Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Berrien Springs, Michigan (MI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 407ft / 124mTotal length
  • 147,951Total average daily traffic
  • 17,644Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Berrien Springs
  • No street view available for this location

New bridges in Berrien Springs, MI - historical statistics
  • New bridges - historical statistics
  • 141990-1999
  • 12000-2009
Average Bridge Daily Traffic in Berrien Springs, MI
Average Bridge Truck Traffic in Berrien Springs, MI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 71.4%Good
  • 28.6%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Good
  • 14.3%Satisfactory
  • 71.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 85.7%Good
  • 14.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Good
  • 16.7%Satisfactory
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 874,  Location: IN BERRIEN SPRINGS (Lat: 41.949292,  Lng: -86.334164),  Route carried "on" structure: Business State highway 139,  Year Built: 1994,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 11,806 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 22,430 (year 2018),  Design Load: HS 25 or greater,  Features Intersected: ST JOSEPH RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 15.198,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 136,  Subroute: 9),  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 0.3m (1.0ft), Horizontal Clearance: 7.4m (24.3ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.4m (99.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $141,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 892,  Location: 5.5 MI SW OF BERRIEN SPRG (Lat: 41.923406,  Lng: -86.356031),  Route carried "on" structure: US 31,  Year Built: 1990,  Status: Open,  Structure Length: 26.29m (86.25ft),  Average Daily Traffic: 7,859 (year 2007),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,198 (year 2018),  Design Load: HS 25 or greater,  Features Intersected: ST JOSEPH RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 19.961,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 177,  Subroute: 5),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 81.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 893,  Location: 1.5 MI N OF SNOW ROAD (Lat: 41.950256,  Lng: -86.375011),  Route carried "on" structure: US 31,  Year Built: 1990,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 11,984 (year 2007),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,828 (year 2018),  Design Load: HS 25 or greater,  Features Intersected: LEMON CREEK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 23.431,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: 177,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Out-to-Out Width: 82.9m (272.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 67.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 12697,  Location: 7.9 MI N OF US-12 (Lat: 41.910397,  Lng: -86.339839),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 2,200 (year 1997),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,200 (year 2015),  Design Load: HS 20,  Features Intersected: US-31,  Facility Carried by Structure: RANGE LINE ROAD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 7.704,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 49.9m (163.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12698,  Location: 2.0 MI NW BERRIEN SPRINGS (Lat: 41.963447,  Lng: -86.374422),  Route carried "on" structure: State highway 139,  Year Built: 1997,  Status: Open,  Structure Length: 12.29m (40.32ft),  Average Daily Traffic: 10,910 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,925 (year 2018),  Design Load: HS 25 or greater,  Features Intersected: US-31
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 4.345,  Lanes on structure: 6,  Lanes under structure: 5,  Base Highway Network: Yes (Inventory Route: 311,  Subroute: 92),  Owner: State Highway Agency,  Approaching Roadway Width: 29.2m (95.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 29.2m (95.8ft),  Out-to-Out Width: 30.3m (99.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 69.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12752,  Location: 1.5 MI N OF OLD US-31 (Lat: 41.986333,  Lng: -86.370539),  Route carried "on" structure: US 31,  Year Built: 1998,  Status: Open,  Structure Length: 27.56m (90.42ft),  Average Daily Traffic: 5,465 (year 2007),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,802 (year 2018),  Design Load: HS 25 or greater,  Features Intersected: ST JOSEPH RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 27.484,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 177,  Subroute: 3),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.0m (13.1ft), Horizontal Clearance: 34.7m (113.8ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 36.1m (118.4ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12753,  Location: 1.5 MI N OF OLD US-31 (Lat: 41.986453,  Lng: -86.371053),  Route carried "on" structure: US 31,  Year Built: 1999,  Status: Open,  Structure Length: 24.97m (81.92ft),  Average Daily Traffic: 5,465 (year 2007),  Truck Traffic: 16%,  Average Future Daily Traffic: 5,802 (year 2018),  Design Load: HS 25 or greater,  Features Intersected: ST JOSEPH RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 27.452,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 177,  Subroute: 5),  Owner: State Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 36.9m (121.1ft), Horizontal Clearance: 34.7m (113.8ft)),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 36.1m (118.4ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2017,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12826,  Location: 2.6 MI N OF OLD US-31 (Lat: 42.000108,  Lng: -86.364622),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 9.68m (31.76ft),  Average Daily Traffic: 6,070 (year 1999),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,000 (year 2015),  Design Load: HS 20,  Features Intersected: US-31,  Facility Carried by Structure: TABOR ROAD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.895,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 138,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.4m (119.4ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 13484,  Location: 0.5 NE OF OLD US-31 (Lat: 41.951556,  Lng: -86.317167),  Route carried "on" structure: County highway ,  Year Built: 2009,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,140 (year 2010),  Average Future Daily Traffic: 4,554 (year 2025),  Features Intersected: LOVE CREEK,  Facility Carried by Structure: DEANS HILL ROAD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.012,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 903,  Location: 5.3 MI SW OF BERRIEN SPRG (Lat: 41.920672,  Lng: -86.353008),  Route carried "under" structure: US 31,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 15,718 (year 2007),  Truck Traffic: 12%,  Features Intersected: US-31,  Facility Carried by Structure: LAKE CHAPIN ROAD
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 19.641,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.3m (165.0ft)

Find on map >>   Show street view

Structure Number: 904,  Location: 4.6 MI SW OF BERRIEN SPRG (Lat: 41.930178,  Lng: -86.361283),  Route carried "under" structure: US 31,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 15,718 (year 2007),  Truck Traffic: 15%,  Features Intersected: US-31,  Facility Carried by Structure: SNOW ROAD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 20.901,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.4m (171.9ft)

Find on map >>   Show street view

Structure Number: 906,  Location: 1.5 MI W BERRIEN SPRINGS (Lat: 41.943311,  Lng: -86.372300),  Route carried "under" structure: US 31,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 11,984 (year 2007),  Truck Traffic: 15%,  Features Intersected: US-31,  Facility Carried by Structure: SHAWNEE ROAD
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 22.623,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 12697,  Location: 7.9 MI N OF US-12 (Lat: 41.910397,  Lng: -86.339839),  Route carried "under" structure: US 31,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 15,718 (year 2007),  Truck Traffic: 12%,  Features Intersected: US-31,  Facility Carried by Structure: RANGE LINE ROAD
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 18.030,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.9m (163.7ft)

Find on map >>   Show street view

Structure Number: 12698,  Location: 2.0 MI NW BERRIEN SPRINGS (Lat: 41.963447,  Lng: -86.374422),  Route carried "under" structure: US 31,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 11,984 (year 2007),  Truck Traffic: 16%,  Features Intersected: US-31,  Facility Carried by Structure: M-139
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 24.904,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 12826,  Location: 2.6 MI N OF OLD US-31 (Lat: 42.000108,  Lng: -86.364622),  Route carried "under" structure: US 31,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 10,930 (year 2007),  Truck Traffic: 17%,  Features Intersected: US-31,  Facility Carried by Structure: TABOR ROAD
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 29.098,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.4m (119.4ft)

Discuss Berrien Springs, Michigan (MI) on our hugely popular Michigan forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.