.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,064,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80883,  Location: 00.40 N RUTHERFORD (Lat: 46.541667,  Lng: -120.691667),  Route carried "on" structure: County highway 30750,  Year Built: 1974,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 361 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 433 (year 2041),  Design Load: HS 20,  Features Intersected: HATTON CREEK,  Facility Carried by Structure: MARKS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,003,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80888,  Location: 00.01 SO EMMA LANE (Lat: 46.553333,  Lng: -120.563333),  Route carried "on" structure: County highway 35570,  Year Built: 1979,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 333 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2041),  Design Load: HS 20,  Features Intersected: AHTANUM CREEK,  Facility Carried by Structure: 42ND AVE.,S.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 25.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $684,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,368,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81535,  Location: 00.34 N SO AHTANUM (Lat: 46.533472,  Lng: -120.650122),  Route carried "on" structure: County highway 30210,  Year Built: 1979,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 167 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: HS 20,  Features Intersected: AHTANUM CREEK,  Facility Carried by Structure: WILEY ROAD SOUTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83314,  Location: 00.15 S WIDE HOLLOW (Lat: 46.579853,  Lng: -120.646378),  Route carried "on" structure: County highway 32890,  Year Built: 1987,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,859 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,450 (year 2041),  Design Load: HS 20,  Features Intersected: WIDE HOLLOW CREEK,  Facility Carried by Structure: DAZET ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,034,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 83316,  Location: 00.20 S WIDE HOLLOW (Lat: 46.579317,  Lng: -120.646397),  Route carried "on" structure: County highway 32890,  Year Built: 1970,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,859 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,450 (year 2041),  Design Load: HS 20,  Features Intersected: WIDE HOLLOW CREEK,  Facility Carried by Structure: DAZET ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,155,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 87401,  Location: .01 mi S of Wide Hollow R (Lat: 46.581828,  Lng: -120.636056),  Route carried "on" structure: County highway 32400,  Year Built: 2005,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 1,400 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,680 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: Wide Hollow Creek,  Facility Carried by Structure: 96th Ave.,S.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,003,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $2,006,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Discuss Ahtanum, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.