Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Allegany, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 551ft / 168mTotal length
  • $128,165,000Total costs
  • 88,253Total average daily traffic
  • 6,748Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Allegany
  • No street view available for this location

New bridges in Allegany, NY - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 91970-1979
  • 71980-1989
  • 32000-2009
  • 12010-2019
Reconstructed bridges in Allegany, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Allegany, NY
Average Bridge Truck Traffic in Allegany, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 46.2%Very good
  • 38.5%Good
  • 15.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 23.1%Very good
  • 53.8%Good
  • 7.7%Satisfactory
  • 15.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 53.8%Very good
  • 7.7%Good
  • 23.1%Satisfactory
  • 15.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Very good
  • 36.4%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: 101231,  Location: W VILLAGE LI OF ALLEGANY (Lat: 42.095014,  Lng: -78.501781),  Route carried "on" structure: State highway 417,  Year Built: 1980,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 4,740 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,762 (year 2040),  Design Load: HS 20,  Features Intersected: FIVE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.854,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,393,000,  Roadway Improvement Cost: $816,000,  Total Project Cost: $2,209,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1073791,  Location: 6 MI W JCT SH 16 & SH 417 (Lat: 42.101464,  Lng: -78.522392),  Route carried "on" structure: Interstate 86,  Year Built: 1988,  Status: Open,  Structure Length: 59.16m (194.09ft),  Average Daily Traffic: 6,049 (year 2014),  Truck Traffic: 17%,  Average Future Daily Traffic: 8,469 (year 2034),  Design Load: HS 20,  Features Intersected: RTE 417, Allegheny River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.798,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 54.8m (179.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 59.16m (194.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $25,581,000,  Roadway Improvement Cost: $14,980,000,  Total Project Cost: $40,561,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1073792,  Location: 6 MI W JCT SH 16 & SH 417 (Lat: 42.101286,  Lng: -78.521831),  Route carried "on" structure: Interstate 86,  Year Built: 1988,  Status: Open,  Structure Length: 60.96m (200.00ft),  Average Daily Traffic: 4,840 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,764 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 417, Allegany River,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.572,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 54.8m (179.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 60.96m (200.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $26,307,000,  Roadway Improvement Cost: $15,405,000,  Total Project Cost: $41,712,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109201,  Location: AT INT I86 & RT 952W (Lat: 42.102867,  Lng: -78.507464),  Route carried "on" structure: State highway 952W,  Year Built: 1973,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 3,547 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,388 (year 2040),  Design Load: HS 20,  Features Intersected: 86I 17 51123127, RTE I86
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.5m (142.7ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.83m (28.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $7,649,000,  Roadway Improvement Cost: $4,479,000,  Total Project Cost: $12,129,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1092021,  Location: 0.6 MI NE JCT 17 + 417 (Lat: 42.102839,  Lng: -78.502594),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 5,764 (year 2014),  Truck Traffic: 19%,  Design Load: HS 20,  Features Intersected: FIVE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.745,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Poor,  Substructure: Very good,  Channel: Very good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,966,000,  Roadway Improvement Cost: $1,737,000,  Total Project Cost: $4,703,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1092022,  Location: 0.6 MI NE JCT 17 + 417 (Lat: 42.102503,  Lng: -78.502742),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 3,840 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,303 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Five Mile Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.745,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Very good,  Superstructure: Poor,  Substructure: Very good,  Channel: Very good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,521,000,  Roadway Improvement Cost: $2,062,000,  Total Project Cost: $5,582,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1092031,  Location: 0.4 MI E ALLEGANY INT. (Lat: 42.102828,  Lng: -78.500100),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 5,764 (year 2014),  Truck Traffic: 19%,  Design Load: HS 25 or greater,  Features Intersected: Five Mile Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.970,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,125,000,  Roadway Improvement Cost: $1,244,000,  Total Project Cost: $3,369,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1092032,  Location: 0.4 MI E ALLEGANY INT. (Lat: 42.102489,  Lng: -78.500081),  Route carried "on" structure: Interstate 86,  Year Built: 1973,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 3,840 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 4,303 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FIVE MILE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.002,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,125,000,  Roadway Improvement Cost: $1,244,000,  Total Project Cost: $3,369,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 227105,  Location: In Allegany (Lat: 42.139547,  Lng: -78.776922),  Route carried "on" structure: Other road 951,  Year Built: 2014,  Status: Temporarily open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 436 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 610 (year 2038),  Features Intersected: Phil Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.279,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $2,019,000,  Roadway Improvement Cost: $1,182,000,  Total Project Cost: $3,201,000 ( Estimate for 2021),  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 332043,  Location: 3.6 MI SE OF HUMPHREY (Lat: 42.160092,  Lng: -78.504414),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 2,240 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,262 (year 2040),  Features Intersected: FIVE MILE CREEK,  Facility Carried by Structure: FIVE MILE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.581,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 79.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $471,000,  Roadway Improvement Cost: $276,000,  Total Project Cost: $747,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332044,  Location: 0.16 KM W OF ALLEGANY (Lat: 42.090128,  Lng: -78.501594),  Route carried "on" structure: County highway ,  Year Built: 1973,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 4,773 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,905 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ALLEGHENY RIVER,  Facility Carried by Structure: FIVE MILE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.4m (99.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.19m (39.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $4,593,000,  Roadway Improvement Cost: $2,690,000,  Total Project Cost: $7,283,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332048,  Location: 3.2 MI NORTH OF ALLEGANY (Lat: 42.149322,  Lng: -78.508419),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 124 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 174 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: FIVEMILE CREEK,  Facility Carried by Structure: EATON CROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $275,000,  Total Project Cost: $744,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336026,  Location: 1.0 MI N OF ALLEGANY (Lat: 42.115942,  Lng: -78.501600),  Route carried "on" structure: Other road ,  Year Built: 1969,  Year Reconstructed: 2015,  Status: Posted for load-capacity,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 571 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 706 (year 2040),  Design Load: H 20,  Features Intersected: FIVE MILE CREEK,  Facility Carried by Structure: CHAPIN CROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $1,367,000,  Roadway Improvement Cost: $801,000,  Total Project Cost: $2,168,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 336985,  Location: 1.5 MI N JCT CR 19 & I86 (Lat: 42.124192,  Lng: -78.500914),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 3,508 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,340 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SMITH HOLLOW,  Facility Carried by Structure: FIVE MILE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.558,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $388,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1073791,  Location: 6 MI W JCT SH 16 & SH 417 (Lat: 42.101464,  Lng: -78.522392),  Route carried "under" structure: Alternate State highway 417,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 1985),  Features Intersected: RTE 417, Allegheny River,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 7.54m (24.74ft),  Kilometerpoint: 20.643,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.8m (179.8ft)

