Bridge Statistics for Beacon, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 15Number of bridges
- 141ft / 42.5mTotal length
- $51,087,000Total costs
- 181,007Total average daily traffic
- 25,027Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Beacon
- No street view available for this location
- New bridges - historical statistics
- 21910-1919
- 11920-1929
- 11930-1939
- 81960-1969
- 11970-1979
- 21990-1999
- Reconstructed bridges - Historical Statistics
- 11950-1959
- 01960-1969
- 01970-1979
- 11980-1989
- 01990-1999
- 32000-2009
- 12010-2019
- Bridge Condition - Deck
- 10.0%Excellent
- 30.0%Good
- 50.0%Satisfactory
- 10.0%Fair
- Bridge Condition - Superstructure
- 18.2%Very good
- 45.5%Satisfactory
- 36.4%Fair
- Bridge Condition - Substructure
- 9.1%Very good
- 27.3%Good
- 27.3%Satisfactory
- 27.3%Fair
- 9.1%Serious
- Bridge Condition - Channel
- 25.0%Good
- 75.0%Satisfactory
Find on map >> Show street view
Structure Number: 100634, Location: JCT RTE 9D & FISHKILL CR (Lat: 41.497925, Lng: -73.966725), Route carried "on" structure: State highway 9D, Year Built: 1933, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 5,192 (year 2020), Truck Traffic: 4%, Average Future Daily Traffic: 6,307 (year 2040), Features Intersected: FISHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.951, Lanes on structure: 2, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.1m (98.8ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 14.1m (46.3ft)
Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 71.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 23.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.05m (13.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2021, Bridge Improvement Cost: $7,340,000, Roadway Improvement Cost: $4,299,000, Total Project Cost: $11,639,000 ( Estimate for 2021)
Structure Number: 100634, Location: JCT RTE 9D & FISHKILL CR (Lat: 41.497925, Lng: -73.966725), Route carried "on" structure: State highway 9D, Year Built: 1933, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 5,192 (year 2020), Truck Traffic: 4%, Average Future Daily Traffic: 6,307 (year 2040), Features Intersected: FISHKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.951, Lanes on structure: 2, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.1m (98.8ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 14.1m (46.3ft)
Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 71.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 23.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 4.05m (13.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2021, Bridge Improvement Cost: $7,340,000, Roadway Improvement Cost: $4,299,000, Total Project Cost: $11,639,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: 100635, Location: JCT RTS 9D & RR AT BEACON (Lat: 41.498172, Lng: -73.967364), Route carried "on" structure: State highway 9D, Year Built: 1998, Status: Open, Structure Length: 1.43m (4.69ft), Average Daily Traffic: 5,192 (year 2020), Truck Traffic: 4%, Average Future Daily Traffic: 6,307 (year 2040), Design Load: HS 25 or greater, Features Intersected: MNRR BE LINE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.031, Lanes on structure: 2, Base Highway Network: Yes, Owner: Railroad, Maintenance Responsibility: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.4m (44.0ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 14.2m (46.6ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.43m (4.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $1,372,000, Roadway Improvement Cost: $803,000, Total Project Cost: $2,175,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 100635, Location: JCT RTS 9D & RR AT BEACON (Lat: 41.498172, Lng: -73.967364), Route carried "on" structure: State highway 9D, Year Built: 1998, Status: Open, Structure Length: 1.43m (4.69ft), Average Daily Traffic: 5,192 (year 2020), Truck Traffic: 4%, Average Future Daily Traffic: 6,307 (year 2040), Design Load: HS 25 or greater, Features Intersected: MNRR BE LINE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.031, Lanes on structure: 2, Base Highway Network: Yes, Owner: Railroad, Maintenance Responsibility: City or Municipal Highway Agency, Approaching Roadway Width: 9.1m (29.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.4m (44.0ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 2.1m (6.9ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 14.2m (46.6ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.43m (4.69ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2020, Bridge Improvement Cost: $1,372,000, Roadway Improvement Cost: $803,000, Total Project Cost: $2,175,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 100636, Location: JCT SH 9D & I84 (Lat: 41.517844, Lng: -73.973689), Route carried "on" structure: State highway 9D, Year Built: 1964, Year Reconstructed: 1987, Status: Open, Structure Length: 5.58m (18.31ft), Average Daily Traffic: 19,221 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 19,311 (year 2040), Design Load: HS 20, Features Intersected: 84I 84I82021014, RTE I84
