Bridge Statistics for Blooming Grove, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 184ft / 56.0mTotal length
  • $55,636,000Total costs
  • 221,993Total average daily traffic
  • 4,201Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Blooming Grove
  • No street view available for this location

New bridges in Blooming Grove, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11930-1939
  • 11940-1949
  • 71950-1959
  • 41960-1969
  • 51970-1979
  • 31980-1989
  • 11990-1999
  • 42000-2009
Reconstructed bridges in Blooming Grove, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Blooming Grove, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.5%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 45.5%Fair
  • 4.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.5%Very good
  • 45.5%Good
  • 31.8%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 31.8%Good
  • 36.4%Satisfactory
  • 22.7%Fair
  • 4.5%Poor
  • 4.5%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 31.6%Good
  • 36.8%Satisfactory
  • 26.3%Fair
  • 5.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 100325,  Location: AT SH 17/US 6 EXIT 128 (Lat: 41.346889,  Lng: -74.224767),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 1,381 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,708 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 17 17 83101202 WB, RTE,  Facility Carried by Structure: OXFORD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.22m (23.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,097,000,  Roadway Improvement Cost: $2,399,000,  Total Project Cost: $6,496,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 100326,  Location: BLOOMING GROVE (Lat: 41.345936,  Lng: -74.212544),  Route carried "on" structure: US 6,  Year Built: 1956,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 52,825 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 74,520 (year 2040),  Design Load: HS 20,  Features Intersected: HERITAGE TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.362,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 33.6m (110.2ft),  Out-to-Out Width: 34.5m (113.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,404,000,  Roadway Improvement Cost: $4,336,000,  Total Project Cost: $11,740,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100327,  Location: 0.6 MI W RTE 17 INT 130 (Lat: 41.347528,  Lng: -74.200244),  Route carried "on" structure: County highway ,  Year Built: 1956,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 6.49m (21.29ft),  Average Daily Traffic: 4,029 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,641 (year 2040),  Design Load: HS 20,  Features Intersected: 17 17 83101215 WB, RTE,  Facility Carried by Structure: MUSEUM VILLAGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.818,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,066,000,  Roadway Improvement Cost: $1,795,000,  Total Project Cost: $4,861,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100328,  Location: BETWEEN EX 129-130 - US6 (Lat: 41.346264,  Lng: -74.194164),  Route carried "on" structure: US 17,  Year Built: 1956,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 52,825 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 74,520 (year 2040),  Design Load: HS 20,  Features Intersected: ORANGE-ROCKLAND LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.955,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 33.9m (111.2ft),  Out-to-Out Width: 34.5m (113.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,794,000,  Roadway Improvement Cost: $2,221,000,  Total Project Cost: $6,015,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103484,  Location: 2.9 MI E JCT SH94 & SH17M (Lat: 41.378331,  Lng: -74.240508),  Route carried "on" structure: State highway 94,  Year Built: 1978,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 4,827 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,863 (year 2040),  Design Load: HS 20,  Features Intersected: MIDDLETOWN & NJ R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.158,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft)

