Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Belvidere, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 135ft / 40.9mTotal length
  • $4,392,000Total costs
  • 41,904Total average daily traffic
  • 1,202Total average daily truck traffic
  • 49,971Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Belvidere
  • No street view available for this location

New bridges in Belvidere, NJ - historical statistics
  • New bridges - historical statistics
  • 31900-1909
  • 21910-1919
  • 41920-1929
  • 11960-1969
  • 11970-1979
  • 11990-1999
  • 12010-2019
Reconstructed bridges in Belvidere, NJ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 01990-1999
  • 32000-2009
Average Bridge Daily Traffic in Belvidere, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 25.0%Good
  • 41.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 58.3%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 20.0%Very good
  • 40.0%Good
  • 30.0%Fair
Find on map >>   Show street view

Structure Number: 2100301,  Location: 1.6 MI NOFCR519 JUNCTION (Lat: 40.829250,  Lng: -75.078500),  Route carried "on" structure: County highway 620,  Year Built: 1907,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 4,759 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,807 (year 2041),  Design Load: HS 20,  Features Intersected: PEQUEST RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.543,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 2100302,  Location: 200' S. CR 620 Junc. (Lat: 40.829331,  Lng: -75.075789),  Route carried "on" structure: City street ,  Year Built: 1912,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 5,311 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,602 (year 2041),  Features Intersected: PEQUEST RIVER,  Facility Carried by Structure: PROSPECT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $83,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $171,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 2100303,  Location: 0.12 Mi. West of CR620 (Lat: 40.822281,  Lng: -75.080650),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 63 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 77 (year 2041),  Features Intersected: POPHANDUSING CREEK,  Facility Carried by Structure: SPRING STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 2100304,  Location: 0.1 MI SOUTH OF 6TH ST. (Lat: 40.820419,  Lng: -75.076200),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 33 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 39 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: POPHANDUSING CREEK,  Facility Carried by Structure: MANSFIELD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2100306,  Location: 50FT S. OF CR 620 JCT (Lat: 40.833831,  Lng: -75.060419),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,602 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,954 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: PEQUEST RIVER,  Facility Carried by Structure: ORCHARD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2102302,  Location: AT INT. OF US 46 (Lat: 40.841731,  Lng: -75.049061),  Route carried "on" structure: County highway 618,  Year Built: 1913,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 638 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 778 (year 2041),  Design Load: H 20,  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 2102309,  Location: .1 MI N OF CR 626 JUNTION (Lat: 40.794650,  Lng: -75.083561),  Route carried "on" structure: County highway 519,  Year Built: 1993,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 9,596 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,709 (year 2041),  Design Load: HS 20,  Features Intersected: BUCKHORN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.624,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Channel: Fair,  Culverts: Good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 2107154,  Location: 2.74 MI. WEST of NJ31 (Lat: 40.841731,  Lng: -75.049611),  Route carried "on" structure: US 46,  Year Built: 2011,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 4,885 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,360 (year 2041),  Design Load: HL 93,  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.732,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 66.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2107155,  Location: 2.74 MI. WEST of NJ31 (Lat: 40.841650,  Lng: -75.049889),  Route carried "on" structure: US 46,  Year Built: 1967,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 4,885 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,360 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BEAVER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.716,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $187,000,  Total Project Cost: $215,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 215016,  Location: 0.98 mi North of CR 519 (Lat: 40.821194,  Lng: -75.079111),  Route carried "on" structure: County highway 620,  Year Built: 1928,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 4,710 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,750 (year 2040),  Features Intersected: HUDSON SEC (ABAN)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $960,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $1,654,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 215216,  Location: 1.6 mi South of CR 620 (Lat: 40.805811,  Lng: -75.099181),  Route carried "on" structure: Other road ,  Year Built: 1926,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 325 (year 2040),  Features Intersected: HUDSON SECONDARY (NS),  Facility Carried by Structure: FOUL RIFT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $491,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,089,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 2152161,  Location: 1.9MI NW CR519&CR623 JCT (Lat: 40.833611,  Lng: -75.078500),  Route carried "on" structure: City street ,  Year Built: 1926,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 172 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 210 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BEL-DEL INDUSTRIAL(NS),  Facility Carried by Structure: MARKET STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,263,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330032,  Location: BELVIDERE NJ (Lat: 40.828850,  Lng: -75.084561),  Route carried "on" structure: State highway 1004,  Year Built: 1904,  Year Reconstructed: 2007,  Status: Posted for load,  Structure Length: 19.87m (65.19ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,000 (year 2040),  Features Intersected: DELAWARE River,  Facility Carried by Structure: CR620S
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Local Toll Authority,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 51.8m (169.9ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 18.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 20.51m (67.29ft),  Designated Inspection Frequency: Every 23 months,  Critical Feature Inspection Frequency: Every 23 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 11 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Underwater Inspection Date: August 2016,  Other Special Inspection Date: April 2021,  Deck Structure Type: Open Grating
Discuss Belvidere, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.