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 10.330, Lanes on structure: 5, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 19.2m (63.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 19.2m (63.0ft), Out-to-Out Width: 22.1m (72.5ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Serious, Operating Rating: 71.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.57m (18.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $4,754,000, Roadway Improvement Cost: $2,784,000, Total Project Cost: $7,538,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 100636, Location: JCT SH 9D & I84 (Lat: 41.517844, Lng: -73.973689), Route carried "on" structure: State highway 9D, Year Built: 1964, Year Reconstructed: 1987, Status: Open, Structure Length: 5.58m (18.31ft), Average Daily Traffic: 19,221 (year 2020), Truck Traffic: 3%, Average Future Daily Traffic: 19,311 (year 2040), Design Load: HS 20, Features Intersected: 84I 84I82021014, RTE I84
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 10.330, Lanes on structure: 5, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 19.2m (63.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 19.2m (63.0ft), Out-to-Out Width: 22.1m (72.5ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Serious, Operating Rating: 71.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.57m (18.27ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2021, Bridge Improvement Cost: $4,754,000, Roadway Improvement Cost: $2,784,000, Total Project Cost: $7,538,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 1026819, Location: .9 MI E JCT I84 & SH 9D (Lat: 41.524622, Lng: -73.959819), Route carried "on" structure: Interstate 84, Year Built: 1963, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 43,706 (year 2020), Truck Traffic: 18%, Average Future Daily Traffic: 74,011 (year 2040), Design Load: HS 20, Features Intersected: FIRST FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.411, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Skew: 21 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 23.3m (76.4ft), Out-to-Out Width: 44.6m (146.3ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Inventory Rating: 73.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2021, Bridge Improvement Cost: $2,563,000, Roadway Improvement Cost: $1,501,000, Total Project Cost: $4,065,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1026819, Location: .9 MI E JCT I84 & SH 9D (Lat: 41.524622, Lng: -73.959819), Route carried "on" structure: Interstate 84, Year Built: 1963, Status: Open, Structure Length: 0.79m (2.59ft), Average Daily Traffic: 43,706 (year 2020), Truck Traffic: 18%, Average Future Daily Traffic: 74,011 (year 2040), Design Load: HS 20, Features Intersected: FIRST FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.411, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 23.2m (76.1ft), Skew: 21 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.0m (23.0ft), Curb-To-Curb Width: 23.3m (76.4ft), Out-to-Out Width: 44.6m (146.3ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Good, Inventory Rating: 73.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.79m (2.59ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2021, Bridge Improvement Cost: $2,563,000, Roadway Improvement Cost: $1,501,000, Total Project Cost: $4,065,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 1026821, Location: AT CAMP BEACON CORR FACIL (Lat: 41.530122, Lng: -73.941892), Route carried "on" structure: Interstate 84, Year Built: 1964, Year Reconstructed: 2006, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 27,934 (year 2001), Truck Traffic: 15%, Design Load: HS 20+Mod, Features Intersected: CR36-RED SCHLHS R
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.052, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.05m (13.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $1,625,000, Roadway Improvement Cost: $952,000, Total Project Cost: $2,577,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1026821, Location: AT CAMP BEACON CORR FACIL (Lat: 41.530122, Lng: -73.941892), Route carried "on" structure: Interstate 84, Year Built: 1964, Year Reconstructed: 2006, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 27,934 (year 2001), Truck Traffic: 15%, Design Load: HS 20+Mod, Features Intersected: CR36-RED SCHLHS R