Find on map >>   Show street view

Structure Number: 1073791,  Location: 6 MI W JCT SH 16 & SH 417 (Lat: 42.101464,  Lng: -78.522392),  Route carried "under" structure: County highway ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2012),  Features Intersected: RTE 417, Allegheny River,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.8m (179.8ft)

Find on map >>   Show street view

Structure Number: 1073792,  Location: 6 MI W JCT SH 16 & SH 417 (Lat: 42.101286,  Lng: -78.521831),  Route carried "under" structure: County highway ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2021),  Features Intersected: RTE 417, Allegany River,,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.8m (179.8ft)

Find on map >>   Show street view

Structure Number: 1073792,  Location: 6 MI W JCT SH 16 & SH 417 (Lat: 42.101286,  Lng: -78.521831),  Route carried "under" structure: Alternate State highway 417,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 1985),  Features Intersected: RTE 417, Allegany River,,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 7.19m (23.59ft),  Kilometerpoint: 20.643,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.8m (179.8ft)

Find on map >>   Show street view

Structure Number: 109201,  Location: AT INT I86 & RT 952W (Lat: 42.102867,  Lng: -78.507464),  Route carried "under" structure: Interstate 86,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 18,433 (year 1999),  Features Intersected: 86I 17 51123127, RTE I86,  Facility Carried by Structure: RTE 952W
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 20.820,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.5m (142.7ft)

Find on map >>   Show street view

Structure Number: 1092031,  Location: 0.4 MI E ALLEGANY INT. (Lat: 42.102828,  Lng: -78.500100),  Route carried "under" structure: Other road ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,192 (year 2020),  Truck Traffic: 4%,  Features Intersected: Five Mile Road,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 1092032,  Location: 0.4 MI E ALLEGANY INT. (Lat: 42.102489,  Lng: -78.500081),  Route carried "under" structure: Other road ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 1,192 (year 2020),  Truck Traffic: 4%,  Features Intersected: FIVE MILE RD,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Discuss Allegany, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.