  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 509ft / 155mTotal length
  • $8,406,000Total costs
  • 72,073Total average daily traffic
  • 4,919Total average daily truck traffic
  • 110,999Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Alum Creek
  • No street view available for this location

New bridges in Alum Creek, WV - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11970-1979
  • 141980-1989
  • 61990-1999
  • 42000-2009
Average Bridge Daily Traffic in Alum Creek, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.2%Very good
  • 16.7%Good
  • 50.0%Satisfactory
  • 20.8%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.2%Very good
  • 25.0%Good
  • 58.3%Satisfactory
  • 8.3%Fair
  • 4.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.2%Very good
  • 37.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 8.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.8%Excellent
  • 26.9%Very good
  • 38.5%Good
  • 19.2%Satisfactory
  • 11.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Serious
Find on map >>   Show street view

Structure Number: 20A019,  Location: 0.77 MI W OF CR 9 (Lat: 38.298150,  Lng: -81.802489),  Route carried "on" structure: County highway 95,  Year Built: 1976,  Status: Open,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 52 (year 2040),  Design Load: HS 20,  Features Intersected: CROOKED CREEK,  Facility Carried by Structure: CR 9/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $550,000 ( Estimate for 2019),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20A024,  Location: 0.01 MI S OF CR 15 (Lat: 38.242131,  Lng: -81.768069),  Route carried "on" structure: County highway 1102,  Year Built: 1990,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 488 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BRIER CREEK,  Facility Carried by Structure: CR 11/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A029,  Location: 0.38 MI N OF CR 11/2 (Lat: 38.243731,  Lng: -81.767519),  Route carried "on" structure: County highway 1500,  Year Built: 1980,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 450 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 590 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE BRIER CREEK,  Facility Carried by Structure: COUNTY ROUTE 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.249,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $250,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A044,  Location: 0.03 MI N OF CR 11/2 (Lat: 38.239550,  Lng: -81.771089),  Route carried "on" structure: County highway 1800,  Year Built: 1989,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 122 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BRIER CREEK,  Facility Carried by Structure: COUNTY ROUTE 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.483,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A289,  Location: 0.01 MI NORTH OF CR 13/1 (Lat: 38.286519,  Lng: -81.806669),  Route carried "on" structure: State highway 214,  Year Built: 1987,  Status: Open,  Structure Length: 9.18m (30.12ft),  Average Daily Traffic: 1,900 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,318 (year 2038),  Design Load: HS 20,  Features Intersected: COAL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.18m (30.12ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $350,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A3,  Location: 0.01 MI S OF CR 9/4 (Lat: 38.310881,  Lng: -81.791700),  Route carried "on" structure: County highway 9,  Year Built: 1991,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 1,800 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,196 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CROOKED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.736,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A572,  Location: 0.04 MI N OF PUBLIC RD 87 (Lat: 38.222269,  Lng: -81.834569),  Route carried "on" structure: US 119,  Year Built: 1981,  Status: Open,  Structure Length: 19.36m (63.52ft),  Average Daily Traffic: 6,350 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,747 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE COAL RIVER CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 49.7m (163.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.36m (63.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,350,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A573,  Location: 0.04 MI N OF PUBLIC RD 87 (Lat: 38.222219,  Lng: -81.834811),  Route carried "on" structure: US 119,  Year Built: 1981,  Status: Open,  Structure Length: 19.37m (63.55ft),  Average Daily Traffic: 6,350 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,747 (year 2038),  Design Load: HS 20,  Features Intersected: LITTLE COAL RV , CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 49.7m (163.1ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.37m (63.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $800,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A574,  Location: 0.50 MILE S OF CR 15/9 (Lat: 38.268100,  Lng: -81.788739),  Route carried "on" structure: US 119,  Year Built: 1981,  Status: Open,  Structure Length: 24.73m (81.14ft),  Average Daily Traffic: 8,100 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,882 (year 2038),  Design Load: HS 20,  Features Intersected: BIG COAL RIVER CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.686,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.73m (81.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,300,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,400,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A575,  Location: 0.50 MI S OF CR 1519 (Lat: 38.268131,  Lng: -81.789031),  Route carried "on" structure: US 119,  Year Built: 1981,  Status: Open,  Structure Length: 24.73m (81.14ft),  Average Daily Traffic: 8,100 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,882 (year 2039),  Design Load: HS 20,  Features Intersected: BIG COAL RIVER CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.686,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.73m (81.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,500,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A721,  Location: 0.39 MI E OF CR 9 (Lat: 38.332531,  Lng: -81.795389),  Route carried "on" structure: County highway 12,  Year Built: 1996,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 1,500 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,830 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: SMITH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A742,  Location: 0.02 MI W OF CR 9 (Lat: 38.309481,  Lng: -81.791239),  Route carried "on" structure: County highway 915,  Year Built: 1997,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 40 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 50 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CROOKED CREEK,  Facility Carried by Structure: CR 9/15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A805,  Location: 0.01 MIL W OF WV 214 (Lat: 38.284619,  Lng: -81.784739),  Route carried "on" structure: County highway 21412,  Year Built: 2002,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 70 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 85 (year 2038),  Design Load: HS 20,  Features Intersected: ALUM CREEK,  Facility Carried by Structure: CR 214/12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A835,  Location: 0.01 MI SOUTH OF CR 12 (Lat: 38.332700,  Lng: -81.802019),  Route carried "on" structure: County highway 900,  Year Built: 2009,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 1,543 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,882 (year 2037),  Design Load: HL 93,  Features Intersected: SMITH CREEK,  Facility Carried by Structure: COUNTY ROUTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.601,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22A019,  Location: 0.07 MI SOUTH OF CR 119/2 (Lat: 38.215789,  Lng: -81.834919),  Route carried "on" structure: County highway 509,  Year Built: 1990,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 550 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 550 (year 2036),  Design Load: HS 20,  Features Intersected: COBB CREEK,  Facility Carried by Structure: CR 5/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.505,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.5m (57.4ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $126,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $200,000 ( Estimate for 2018),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 22A047,  Location: 0.04 MI NORTH OF CR 8 (Lat: 38.311900,  Lng: -81.843800),  Route carried "on" structure: County highway 1200,  Year Built: 1982,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 50 (year 2039),  Features Intersected: ISLAND CREEK,  Facility Carried by Structure: CO 12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.982,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $95,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $135,000 ( Estimate for 2017)
Find on map >>   Show street view

