Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Alden, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 79ft / 24.2mTotal length
  • $17,505,000Total costs
  • 26,988Total average daily traffic
  • 1,099Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Alden
  • No street view available for this location

New bridges in Alden, NY - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 31960-1969
  • 11980-1989
  • 41990-1999
  • 12010-2019
Average Bridge Daily Traffic in Alden, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 50.0%Good
  • 12.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 62.5%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 62.5%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 331544,  Location: 3.9 MILES SW OF CORFU (Lat: 42.924322,  Lng: -78.463886),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 542 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 759 (year 2037),  Design Load: H 20,  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: COUNTY LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $461,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332684,  Location: .6 MILE NORTH OF ALDEN (Lat: 42.908392,  Lng: -78.492081),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,814 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,481 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SPRING CREEK,  Facility Carried by Structure: ALDEN-CRITTENDEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Channel: Good,  Culverts: Excellent,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $427,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $677,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332685,  Location: 1 MILE NORTH OF ALDEN (Lat: 42.914556,  Lng: -78.493639),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 3,102 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,133 (year 2040),  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: ALDEN-CRITTENDEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,892,000,  Roadway Improvement Cost: $1,108,000,  Total Project Cost: $3,000,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332697,  Location: 1.8 MILES NW OF ALDEN (Lat: 42.916133,  Lng: -78.522953),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 1,999 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,799 (year 2040),  Design Load: HS 20,  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: SANDRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.703,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,771,000,  Roadway Improvement Cost: $1,037,000,  Total Project Cost: $2,808,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332707,  Location: 1.6 MILES NE OF ALDEN (Lat: 42.921956,  Lng: -78.484536),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 1,264 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,770 (year 2037),  Design Load: HS 20,  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: NORTH ROAD/CR 166
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.347,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 96.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 74.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,061,000,  Roadway Improvement Cost: $621,000,  Total Project Cost: $1,682,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 332708,  Location: 1 MILE NORTH OF ALDEN (Lat: 42.921906,  Lng: -78.473142),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 1,264 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,770 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: NORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.248,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,391,000,  Roadway Improvement Cost: $815,000,  Total Project Cost: $2,206,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332709,  Location: 1 MILE NORTH OF ALDEN (Lat: 42.921886,  Lng: -78.469911),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 1,264 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,770 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: NORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.521,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 78.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $990,000,  Roadway Improvement Cost: $580,000,  Total Project Cost: $1,570,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332736,  Location: 1.8 MI SE JCT US20 &SH358 (Lat: 42.879931,  Lng: -78.521981),  Route carried "on" structure: County highway ,  Year Built: 1960,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 719 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,007 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: THREE ROD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.137,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,138,000,  Roadway Improvement Cost: $666,000,  Total Project Cost: $1,804,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336252,  Location: .2 MI S JCT SH 33 & CR 1 (Lat: 42.942756,  Lng: -78.487397),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 2,569 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,594 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/ AMTRAK,  Facility Carried by Structure: ALDEN CRTTNDEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.924,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,079,000,  Roadway Improvement Cost: $1,218,000,  Total Project Cost: $3,297,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 70156,  Location: 2.6 MI E JCT RTS 20 + 358 (Lat: 42.897033,  Lng: -78.503928),  Route carried "under" structure: US 20,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 11,451 (year 1999),  Features Intersected: RTE 20,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 70.490,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 28.9m (94.8ft)

Discuss Alden, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.