Bridge Statistics for Bennington, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 125ft / 37.9mTotal length
  • $23,211,000Total costs
  • 41,962Total average daily traffic
  • 1,901Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bennington
  • No street view available for this location

New bridges in Bennington, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 81950-1959
  • 31960-1969
  • 11970-1979
  • 11990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Bennington, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Bennington, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Very good
  • 36.4%Good
  • 36.4%Satisfactory
  • 9.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Very good
  • 27.3%Good
  • 27.3%Satisfactory
  • 9.1%Fair
  • 18.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 9.1%Very good
  • 18.2%Good
  • 45.5%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 28.6%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Excellent
  • 60.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 103003,  Location: 1.5MI N JCT RTS 77 + 20A (Lat: 42.791989,  Lng: -78.396700),  Route carried "on" structure: State highway 77,  Year Built: 1953,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 2,091 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,181 (year 2040),  Design Load: HS 20,  Features Intersected: CAYUGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.929,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $865,000,  Roadway Improvement Cost: $507,000,  Total Project Cost: $1,372,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103004,  Location: 0.1MI S JCT RTS 77 + 354 (Lat: 42.835483,  Lng: -78.397967),  Route carried "on" structure: State highway 77,  Year Built: 1953,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,091 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,181 (year 2040),  Design Load: H 20,  Features Intersected: RIGHT BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.788,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $473,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $749,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103005,  Location: JCT RTS 77 + 354 (Lat: 42.837031,  Lng: -78.398331),  Route carried "on" structure: State highway 354,  Year Built: 1952,  Status: Posted for load,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 2,999 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,128 (year 2040),  Design Load: H 20,  Features Intersected: RTE 77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.643,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,114,000,  Roadway Improvement Cost: $652,000,  Total Project Cost: $1,766,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104652,  Location: 3.1MI W JCT RTS 354 + 77 (Lat: 42.839358,  Lng: -78.458631),  Route carried "on" structure: State highway 354,  Year Built: 1958,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,595 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,707 (year 2040),  Design Load: H 20,  Features Intersected: RED BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $354,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $561,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 104653,  Location: 0.6MI E JCT RTS 354 + 77 (Lat: 42.835875,  Lng: -78.388589),  Route carried "on" structure: State highway 354,  Year Built: 1958,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,645 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,759 (year 2040),  Design Load: H 20,  Features Intersected: FRENCH BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.447,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $704,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 109565,  Location: 1.4MI E JCT RTS 354 + 77 (Lat: 42.836022,  Lng: -78.371833),  Route carried "on" structure: State highway 354,  Year Built: 1958,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,645 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,759 (year 2040),  Design Load: H 20,  Features Intersected: FENTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.815,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $354,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 22434,  Location: AT BOROUGH PARK (Lat: 40.626731,  Lng: -73.979903),  Route carried "on" structure: City street ,  Year Built: 1927,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 2,760 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,352 (year 2040),  Features Intersected: N Y & ATLANTIC/LI,  Facility Carried by Structure: 50TH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.216,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 3.4m (11.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 17.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $4,367,000,  Roadway Improvement Cost: $2,558,000,  Total Project Cost: $6,925,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 331957,  Location: 2.2 MI N VARYSBURG (Lat: 42.793425,  Lng: -78.318486),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 28 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 39 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: TONAWANDA CREEK,  Facility Carried by Structure: ECK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 71.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $691,000,  Roadway Improvement Cost: $405,000,  Total Project Cost: $1,096,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 331959,  Location: 3.2 MI S OF BENNINGTON (Lat: 42.799603,  Lng: -78.405786),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 28 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 39 (year 2036),  Design Load: HL 93,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: TOOLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $305,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $483,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33196,  Location: 1.6 MI SE FOLSOMDALE (Lat: 42.813486,  Lng: -78.423014),  Route carried "on" structure: Other road ,  Year Built: 1962,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 145 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 203 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: BURROUGH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.942,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $347,000,  Total Project Cost: $940,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 331961,  Location: .6 MI SE OF FOLSOMDALE (Lat: 42.818528,  Lng: -78.445664),  Route carried "on" structure: Other road ,  Year Built: 1933,  Year Reconstructed: 2000,  Status: Posted for load,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 70 (year 2036),  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: SCHOELLKOPF ROAD
Minimum Vertical Clearance: 3.00m (9.84ft),  Kilometerpoint: 1.078,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.1m (98.8ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Good,  Channel: Very good,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $1,286,000,  Roadway Improvement Cost: $753,000,  Total Project Cost: $2,040,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 331962,  Location: .1 MI SW OF FOLSOMDALE (Lat: 42.826217,  Lng: -78.449686),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 627 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 878 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: FOLSOMDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.030,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 82.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $534,000,  Total Project Cost: $1,447,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 331963,  Location: 1.8 MI SE OF COWLESVILLE (Lat: 42.836325,  Lng: -78.457406),  Route carried "on" structure: Other road ,  Year Built: 1966,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 38 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 53 (year 2036),  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: REILEIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 81.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $519,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $824,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331964,  Location: .2 MI S OF COWLESVILLE (Lat: 42.841006,  Lng: -78.470067),  Route carried "on" structure: Other road ,  Year Built: 1975,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 171 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 239 (year 2036),  Design Load: HS 20,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: URF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.011,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,065,000,  Roadway Improvement Cost: $624,000,  Total Project Cost: $1,688,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 331965,  Location: 0.2 MI SW OF COWLESVILLE (Lat: 42.842856,  Lng: -78.472278),  Route carried "on" structure: County highway ,  Year Built: 1968,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 1,525 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,135 (year 2040),  Design Load: HS 20,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: COUNTY ROAD 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.53m (11.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,085,000,  Roadway Improvement Cost: $635,000,  Total Project Cost: $1,721,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 331966,  Location: 1.0 MI NE FOLSOMOALE (Lat: 42.839125,  Lng: -78.439025),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 96 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 134 (year 2037),  Design Load: HL 93,  Features Intersected: RED BROOK,  Facility Carried by Structure: SCHAD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $541,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103005,  Location: JCT RTS 77 + 354 (Lat: 42.837031,  Lng: -78.398331),  Route carried "under" structure: State highway 77,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 3,028 (year 2000),  Features Intersected: RTE 77,  Facility Carried by Structure: RTE 354
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 21.400,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 22294,  Location: 5.3 MI NE ROUTE 9A+79 ST (Lat: 40.852467,  Lng: -73.941481),  Route carried "under" structure: City street 907V,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 18,400 (year 1977),  Features Intersected: RTE 907V,  Facility Carried by Structure: PEDESTRIAN
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 20.257,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 19.8m (65.0ft)

Discuss Bennington, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.