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.052, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.05m (13.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $1,625,000, Roadway Improvement Cost: $952,000, Total Project Cost: $2,577,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 1026822, Location: AT CAMP BEACON CORR FACIL (Lat: 41.529781, Lng: -73.941914), Route carried "on" structure: Interstate 84, Year Built: 1964, Year Reconstructed: 2006, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 21,853 (year 2020), Truck Traffic: 18%, Average Future Daily Traffic: 37,006 (year 2040), Design Load: HS 20+Mod, Features Intersected: CR36-RED SCHLHS R
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.068, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.05m (13.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $1,625,000, Roadway Improvement Cost: $952,000, Total Project Cost: $2,577,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 1026822, Location: AT CAMP BEACON CORR FACIL (Lat: 41.529781, Lng: -73.941914), Route carried "on" structure: Interstate 84, Year Built: 1964, Year Reconstructed: 2006, Status: Open, Structure Length: 4.05m (13.29ft), Average Daily Traffic: 21,853 (year 2020), Truck Traffic: 18%, Average Future Daily Traffic: 37,006 (year 2040), Design Load: HS 20+Mod, Features Intersected: CR36-RED SCHLHS R
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.068, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.4m (30.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 10.1m (33.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.05m (13.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2021, Bridge Improvement Cost: $1,625,000, Roadway Improvement Cost: $952,000, Total Project Cost: $2,577,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 226253, Location: IN THE CITY OF BEACON (Lat: 41.504058, Lng: -73.984600), Route carried "on" structure: City street , Year Built: 1991, Status: Open, Structure Length: 8.63m (28.31ft), Average Daily Traffic: 2,304 (year 2020), Average Future Daily Traffic: 2,850 (year 2040), Design Load: HS 20, Features Intersected: Parking Access Road, MNR, Facility Carried by Structure: BEEKMAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 36.8m (120.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.8m (35.4ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 8.62m (28.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $4,053,000, Roadway Improvement Cost: $2,373,000, Total Project Cost: $6,426,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 226253, Location: IN THE CITY OF BEACON (Lat: 41.504058, Lng: -73.984600), Route carried "on" structure: City street , Year Built: 1991, Status: Open, Structure Length: 8.63m (28.31ft), Average Daily Traffic: 2,304 (year 2020), Average Future Daily Traffic: 2,850 (year 2040), Design Load: HS 20, Features Intersected: Parking Access Road, MNR, Facility Carried by Structure: BEEKMAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 8.5m (27.9ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 36.8m (120.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.8m (35.4ft)
Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 70.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 37.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 8.62m (28.28ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2020, Bridge Improvement Cost: $4,053,000, Roadway Improvement Cost: $2,373,000, Total Project Cost: $6,426,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 226261, Location: IN THE CITY OF BEACON (Lat: 41.500686, Lng: -73.963514), Route carried "on" structure: City street , Year Built: 1979, Status: Open, Structure Length: 3.32m (10.89ft), Average Daily Traffic: 889 (year 2016), Truck Traffic: 2%, Average Future Daily Traffic: 1,245 (year 2036), Features Intersected: FISHKILL CREEK, Facility Carried by Structure: CHURCHILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.145, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.3m (102.7ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 0.0m, Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 68.7 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.32m (10.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2021, Bridge Improvement Cost: $2,158,000, Roadway Improvement Cost: $1,264,000, Total Project Cost: $3,422,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 226261, Location: IN THE CITY OF BEACON (Lat: 41.500686, Lng: -73.963514), Route carried "on" structure: City street , Year Built: 1979, Status: Open, Structure Length: 3.32m (10.89ft), Average Daily Traffic: 889 (year 2016), Truck Traffic: 2%, Average Future Daily Traffic: 1,245 (year 2036), Features Intersected: FISHKILL CREEK, Facility Carried by Structure: CHURCHILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.145, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 31.3m (102.7ft), Curb or Sidewalk Widths: Left: 1.7m (5.6ft), Right: 0.0m, Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 89.1 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 68.7 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.32m (10.