Structure Number: 22A048,  Location: 0.01 MI WEST OF WV 214 (Lat: 38.282561,  Lng: -81.823189),  Route carried "on" structure: County highway 1301,  Year Built: 1987,  Status: Open,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 524 (year 2038),  Design Load: HS 20,  Features Intersected: FUQUAY CREEK,  Facility Carried by Structure: CR 13/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 22A05,  Location: 0.02 MI WEST OF CR 5/9 (Lat: 38.215681,  Lng: -81.848281),  Route carried "on" structure: County highway 1402,  Year Built: 1984,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 350 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 350 (year 2038),  Design Load: HS 20,  Features Intersected: COBB CREEK,  Facility Carried by Structure: CR 14/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.775,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $140,000 ( Estimate for 2017),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22A085,  Location: 0.53 MI WEST OF CR 13/1 (Lat: 38.275439,  Lng: -81.825131),  Route carried "on" structure: State highway 21400,  Year Built: 1940,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,600 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,648 (year 2038),  Features Intersected: FUQUAY CREEK,  Facility Carried by Structure: WV 214
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.335,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $321,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22A1,  Location: 0.05 MI NORTH OF CR 8 (Lat: 38.267100,  Lng: -81.805439),  Route carried "on" structure: US 11900,  Year Built: 1982,  Status: Open,  Structure Length: 15.17m (49.77ft),  Average Daily Traffic: 15,500 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 30,780 (year 2037),  Design Load: HS 20,  Features Intersected: LITTLE COAL RIVER,  Facility Carried by Structure: US 119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.859,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.15m (49.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $611,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $705,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22A101,  Location: 0.05 MI NORTH OF CR 8 (Lat: 38.267239,  Lng: -81.805650),  Route carried "on" structure: US 11900,  Year Built: 1982,  Status: Open,  Structure Length: 15.17m (49.77ft),  Average Daily Traffic: 15,500 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 30,780 (year 2037),  Design Load: HS 20,  Features Intersected: LITTLE COAL RIVER,  Facility Carried by Structure: US 119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.859,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.12m (49.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $611,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $705,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22A111,  Location: 0.01 MI EAST OF WV 214 (Lat: 38.260861,  Lng: -81.835939),  Route carried "on" structure: County highway 11901,  Year Built: 1981,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 500 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 525 (year 2039),  Design Load: HS 20,  Features Intersected: FUQUAY CREEK,  Facility Carried by Structure: CR 119/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.6m (21.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 22A136,  Location: 0.01 MILE SOUTH OF CR 5/9 (Lat: 38.223289,  Lng: -81.861819),  Route carried "on" structure: County highway 514,  Year Built: 2002,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 20 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 20 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: COBB CREEK,  Facility Carried by Structure: CR 5/14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22A139,  Location: 0.01 MILES S OF C. R. 5/9 (Lat: 38.217061,  Lng: -81.842000),  Route carried "on" structure: County highway 1401,  Year Built: 1990,  Status: Open,  Structure Length: 1.70m (5.58ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 11 (year 2039),  Design Load: HS 20,  Features Intersected: ELY FORK,  Facility Carried by Structure: COUNTY ROUTE 14/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 22A14,  Location: 0.75 MI N OF W V 214 (Lat: 38.293800,  Lng: -81.821131),  Route carried "on" structure: County highway 1305,  Year Built: 2004,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 50 (year 2016),  Average Future Daily Traffic: 50 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: FUQUAY CREEK,  Facility Carried by Structure: COUNTY ROUTE 13/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22A144,  Location: 1.08 MILES N OF WV 214 (Lat: 38.299511,  Lng: -81.812500),  Route carried "on" structure: County highway 800,  Year Built: 1982,  Year Reconstructed: 2005,  Status: Open,  Structure Length: 2.60m (8.53ft),  Average Daily Traffic: 800 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 840 (year 2040),  Features Intersected: FUQUAY CREEK,  Facility Carried by Structure: COUNTY ROUTE 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.748,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Alum Creek, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.