Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Arab, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 135ft / 41.1mTotal length
  • $14,417,000Total costs
  • 43,613Total average daily traffic
  • 2,109Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Arab
  • No street view available for this location

New bridges in Arab, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21930-1939
  • 101950-1959
  • 41960-1969
  • 21980-1989
  • 41990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Arab, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Arab, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 12.5%Very good
  • 18.8%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 12.5%Very good
  • 31.3%Satisfactory
  • 37.5%Fair
  • 6.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 12.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 31.3%Fair
  • 6.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.4%Excellent
  • 14.8%Very good
  • 22.2%Good
  • 37.0%Satisfactory
  • 14.8%Fair
  • 3.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.3%Excellent
  • 8.3%Good
  • 75.0%Satisfactory
  • 8.3%Poor
Find on map >>   Show street view

Structure Number: 666,  Location: 0.3 MI N JCT CR 122 (Lat: 34.597872,  Lng: -85.908931),  Route carried "on" structure: County highway 51,  Year Built: 1929,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 180 (year 1989),  Truck Traffic: 2%,  Average Future Daily Traffic: 227 (year 2040),  Design Load: H 15,  Features Intersected: KIRBY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $401,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $441,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 112,  Location: 1.8 MI S JCT SR 69 (Lat: 34.290000,  Lng: -86.496667),  Route carried "on" structure: US 231,  Year Built: 1934,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 7,332 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,265 (year 2038),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 457.810,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $331,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $364,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1849,  Location: 2552 FT S JCT 1213 (Lat: 34.378683,  Lng: -86.489458),  Route carried "on" structure: County highway 211,  Year Built: 1969,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 1994),  Average Future Daily Traffic: 200 (year 2040),  Design Load: H 10,  Features Intersected: BRANCH,  Facility Carried by Structure: COUNTY HIGHWAY121
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $297,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 1993,  Location: 1 MI. W. OF CAMDEN (Lat: 32.014386,  Lng: -87.310431),  Route carried "on" structure: State highway 28,  Year Built: 1939,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,730 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,677 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 131.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $638,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2516,  Location: 0.5 MI NE AL 69 (Lat: 34.343333,  Lng: -86.453333),  Route carried "on" structure: City street ,  Year Built: 1927,  Year Reconstructed: 1941,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,670 (year 2041),  Design Load: H 15,  Features Intersected: SHOAL CREEK,  Facility Carried by Structure: GUNTERSVILLE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $825,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4158,  Location: 2495 FT S JCT 1418 (Lat: 34.360847,  Lng: -86.471928),  Route carried "on" structure: County highway 196,  Year Built: 1951,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 550 (year 2000),  Truck Traffic: 2%,  Average Future Daily Traffic: 650 (year 2042),  Design Load: H 10,  Features Intersected: BROCK BRANCH,  Facility Carried by Structure: COUNTY HIGHWAY119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 33.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4178,  Location: 2747 FT N JCT 1297A (Lat: 34.330978,  Lng: -86.529992),  Route carried "on" structure: County highway 297,  Year Built: 1968,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 750 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,000 (year 2040),  Design Load: H 10,  Features Intersected: GILLIAM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 82.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4188,  Location: 1683 FT E JCT 1024 (Lat: 34.357519,  Lng: -86.524092),  Route carried "on" structure: County highway 418,  Year Built: 1955,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,000 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: H 10,  Features Intersected: BRANCH,  Facility Carried by Structure: COUNTY HIGHWAY141
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $358,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4235,  Location: CR 1856 (Lat: 34.260822,  Lng: -86.481992),  Route carried "on" structure: County highway ,  Year Built: 1952,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 45 (year 1991),  Average Future Daily Traffic: 60 (year 2033),  Features Intersected: MULBERRY CREEK,  Facility Carried by Structure: Cr 1856
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $310,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $341,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4514,  Location: Cr 1823 (Lat: 34.249483,  Lng: -86.497314),  Route carried "on" structure: County highway ,  Year Built: 1953,  Status: Closed,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 55 (year 1991),  Average Future Daily Traffic: 60 (year 2033),  Features Intersected: TIBB CREEK,  Facility Carried by Structure: cr 1823
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2021,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $164,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 4742,  Location: CR 1859 (Lat: 34.265869,  Lng: -86.476883),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 70 (year 1991),  Average Future Daily Traffic: 80 (year 2033),  Features Intersected: MULBERRY CREEK,  Facility Carried by Structure: Cr 1859
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $253,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 666,  Location: JCT US 231 * SR 69 (Lat: 34.315100,  Lng: -86.502881),  Route carried "on" structure: State highway 69,  Year Built: 1959,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 9,726 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,616 (year 2038),  Design Load: HS 20,  Features Intersected: US 231 SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 430.292,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.75m (25.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,549,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $2,804,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 7976,  Location: CR 1843 (Lat: 34.295939,  Lng: -86.493289),  Route carried "on" structure: County highway 30,  Year Built: 1963,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 80 (year 1991),  Average Future Daily Traffic: 90 (year 2033),  Features Intersected: MAZE CREEK,  Facility Carried by Structure: CO. RT. 1843