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2021, Bridge Improvement Cost: $2,158,000, Roadway Improvement Cost: $1,264,000, Total Project Cost: $3,422,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 226262, Location: IN THE CITY OF BEACON (Lat: 41.502397, Lng: -73.962169), Route carried "on" structure: City street , Year Built: 1911, Year Reconstructed: 2011, Status: Open, Structure Length: 1.92m (6.30ft), Average Daily Traffic: 4,056 (year 2016), Truck Traffic: 2%, Average Future Daily Traffic: 5,678 (year 2036), Design Load: HS 20, Features Intersected: FISHKILL CREEK, Facility Carried by Structure: EAST MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.207, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.5m (60.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 11.6m (38.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 37.9 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 27.9 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.92m (6.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2020, Bridge Improvement Cost: $1,347,000, Roadway Improvement Cost: $789,000, Total Project Cost: $2,136,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 226262, Location: IN THE CITY OF BEACON (Lat: 41.502397, Lng: -73.962169), Route carried "on" structure: City street , Year Built: 1911, Year Reconstructed: 2011, Status: Open, Structure Length: 1.92m (6.30ft), Average Daily Traffic: 4,056 (year 2016), Truck Traffic: 2%, Average Future Daily Traffic: 5,678 (year 2036), Design Load: HS 20, Features Intersected: FISHKILL CREEK, Facility Carried by Structure: EAST MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.207, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.5m (60.7ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 11.6m (38.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Satisfactory, Operating Rating: 37.9 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 27.9 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.92m (6.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2020, Bridge Improvement Cost: $1,347,000, Roadway Improvement Cost: $789,000, Total Project Cost: $2,136,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 334313, Location: AT GLENHAM (Lat: 41.517228, Lng: -73.932922), Route carried "on" structure: Other road , Year Built: 1920, Year Reconstructed: 1959, Status: Open, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 4,739 (year 2018), Truck Traffic: 2%, Average Future Daily Traffic: 6,635 (year 2038), Features Intersected: FISHKILL CREEK, Facility Carried by Structure: WASHINGTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 6.2m (20.3ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.47m (11.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $1,578,000, Roadway Improvement Cost: $924,000, Total Project Cost: $2,502,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 334313, Location: AT GLENHAM (Lat: 41.517228, Lng: -73.932922), Route carried "on" structure: Other road , Year Built: 1920, Year Reconstructed: 1959, Status: Open, Structure Length: 3.47m (11.38ft), Average Daily Traffic: 4,739 (year 2018), Truck Traffic: 2%, Average Future Daily Traffic: 6,635 (year 2038), Features Intersected: FISHKILL CREEK, Facility Carried by Structure: WASHINGTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.016, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 6.2m (20.3ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Satisfactory, Operating Rating: 57.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.47m (11.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2021, Bridge Improvement Cost: $1,578,000, Roadway Improvement Cost: $924,000, Total Project Cost: $2,502,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 552401, Location: .9 MI S OF BEACON RR STA (Lat: 41.491317, Lng: -73.981650), Route carried "on" structure: State lands road , Year Built: 1915, Year Reconstructed: 2017, Status: Open, Structure Length: 5.24m (17.19ft), Average Daily Traffic: 634 (year 2020), Truck Traffic: 18%, Average Future Daily Traffic: 888 (year 2040), Features Intersected: MNRR HU LINE, Facility Carried by Structure: DENNING'S PT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.078, Lanes on structure: 1, Owner: State Agenciy, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 30.7m (100.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft), Curb-To-Curb Width: 3.9m (12.8ft), Out-to-Out Width: 6.9m (22.6ft)
