Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Amity, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 125ft / 38.1mTotal length
  • $25,135,000Total costs
  • 17,130Total average daily traffic
  • 1,492Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Amity
  • No street view available for this location

New bridges in Amity, NY - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 21960-1969
  • 71970-1979
  • 31980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Amity, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Amity, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Excellent
  • 16.7%Very good
  • 25.0%Good
  • 41.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Excellent
  • 7.7%Very good
  • 38.5%Good
  • 15.4%Satisfactory
  • 30.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Very good
  • 23.1%Good
  • 23.1%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Very good
  • 26.7%Good
  • 26.7%Satisfactory
  • 33.3%Fair
  • 6.7%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 101498,  Location: .8 MI NW JCT SR19 & SR244 (Lat: 42.230911,  Lng: -78.049383),  Route carried "on" structure: State highway 19,  Year Built: 1957,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 3,649 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,683 (year 2040),  Design Load: H 20,  Features Intersected: TUCKER CORNERS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.470,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $384,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 101499,  Location: .6 MI S JCT I86 & SR 19 (Lat: 42.251906,  Lng: -78.057869),  Route carried "on" structure: State highway 19,  Year Built: 2008,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 3,649 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,683 (year 2040),  Design Load: HL 93,  Features Intersected: WNY & Pa RR, Van Campen
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.899,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 58.0m (190.3ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,758,000,  Roadway Improvement Cost: $1,615,000,  Total Project Cost: $4,374,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104287,  Location: 1.5 MI NE JCT RTS 19 +244 (Lat: 42.240253,  Lng: -78.016531),  Route carried "on" structure: State highway 244,  Year Built: 1997,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 901 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 939 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FEATHERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $451,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 104288,  Location: 3.1 MI NE JCT SH19 &SH244 (Lat: 42.245536,  Lng: -77.987936),  Route carried "on" structure: State highway 244,  Year Built: 2010,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 901 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 939 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: N BR PHILLIPS CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.004,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $589,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $934,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 106166,  Location: JCT RTS 17 + 19 (Lat: 42.260089,  Lng: -78.063058),  Route carried "on" structure: State highway 19,  Year Built: 1971,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 3,649 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,683 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 86I 17 61032148 (WB), RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.913,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.46m (24.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $5,001,000,  Roadway Improvement Cost: $2,928,000,  Total Project Cost: $7,929,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 221396,  Location: 3.0 MI NE BELMONT (Lat: 42.246522,  Lng: -77.960969),  Route carried "on" structure: Alternate Other road ,  Year Built: 1979,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 50 (year 2018),  Average Future Daily Traffic: 70 (year 2038),  Design Load: H 20,  Features Intersected: PHILLIPS CREEK,  Facility Carried by Structure: IRISH SETTLEMENT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $557,000,  Roadway Improvement Cost: $326,000,  Total Project Cost: $883,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221397,  Location: 3.1MI NE JCT RTS19&244 (Lat: 42.243953,  Lng: -77.989731),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 117 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 164 (year 2038),  Design Load: HS 20,  Features Intersected: PHILLIPS CREEK,  Facility Carried by Structure: OLD WITHEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $478,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $757,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221398,  Location: 1.2 MI SE OF BELMONT (Lat: 42.206564,  Lng: -78.023508),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 543 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 760 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: LONG GORE CREEK,  Facility Carried by Structure: BACK RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.620,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $892,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221399,  Location: 0.2 MI SOUTH AMITY LAKE (Lat: 42.213519,  Lng: -77.982739),  Route carried "on" structure: ServiceOther road ,  Year Built: 1980,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 175 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 245 (year 2040),  Design Load: H 20,  Features Intersected: PLUM BOTTOM CRK,  Facility Carried by Structure: SAUNDERS HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $688,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221402,  Location: 1 MILE NORTH OF SCIO (Lat: 42.186064,  Lng: -77.969819),  Route carried "on" structure: Other road ,  Year Built: 1969,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 95 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 133 (year 2040),  Design Load: HS 20,  Features Intersected: DRY BROOK,  Facility Carried by Structure: DRY BROOK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $314,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $498,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221403,  Location: 2.0 MI SE OF BELMONT (Lat: 42.205953,  Lng: -78.004003),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 54 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 76 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: PLUM BOTTOM CRK,  Facility Carried by Structure: INGRAHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $179,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221404,  Location: 1.9 MI NE OF BELMONT (Lat: 42.245222,  Lng: -78.013900),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 216 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 302 (year 2038),  Features Intersected: FEATHERS CREEK,  Facility Carried by Structure: FEATHERS CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $632,000,  Roadway Improvement Cost: $370,000,  Total Project Cost: $1,003,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 225468,  Location: 3.2 MILES SE OF BELMONT (Lat: 42.216014,  Lng: -77.971217),  Route carried "on" structure: Other road ,  Year Built: 1974,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 28 (year 2020),  Average Future Daily Traffic: 39 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: PLUM BOTTOM CREEK,  Facility Carried by Structure: PLUM BOTTOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.331,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Serious,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $657,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $1,042,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33299,  Location: 2.8 MI NE OF BELMONT (Lat: 42.249072,  Lng: -77.987925),  Route carried "on" structure: County highway ,  Year Built: 1978,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 136 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 190 (year 2039),  Features Intersected: N BR PHILLIPS CRK,  Facility Carried by Structure: COUNTY ROAD 2B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $594,000,  Roadway Improvement Cost: $348,000,  Total Project Cost: $941,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332991,  Location: 3.5 MILES NE OF BELMONT (Lat: 42.252617,  Lng: -77.974303),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 136 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 190 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: N BR PHILLIPS CRK,  Facility Carried by Structure: COUNTY ROAD 2B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.738,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $748,000,  Roadway Improvement Cost: $438,000,  Total Project Cost: $1,186,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332992,  Location: 1.5 MI S OF BELMONT (Lat: 42.206569,  Lng: -78.022561),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 6.55m (21.49ft),  Average Daily Traffic: 381 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 533 (year 2036),  Features Intersected: GENESEE RIVER,  Facility Carried by Structure: COUNTY ROAD 31A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.967,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.55m (21.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,888,000,  Roadway Improvement Cost: $1,106,000,  Total Project Cost: $2,994,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106166,  Location: JCT RTS 17 + 19 (Lat: 42.260089,  Lng: -78.063058),  Route carried "under" structure: Interstate 86,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 2,450 (year 1975),  Features Intersected: 86I 17 61032148 (WB), RT,  Facility Carried by Structure: RTE 19
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 23.861,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.5m (119.8ft)

Discuss Amity, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.