  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 246ft / 74.8mTotal length
  • $24,378,000Total costs
  • 28,814Total average daily traffic
  • 2,567Total average daily truck traffic
  • 39,753Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Andalusia
  • No street view available for this location

New bridges in Andalusia, AL - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 41950-1959
  • 61960-1969
  • 11980-1989
  • 61990-1999
  • 32000-2009
  • 12010-2019
Reconstructed bridges in Andalusia, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 31990-1999
Average Bridge Daily Traffic in Andalusia, AL
Average Bridge Truck Traffic in Andalusia, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 53.8%Very good
  • 23.1%Good
  • 15.4%Satisfactory
  • 7.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 38.5%Very good
  • 38.5%Good
  • 15.4%Satisfactory
  • 7.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.8%Very good
  • 38.5%Good
  • 15.4%Satisfactory
  • 15.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Very good
  • 18.2%Good
  • 36.4%Satisfactory
  • 18.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 3734,  Location: 1 MI N OF ANDALUSIA (Lat: 31.335197,  Lng: -86.458547),  Route carried "on" structure: County highway 33,  Year Built: 1950,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 110 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 215 (year 2032),  Design Load: H 15,  Features Intersected: NO NAME BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $288,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5981,  Location: 1.5 MI. E. OF HEATH (Lat: 31.355814,  Lng: -86.444144),  Route carried "on" structure: County highway 70,  Year Built: 1957,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 280 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 392 (year 2032),  Design Load: H 15,  Features Intersected: FIVE RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5982,  Location: 1.7 MI. E. OF HEATH (Lat: 31.350461,  Lng: -86.434892),  Route carried "on" structure: County highway 70,  Year Built: 1957,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 280 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 392 (year 2032),  Design Load: H 15,  Features Intersected: FIVE RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $366,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10588,  Location: 2 MI N. OF LIBERTYVILLE (Lat: 31.266233,  Lng: -86.451156),  Route carried "on" structure: County highway 56,  Year Built: 1961,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 110 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 143 (year 2030),  Design Load: H 15,  Features Intersected: N0 NAME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 77.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.97m (6.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12767,  Location: 5.2 MI.E.US 29 (Lat: 31.316564,  Lng: -86.419428),  Route carried "on" structure: US 84,  Year Built: 1982,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 4,150 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,567 (year 2033),  Design Load: HS 20,  Features Intersected: FIVE RUN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 220.356,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,957,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,153,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1288,  Location: 3 MI EAST OF ANDALUSIA (Lat: 31.275625,  Lng: -86.435522),  Route carried "on" structure: County highway 45,  Year Built: 1951,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 520 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 673 (year 2030),  Design Load: HS 20,  Features Intersected: FIVE RUNS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,320,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $2,552,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1498,  Location: HENRY HUGGINS RD (Lat: 31.287803,  Lng: -86.440661),  Route carried "on" structure: County highway 101,  Year Built: 1932,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 220 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 292 (year 2030),  Design Load: HS 20,  Features Intersected: NO NAME BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $348,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15023,  Location: 2 MI NORTH EAST ANDALUSIA (Lat: 31.331258,  Lng: -86.441814),  Route carried "on" structure: County highway 49,  Year Built: 1963,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 310 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 556 (year 2032),  Design Load: HS 20,  Features Intersected: FIVE RUNS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15633,  Location: 1 MI. N OF MT. PISGAH CH (Lat: 31.357656,  Lng: -86.419942),  Route carried "on" structure: County highway 57,  Year Built: 1992,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 220 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 380 (year 2032),  Design Load: HS 20,  Features Intersected: NO NAME BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $415,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $457,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15636,  Location: 1/2 MI. W OF ANDALUSIA (Lat: 31.308797,  Lng: -86.531458),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 11.52m (37.80ft),  Average Daily Traffic: 350 (year 1994),  Truck Traffic: 10%,  Average Future Daily Traffic: 585 (year 2030),  Design Load: HS 20,  Features Intersected: CONECUH RIVER,  Facility Carried by Structure: COUNTY DIRT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 12.39m (40.