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 68.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $299,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12439,  Location: 1.0 MI E CR 296 (Lat: 34.366600,  Lng: -86.593603),  Route carried "on" structure: County highway 418,  Year Built: 1980,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 225 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 449 (year 2042),  Design Load: H 10,  Features Intersected: COTACO CREEK,  Facility Carried by Structure: RUTH MTN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $265,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12441,  Location: STRAWBERRY (Lat: 34.249536,  Lng: -86.497250),  Route carried "on" structure: County highway 438,  Year Built: 1980,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 68 (year 2021),  Average Future Daily Traffic: 100 (year 2041),  Design Load: H 10,  Features Intersected: WARRIOR CREEK,  Facility Carried by Structure: WARRIOR CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 10.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 7.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $188,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 15927,  Location: 2 MI EAST ARAB CITY LIMIT (Lat: 34.361008,  Lng: -86.460331),  Route carried "on" structure: County highway 418,  Year Built: 1955,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 800 (year 1994),  Truck Traffic: 2%,  Average Future Daily Traffic: 960 (year 2040),  Design Load: H 15,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $339,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16053,  Location: 1M S CO RD 1211 (Lat: 34.374647,  Lng: -86.481178),  Route carried "on" structure: County highway 222,  Year Built: 1990,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 100 (year 1994),  Average Future Daily Traffic: 110 (year 2040),  Features Intersected: Peachtree Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $242,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $266,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 16055,  Location: 1M S 1124 (Lat: 34.382942,  Lng: -86.494781),  Route carried "on" structure: County highway 224,  Year Built: 1990,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 1994),  Average Future Daily Traffic: 110 (year 2040),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16066,  Location: 3M N HWY 69 (Lat: 34.365489,  Lng: -86.450919),  Route carried "on" structure: County highway 214,  Year Built: 1958,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 115 (year 2000),  Truck Traffic: 1%,  Average Future Daily Traffic: 140 (year 2040),  Design Load: H 10,  Features Intersected: BROCK BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $237,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Other,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1608,  Location: COTACO VALLEY (Lat: 34.393764,  Lng: -86.554839),  Route carried "on" structure: County highway 24,  Year Built: 1991,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 25 (year 1994),  Average Future Daily Traffic: 60 (year 2040),  Design Load: H 10,  Features Intersected: LITTLE COTACO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 8.8m (28.9ft),  Right: 8.8m (28.9ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $175,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 16479,  Location: 0.50MI S CO RD 1418 (Lat: 34.352461,  Lng: -86.528353),  Route carried "on" structure: County highway 24,  Year Built: 1968,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 150 (year 1996),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2040),  Design Load: H 10,  Features Intersected: PERKINS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 16633,  Location: 212FT N JCT 1418 (Lat: 34.361503,  Lng: -86.458881),  Route carried "on" structure: County highway 197,  Year Built: 1951,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 100 (year 1994),  Average Future Daily Traffic: 200 (year 2040),  Design Load: HS 20,  Features Intersected: BROCK BRANCH
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $244,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1733,  Location: 7.7 MI S OF BROWNS CREEK (Lat: 34.346003,  Lng: -86.459089),  Route carried "on" structure: State highway 69,  Year Built: 1999,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 8,653 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,114 (year 2040),  Design Load: HS 20,  Features Intersected: SHOALS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 436.454,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,061,000,  Roadway Improvement Cost: $206,000,  Total Project Cost: $2,267,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18003,  Location: 6311 FT S JCTN 1418 (Lat: 34.346606,  Lng: -86.550633),  Route carried "on" structure: County highway 23,  Year Built: 2000,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 150 (year 2000),  Average Future Daily Traffic: 190 (year 2040),  Design Load: HS 20,  Features Intersected: PERKINS CREEK
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 83.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $499,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 18655,  Location: 9101 FT S JCT 1418 (Lat: 34.341397,  Lng: -86.556536),  Route carried "on" structure: County highway 847,  Year Built: 2003,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 215 (year 2002),  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: MILL POND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.4m (73.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $640,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $704,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1993,  Location: 3.1 MI NW US 231 (Lat: 34.340000,  Lng: -86.538333),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Posted for load,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 335 (year 2021),  Average Future Daily Traffic: 469 (year 2041),  Design Load: HS 20,  Features Intersected: SPILLWAY OF PINE LAKE,  Facility Carried by Structure: PINE LAKE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 34.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $516,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21066,  Location: 3523' N Jct Co Rd 1214 (Lat: 34.375700,  Lng: -86.475897),  Route carried "on" structure: County highway 213,  Year Built: 2018,  Status: Open,  Structure Length: 1.63m (5.35ft),  Average Daily Traffic: 170 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 252 (year 2041),  Design Load: HS 20,  Features Intersected: Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $187,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $206,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2126,  Location: 1/2 MI W OF STRAWBERRY (Lat: 34.251944,  Lng: -86.502778),  Route carried "on" structure: County highway 57,  Year Built: 2016,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 42 (year 2020),  Average Future Daily Traffic: 63 (year 2040),  Features Intersected: WARRIOR CREEK,  Facility Carried by Structure: WALLACE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $356,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 666,  Location: JCT US 231 * SR 69 (Lat: 34.315100,  Lng: -86.502881),  Route carried "under" structure: US 231,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 8,747 (year 2018),  Truck Traffic: 3%,  Features Intersected: US 231 SR 53,  Facility Carried by Structure: SR 69
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 460.626,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 16.8m (55.1ft)

Discuss Arab, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.