Condition: Deck: Excellent, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 5.24m (17.19ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Bridge Improvement Cost: $3,803,000, Roadway Improvement Cost: $2,227,000, Total Project Cost: $6,030,000 ( Estimate for 2021), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Structure Number: 552401, Location: .9 MI S OF BEACON RR STA (Lat: 41.491317, Lng: -73.981650), Route carried "on" structure: State lands road , Year Built: 1915, Year Reconstructed: 2017, Status: Open, Structure Length: 5.24m (17.19ft), Average Daily Traffic: 634 (year 2020), Truck Traffic: 18%, Average Future Daily Traffic: 888 (year 2040), Features Intersected: MNRR HU LINE, Facility Carried by Structure: DENNING'S PT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.078, Lanes on structure: 1, Owner: State Agenciy, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 30.7m (100.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.2m (3.9ft), Curb-To-Curb Width: 3.9m (12.8ft), Out-to-Out Width: 6.9m (22.6ft)
Condition: Deck: Excellent, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 54.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 5.24m (17.19ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2021, Critical Feature Inspection Date: October 2021, Bridge Improvement Cost: $3,803,000, Roadway Improvement Cost: $2,227,000, Total Project Cost: $6,030,000 ( Estimate for 2021), Deck Structure Type: Wood or Timber, Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >> Show street view
Structure Number: 100636, Location: JCT SH 9D & I84 (Lat: 41.517844, Lng: -73.973689), Route carried "under" structure: Interstate 84, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 39,923 (year 2019), Truck Traffic: 19%, Features Intersected: 84I 84I82021014, RTE I84, Facility Carried by Structure: RTE 9D
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 1.641, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 100636, Location: JCT SH 9D & I84 (Lat: 41.517844, Lng: -73.973689), Route carried "under" structure: Interstate 84, Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 39,923 (year 2019), Truck Traffic: 19%, Features Intersected: 84I 84I82021014, RTE I84, Facility Carried by Structure: RTE 9D
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 1.641, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 1026819, Location: .9 MI E JCT I84 & SH 9D (Lat: 41.524622, Lng: -73.959819), Route carried "under" structure: State lands road , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 100 (year 2021), Features Intersected: FIRST FARM ROAD, Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.41m (14.47ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 7.0m (23.0ft)
Structure Number: 1026819, Location: .9 MI E JCT I84 & SH 9D (Lat: 41.524622, Lng: -73.959819), Route carried "under" structure: State lands road , Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 100 (year 2021), Features Intersected: FIRST FARM ROAD, Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.41m (14.47ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 7.0m (23.0ft)
Find on map >> Show street view
Structure Number: 1026821, Location: AT CAMP BEACON CORR FACIL (Lat: 41.530122, Lng: -73.941892), Route carried "under" structure: County highway , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 2,632 (year 2020), Truck Traffic: 3%, Features Intersected: CR36-RED SCHLHS R, Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 1.142, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.0m (45.9ft)
Structure Number: 1026821, Location: AT CAMP BEACON CORR FACIL (Lat: 41.530122, Lng: -73.941892), Route carried "under" structure: County highway , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 2,632 (year 2020), Truck Traffic: 3%, Features Intersected: CR36-RED SCHLHS R, Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 1.142, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.0m (45.9ft)
Find on map >> Show street view
Structure Number: 1026822, Location: AT CAMP BEACON CORR FACIL (Lat: 41.529781, Lng: -73.941914), Route carried "under" structure: County highway , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 2,632 (year 2020), Truck Traffic: 3%, Features Intersected: CR36-RED SCHLHS R, Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.129, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.0m (45.9ft)
Structure Number: 1026822, Location: AT CAMP BEACON CORR FACIL (Lat: 41.529781, Lng: -73.941914), Route carried "under" structure: County highway , Year Built: 1964, Structure Length: 0. m, Average Daily Traffic: 2,632 (year 2020), Truck Traffic: 3%, Features Intersected: CR36-RED SCHLHS R, Facility Carried by Structure: RTE I84
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.129, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 14.0m (45.9ft)