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,549,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $2,804,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15877,  Location: 0.7 MILES N CO.RD. 17 (Lat: 31.278097,  Lng: -86.484500),  Route carried "on" structure: US 29,  Year Built: 1962,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 4,150 (year 2013),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,656 (year 2033),  Design Load: HS 20,  Features Intersected: BAY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 870.398,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $424,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $466,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1588,  Location: 4 MI. NE OF ANDALUSIA (Lat: 31.322447,  Lng: -86.425378),  Route carried "on" structure: County highway 57,  Year Built: 1964,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 250 (year 1994),  Truck Traffic: 5%,  Average Future Daily Traffic: 366 (year 2032),  Design Load: H 15,  Features Intersected: NO NAME BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 78.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $335,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $369,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16563,  Location: 1MI N CO RD #42 (Lat: 31.307383,  Lng: -86.525514),  Route carried "on" structure: County highway 19,  Year Built: 1996,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 186 (year 1996),  Truck Traffic: 20%,  Average Future Daily Traffic: 236 (year 2035),  Design Load: HS 20,  Features Intersected: NO NAME BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $348,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17109,  Location: 6.4KM S OF ANDALUSIA (Lat: 31.255619,  Lng: -86.496606),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 186 (year 1996),  Truck Traffic: 2%,  Average Future Daily Traffic: 447 (year 2035),  Design Load: HS 20,  Features Intersected: BAY BRANCH,  Facility Carried by Structure: ANN RABREN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $579,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17165,  Location: 4KM SOUTH OF ANDALUSIA (Lat: 31.257061,  Lng: -86.497578),  Route carried "on" structure: County highway 17,  Year Built: 1960,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 730 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 974 (year 2032),  Features Intersected: NO NAME CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $270,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17227,  Location: 1 M W ANDALUSIA S OF 42 (Lat: 31.282858,  Lng: -86.529481),  Route carried "on" structure: County highway 19,  Year Built: 1999,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 220 (year 1994),  Truck Traffic: 6%,  Average Future Daily Traffic: 345 (year 2035),  Design Load: HS 20,  Features Intersected: COKER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $579,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17246,  Location: 1 MI. S.E. ANDALUSIA (Lat: 31.271447,  Lng: -86.430803),  Route carried "on" structure: County highway 45,  Year Built: 1999,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 540 (year 1994),  Truck Traffic: 7%,  Average Future Daily Traffic: 689 (year 2035),  Design Load: HS 20,  Features Intersected: TURKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.142,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17979,  Location: 5.2 MI. E. US 29 (Lat: 31.317125,  Lng: -86.419733),  Route carried "on" structure: US 84,  Year Built: 2004,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 4,150 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,567 (year 2033),  Design Load: HS 20,  Features Intersected: FIVE RUN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 220.356,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,143,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $2,357,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1798,  Location: 4.2 MI. E. JCT US 29 (Lat: 31.319731,  Lng: -86.435047),  Route carried "on" structure: US 84,  Year Built: 2005,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 4,615 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,191 (year 2033),  Design Load: HS 20,  Features Intersected: FIVE RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 218.826,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.86m (38.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,417,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $3,759,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17981,  Location: 4.2 MI E. JCT. US 29 (Lat: 31.319511,  Lng: -86.435086),  Route carried "on" structure: US 84,  Year Built: 2005,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 4,615 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,191 (year 2033),  Design Load: HS 20,  Features Intersected: FIVE RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 218.826,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.86m (38.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,417,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $3,759,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21666,  Location: 0.33 Mile N of 84 By Pass (Lat: 31.325972,  Lng: -86.489375),  Route carried "on" structure: City street 68,  Year Built: 1962,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,158 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,721 (year 2040),  Design Load: HS 20,  Features Intersected: Prestwood Creek,  Facility Carried by Structure: Pinewood Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $263,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21667,  Location: 0.36 miles E of US 29 (Lat: 31.339436,  Lng: -86.464894),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,464 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,175 (year 2042),  Design Load: HS 20,  Features Intersected: UT Five Runs Creek,  Facility Carried by Structure: Industrial Park Dr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels