Bridge Statistics for Albion, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 223ft / 68.3mTotal length
  • $21,622,000Total costs
  • 44,929Total average daily traffic
  • 5,550Total average daily truck traffic
  • 71,975Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Albion
  • No street view available for this location

New bridges in Albion, OK - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 72010-2019
  • 12020-2022
Average Bridge Daily Traffic in Albion, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 87.5%Good
  • 12.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Very good
  • 50.0%Good
  • 12.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 12.5%Poor
  • 12.5%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Excellent
  • 35.7%Very good
  • 7.1%Good
  • 35.7%Satisfactory
  • 7.1%Fair
  • 7.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 71.4%Very good
  • 14.3%Good
  • 14.3%Serious
Find on map >>   Show street view

Structure Number: 382,  Location: 2.8 E .7 S OF ALBION (Lat: 34.652917,  Lng: -95.051206),  Route carried "on" structure: County highway N4485,  Year Built: 1933,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.878,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Critical,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 6 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $146,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $230,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8139,  Location: 2.7 MI E OF ALBION (Lat: 34.666275,  Lng: -95.050425),  Route carried "on" structure: County highway E1620,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $236,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1913,  Location: .2 N 1. E OF ALBION (Lat: 34.666128,  Lng: -95.082517),  Route carried "on" structure: County highway 6410C,  Year Built: 1976,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.826,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22419,  Location: 0.6 MI N OF I-40 (Lat: 35.467700,  Lng: -97.501158),  Route carried "on" structure: Interstate 235,  Year Built: 1989,  Status: Open,  Structure Length: 29.94m (98.23ft),  Average Daily Traffic: 40,100 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 64,160 (year 2040),  Design Load: HS 20,  Features Intersected: LINCOLN/I-235RMP/BNSF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 49.1m (161.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.92m (108.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $5,913,000,  Roadway Improvement Cost: $4,500,000,  Total Project Cost: $11,002,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22678,  Location: 3.5E & .2SOF ALBION (Lat: 34.658267,  Lng: -95.042456),  Route carried "on" structure: County highway 6415,  Year Built: 1990,  Status: Open,  Structure Length: 14.25m (46.75ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: KIAMICHI RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.25m (46.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $728,000,  Roadway Improvement Cost: $400,000,  Total Project Cost: $1,144,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23245,  Location: 2.5 W; 4.9 S TALIHINA (Lat: 34.681572,  Lng: -95.086611),  Route carried "on" structure: County highway N4465,  Year Built: 1992,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: ALBION CREEK,  Facility Carried by Structure: AIRPORT RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 32.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 13.51m (44.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27029,  Location: 1.8W 1N OF ALBION (Lat: 34.673556,  Lng: -95.131264),  Route carried "on" structure: County highway E1614,  Year Built: 2000,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 75 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 120 (year 2040),  Features Intersected: N. WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $501,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28878,  Location: 2.2 MI SW LEFLORE CO (Lat: 34.669369,  Lng: -95.081814),  Route carried "on" structure: US US271,  Year Built: 2010,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 990 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,584 (year 2040),  Design Load: HL 93,  Features Intersected: ALBION CREEK,  Facility Carried by Structure: U.S. 271
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.508,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $777,000,  Roadway Improvement Cost: $1,333,000,  Total Project Cost: $2,222,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28879,  Location: 1.6 MI SW OF ALBION (Lat: 34.651144,  Lng: -95.119828),  Route carried "on" structure: US 271,  Year Built: 2010,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 760 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,216 (year 2040),  Design Load: HL 93,  Features Intersected: WALNUT CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.372,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 90.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 90.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.04m (19.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $777,000,  Roadway Improvement Cost: $1,333,000,  Total Project Cost: $2,222,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 28881,  Location: 2.8 MI SW LEFLORE CO (Lat: 34.665586,  Lng: -95.089339),  Route carried "on" structure: US 271,  Year Built: 2010,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 990 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,584 (year 2040),  Design Load: HL 93,  Features Intersected: ALBION CREEK TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.703,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.52m (11.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $777,000,  Roadway Improvement Cost: $1,333,000,  Total Project Cost: $2,222,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28882,  Location: 1.4 SW OF ALBION (Lat: 34.652403,  Lng: -95.116992),  Route carried "on" structure: US 271,  Year Built: 2010,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 760 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,216 (year 2040),  Design Load: HL 93,  Features Intersected: WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.661,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 29941,  Location: 2.3S; 1.5E OF ALBION (Lat: 34.626944,  Lng: -95.066667),  Route carried "on" structure: County highway N4478,  Year Built: 2010,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 24 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 40 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $299,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 30085,  Location: 2E;7N OF ALBION (Lat: 34.671944,  Lng: -95.095000),  Route carried "on" structure: County highway N4460,  Year Built: 2011,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Poor,  Culverts: Serious,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Total Project Cost: $225,000
Find on map >>   Show street view

Structure Number: 30378,  Location: 2.6E 1.8S OF ALBION (Lat: 34.637222,  Lng: -95.054722),  Route carried "on" structure: County highway E1640,  Year Built: 2011,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 55 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Total Project Cost: $225,000
Find on map >>   Show street view

Structure Number: 31547,  Location: 5.5 SW OF LEFLORE C/L (Lat: 34.648056,  Lng: -95.127500),  Route carried "on" structure: US 271,  Year Built: 2021,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 800 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,280 (year 2040),  Design Load: HL 93,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.882,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 64.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Discuss Albion, Oklahoma (OK) on our hugely popular Oklahoma forum.