Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Almont, North Dakota (ND)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 118ft / 35.7mTotal length
  • $849,000Total costs
  • 1,372Total average daily traffic
  • 98Total average daily truck traffic
  • 1,597Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Almont
  • No street view available for this location

New bridges in Almont, ND - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 21960-1969
  • 31970-1979
  • 41980-1989
  • 21990-1999
  • 12010-2019
  • 12020-2022
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 30.8%Very good
  • 61.5%Good
  • 7.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 38.5%Very good
  • 30.8%Good
  • 23.1%Satisfactory
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 46.2%Very good
  • 15.4%Good
  • 7.7%Satisfactory
  • 7.7%Fair
  • 23.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.3%Excellent
  • 33.3%Very good
  • 26.7%Good
  • 6.7%Satisfactory
  • 13.3%Fair
  • 6.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 30126161,  Location: 2 WEST 2 NORTH OF ALMONT (Lat: 46.752483,  Lng: -101.552950),  Route carried "on" structure: County highway 3020,  Year Built: 1987,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 72 (year 2018),  Average Future Daily Traffic: 60 (year 2038),  Design Load: HS 20,  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: County Road 138
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.239,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30126192,  Location: 1 SOUTH 2 WEST OF ALMONT (Lat: 46.714208,  Lng: -101.551517),  Route carried "on" structure: County highway ,  Year Built: 1936,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 5 (year 2018),  Average Future Daily Traffic: 5 (year 2038),  Features Intersected: DRAINAGE AREA,  Facility Carried by Structure: 52nd Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 16.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $128,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $192,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 3012716,  Location: 2 WEST 1 NORTH OF ALMONT (Lat: 46.747231,  Lng: -101.542981),  Route carried "on" structure: County highway 3020,  Year Built: 1984,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 72 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2038),  Design Load: H 20,  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: County Road 138
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.848,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3012815,  Location: 2 NORTH OF ALMONT (Lat: 46.768553,  Lng: -101.509756),  Route carried "on" structure: County highway 3027,  Year Built: 1989,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 321 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2038),  Design Load: HS 20,  Features Intersected: HAIL STORM CREEK,  Facility Carried by Structure: County Road 86
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.768,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3012818,  Location: CITY OF ALMONT (Lat: 46.723358,  Lng: -101.509739),  Route carried "on" structure: County highway 3027,  Year Built: 2019,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 350 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2039),  Design Load: H 15,  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: County Road 86
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.459,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.3m (63.3ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.85m (15.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $327,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30128181,  Location: 1 WEST OF ALMONT (Lat: 46.717894,  Lng: -101.529408),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 85 (year 2018),  Average Future Daily Traffic: 85 (year 2038),  Features Intersected: CREEK,  Facility Carried by Structure: County Road 137
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 30128182,  Location: 1 WEST OF ALMONT (Lat: 46.717517,  Lng: -101.523692),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 95 (year 2018),  Average Future Daily Traffic: 95 (year 2038),  Features Intersected: CREEK,  Facility Carried by Structure: County Road 137
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 69.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $22,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $33,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 3012819,  Location: 1 SOUTH OF ALMONT (Lat: 46.715886,  Lng: -101.511222),  Route carried "on" structure: County highway 3027,  Year Built: 1968,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 110 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2038),  Features Intersected: DRAINAGE AREA,  Facility Carried by Structure: County Highway 86
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.137,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Very good,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $30,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 30129142,  Location: 4 SOUTH 4 WEST NEW SALEM (Lat: 46.775278,  Lng: -101.497564),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 5 (year 2018),  Average Future Daily Traffic: 5 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SIMMS CREEK,  Facility Carried by Structure: 44th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 3012918,  Location: 1 EAST OF ALMONT (Lat: 46.718481,  Lng: -101.489922),  Route carried "on" structure: County highway 3020,  Year Built: 1980,  Status: Posted for load,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 130 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 150 (year 2038),  Design Load: H 20,  Features Intersected: HAIL STORM CREEK,  Facility Carried by Structure: County Road 137
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.514,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 29.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30129181,  Location: 1 E 1 S ALMONT (Lat: 46.717503,  Lng: -101.493539),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 2002,  Status: Posted for load,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 5 (year 2018),  Average Future Daily Traffic: 5 (year 2038),  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 16.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $178,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $267,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 3013015,  Location: 2 NORTH 1 EAST OF ALMONT (Lat: 46.760642,  Lng: -101.486575),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 50 (year 2039),  Design Load: HL 93,  Features Intersected: CREEK,  Facility Carried by Structure: COUNTY HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 30130201,  Location: 2 EAST 3 SOUTH OF ALMONT (Lat: 46.694158,  Lng: -101.467608),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 24 (year 2018),  Average Future Daily Traffic: 24 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: 48th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 30130202,  Location: 2 EAST 3 SOUTH OF ALMONT (Lat: 46.697000,  Lng: -101.466997),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Posted for load,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 24 (year 2018),  Average Future Daily Traffic: 24 (year 2038),  Features Intersected: CREEK,  Facility Carried by Structure: 48th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Poor,  Channel: Excellent,  Operating Rating: 30.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 3013221,  Location: 3 EAST 3 SOUTH OF ALMONT (Lat: 46.679908,  Lng: -101.437881),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 24 (year 2018),  Average Future Daily Traffic: 24 (year 2038),  Design Load: HS 20,  Features Intersected: BIG MUDDY CREEK,  Facility Carried by Structure: Valley Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Other
Discuss Almont, North Dakota (ND) on our hugely popular North Dakota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.