Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Arcade, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 85ft / 25.9mTotal length
  • $16,268,000Total costs
  • 25,292Total average daily traffic
  • 2,661Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Arcade
  • No street view available for this location

New bridges in Arcade, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 11940-1949
  • 21970-1979
  • 21980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Arcade, NY
Average Bridge Truck Traffic in Arcade, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Very good
  • 44.4%Good
  • 11.1%Satisfactory
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 22.2%Very good
  • 22.2%Good
  • 22.2%Fair
  • 22.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 22.2%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 12.5%Good
  • 62.5%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 102456,  Location: 0.1M W OF JCT RTS 39 & 98 (Lat: 42.534361,  Lng: -78.422336),  Route carried "on" structure: State highway 98,  Year Built: 1990,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 6,372 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,411 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.459,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 3.3m (10.8ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $961,000,  Roadway Improvement Cost: $563,000,  Total Project Cost: $1,524,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103562,  Location: 0.1MI NE JCT RTS 98 + 39 (Lat: 42.535458,  Lng: -78.420297),  Route carried "on" structure: State highway 98,  Year Built: 1932,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 1,338 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,395 (year 2040),  Features Intersected: CATTARAUGUS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.542,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.8m (74.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $1,171,000,  Roadway Improvement Cost: $686,000,  Total Project Cost: $1,857,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103563,  Location: 2 MI NE JCT SH 98 & SH 39 (Lat: 42.554883,  Lng: -78.392308),  Route carried "on" structure: State highway 98,  Year Built: 2001,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 1,338 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,395 (year 2040),  Features Intersected: MONKEY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.776,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $952,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106891,  Location: 1.6MI W JCT RTS 39 + 98 (Lat: 42.531842,  Lng: -78.453319),  Route carried "on" structure: State highway 39,  Year Built: 1976,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 12,505 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,582 (year 2040),  Design Load: HS 20,  Features Intersected: STATION DRIVE, ARCADE &
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.98m (26.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,844,000,  Roadway Improvement Cost: $2,251,000,  Total Project Cost: $6,095,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 331943,  Location: AT VILLAGE OF ARCADE (Lat: 42.535342,  Lng: -78.424833),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 546 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 764 (year 2038),  Design Load: HS 20,  Features Intersected: CATTARAUGUS CREEK,  Facility Carried by Structure: CHURCH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.2m (36.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $878,000,  Roadway Improvement Cost: $514,000,  Total Project Cost: $1,391,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331944,  Location: AT VILLAGE ARCADE (Lat: 42.537569,  Lng: -78.432178),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 762 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,067 (year 2038),  Design Load: HL 93,  Features Intersected: CATTARAUGUS CREEK,  Facility Carried by Structure: WEST STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 87.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $934,000,  Roadway Improvement Cost: $547,000,  Total Project Cost: $1,482,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331945,  Location: .2 MI WEST OF ARCADE (Lat: 42.536833,  Lng: -78.457564),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 946 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,324 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CATTARAUGUS CREEK,  Facility Carried by Structure: HURDVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,023,000,  Roadway Improvement Cost: $599,000,  Total Project Cost: $1,622,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331947,  Location: 0.3 MI W ARCADE CENTER (Lat: 42.552281,  Lng: -78.394644),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 524 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 734 (year 2038),  Design Load: HS 20,  Features Intersected: CATTARAUGUS CREEK,  Facility Carried by Structure: GENESEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.632,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $628,000,  Roadway Improvement Cost: $368,000,  Total Project Cost: $995,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 331952,  Location: 5.0 MI NE OF ARCADE (Lat: 42.575994,  Lng: -78.390592),  Route carried "on" structure: Other road ,  Year Built: 1944,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 10 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 14 (year 2038),  Design Load: HS 20,  Features Intersected: TRIB MONKEY RUN,  Facility Carried by Structure: DUNN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $221,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $350,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 106891,  Location: 1.6MI W JCT RTS 39 + 98 (Lat: 42.531842,  Lng: -78.453319),  Route carried "under" structure: ServiceOther road ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 5 (year 2021),  Features Intersected: STATION DRIVE, ARCADE &,  Facility Carried by Structure: RTE 39
Minimum Vertical Clearance: 7.99m (26.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 770727,  Location: WEST BORDER VILL ARCADE (Lat: 42.537631,  Lng: -78.456625),  Route carried "under" structure: Other road ,  Year Built: 1915,  Structure Length: 0. m,  Average Daily Traffic: 946 (year 2020),  Truck Traffic: 5%,  Features Intersected: HURDVILLE ROAD,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.595,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 7.3m (24.0ft)

Discuss Arcade, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.