Condition: Culverts: Good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $466,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103485,  Location: 3.5 MI E JCT RTS 94 & 17M (Lat: 41.384608,  Lng: -74.232475),  Route carried "on" structure: State highway 94,  Year Built: 1992,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 4,827 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,863 (year 2040),  Design Load: HS 20,  Features Intersected: CROMLINE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.123,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,195,000,  Roadway Improvement Cost: $700,000,  Total Project Cost: $1,895,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103488,  Location: 0.8 MI W JCT RTS 94+208 (Lat: 41.419550,  Lng: -74.175111),  Route carried "on" structure: State highway 94,  Year Built: 1976,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 4,827 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,863 (year 2040),  Design Load: HS 20,  Features Intersected: MOODNA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.478,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $963,000,  Roadway Improvement Cost: $564,000,  Total Project Cost: $1,527,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103489,  Location: 2.2 MI E JCT SH94 & SH208 (Lat: 41.431436,  Lng: -74.126608),  Route carried "on" structure: State highway 94,  Year Built: 1936,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 6,857 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,889 (year 2040),  Design Load: HS 20,  Features Intersected: TRIBUTARY TO MOODNA CRE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.241,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $566,000,  Roadway Improvement Cost: $332,000,  Total Project Cost: $898,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222307,  Location: 1.1 MI SE WASHINGTONVILLE (Lat: 41.412278,  Lng: -74.160297),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 277 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 388 (year 2037),  Features Intersected: PERRY CREEK,  Facility Carried by Structure: PERRY CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $347,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $550,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 222308,  Location: 0.9MI SE WASHINGTONVILLE (Lat: 41.415061,  Lng: -74.160469),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 853 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,194 (year 2037),  Features Intersected: PERRY CREEK,  Facility Carried by Structure: WOODCOCK MOUNTAIN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $201,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $319,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222309,  Location: .5 MI W JCT US 6 & SH 208 (Lat: 41.346733,  Lng: -74.200361),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 4,029 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,641 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HERITAGE RAIL TRAIL,  Facility Carried by Structure: MUSEUM VILLAGE ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.655,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 92.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $688,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $1,091,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334412,  Location: 3.6 MI NE OF CHESTER (Lat: 41.384572,  Lng: -74.229208),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 128 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 179 (year 2040),  Features Intersected: CROMLINE CREEK,  Facility Carried by Structure: HUBSHOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $909,000,  Roadway Improvement Cost: $533,000,  Total Project Cost: $1,442,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334413,  Location: 2.5 MI SW WASHINGTON VILL (Lat: 41.415944,  Lng: -74.212444),  Route carried "on" structure: Other road ,  Year Built: 1947,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 144 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 202 (year 2036),  Design Load: HS 20,  Features Intersected: CROMLINE CREEK,  Facility Carried by Structure: CHERRY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $259,000,  Total Project Cost: $701,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334414,  Location: 1.8 MI E WASHINGTONVILLE (Lat: 41.430347,  Lng: -74.119356),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 3,863 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,779 (year 2040),  Design Load: HS 20,  Features Intersected: MOODNA CREEK,  Facility Carried by Structure: COUNTY ROAD 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.093,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,884,000,  Roadway Improvement Cost: $1,103,000,  Total Project Cost: $2,987,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334416,  Location: 2.8 MI SW BLOOMING GROVE (Lat: 41.384353,  Lng: -74.237092),  Route carried "on" structure: County highway ,  Year Built: 1952,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 985 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,218 (year 2040),  Design Load: HS 20,  Features Intersected: CROMLINE CREEK,  Facility Carried by Structure: CRAIGVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.466,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $926,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334417,  Location: 2.3 MI SW WASHINGTONVILLE (Lat: 41.397825,  Lng: -74.186078),  Route carried "on" structure: Other road ,  Year Built: 1955,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,159 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,434 (year 2040),  Design Load: H 20,  Features Intersected: SATTERLY CREEK,  Facility Carried by Structure: ROUND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Critical,  Channel: Poor,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $916,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334418,  Location: 2.6 MI SW OF BLOOMING GRV (Lat: 41.390664,  Lng: -74.238344),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,056 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,306 (year 2040),  Design Load: HS 20,  Features Intersected: CROMLINE CREEK,  Facility Carried by Structure: HULSETOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,836,000,  Roadway Improvement Cost: $1,075,000,  Total Project Cost: $2,911,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334419,  Location: 2.2 MI W WASHINGTONVILLE (Lat: 41.430667,  Lng: -74.201267),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 1,436 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,776 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CROMLINE CREEK,  Facility Carried by Structure: TUTHILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.864,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $732,000,  Roadway Improvement Cost: $428,000,  Total Project Cost: $1,160,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33442,  Location: 2.0 MI SW BLOOMING GROVE (Lat: 41.399172,  Lng: -74.230897),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 396 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 554 (year 2040),  Design Load: H 20,  Features Intersected: TOMAHAWK LAKE,  Facility Carried by Structure: FARMINGDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.170,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,453,000,  Roadway Improvement Cost: $851,000,  Total Project Cost: $2,304,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334421,  Location: 0.8 MI S WASHINGTONVILLE (Lat: 41.416867,  Lng: -74.171133),  Route carried "on" structure: Other road ,  Year Built: 1964,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 826 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,156 (year 2040),  Features Intersected: SATTERLY CREEK,  Facility Carried by Structure: HUDSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $951,000,  Roadway Improvement Cost: $557,000,  Total Project Cost: $1,508,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334422,  Location: 2.2 MI.SW.WASHINGTONVILLE (Lat: 41.398567,  Lng: -74.148981),  Route carried "on" structure: Other road ,  Year Built: 1967,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 577 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 808 (year 2037),  Design Load: HS 20,  Features Intersected: PERRY CREEK,  Facility Carried by Structure: MOUNTAIN LODGE ROA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $761,000,  Roadway Improvement Cost: $446,000,  Total Project Cost: $1,206,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336013,  Location: 1.5 MI SE WASHINGTONVILLE (Lat: 41.407931,  Lng: -74.154694),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 144 (year 2020),  Average Future Daily Traffic: 202 (year 2040),  Design Load: HS 20,  Features Intersected: PERRY CREEK,  Facility Carried by Structure: FELTER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.657,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $904,000,  Roadway Improvement Cost: $530,000,  Total Project Cost: $1,434,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336021,  Location: 3.3 MI S OF WASHINGTONVIL (Lat: 41.380564,  Lng: -74.173264),  Route carried "on" structure: Alternate County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 4,276 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,290 (year 2040),  Design Load: H 20,  Features Intersected: TRIBUTARY To SATTERY CRE,  Facility Carried by Structure: CLOVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $221,000,  Total Project Cost: $597,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336482,  Location: 2 MI SW OF WASHINGTONVLLE (Lat: 41.406992,  Lng: -74.188786),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 580 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 812 (year 2040),  Design Load: HS 20,  Features Intersected: SATTERLY CREEK,  Facility Carried by Structure: HORTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,064,000,  Roadway Improvement Cost: $623,000,  Total Project Cost: $1,686,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100325,  Location: AT SH 17/US 6 EXIT 128 (Lat: 41.346889,  Lng: -74.224767),  Route carried "under" structure: US 17,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 43,285 (year 1996),  Features Intersected: 17 17 83101202 WB, RTE,  Facility Carried by Structure: OXFORD ROAD
Minimum Vertical Clearance: 6.53m (21.42ft),  Kilometerpoint: 45.873,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.0m (114.8ft)

Find on map >>   Show street view

Structure Number: 100327,  Location: 0.6 MI W RTE 17 INT 130 (Lat: 41.347528,  Lng: -74.200244),  Route carried "under" structure: State highway 17,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 24,200 (year 1971),  Features Intersected: 17 17 83101215 WB, RTE,  Facility Carried by Structure: MUSEUM VILLAGE RD
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 47.980,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 771225,  Location: 2.5 MI NW OF MONROE (Lat: 41.350872,  Lng: -74.215731),  Route carried "under" structure: Other road ,  Year Built: 1885,  Structure Length: 0. m,  Average Daily Traffic: 1,381 (year 2018),  Truck Traffic: 5%,  Features Intersected: OXFORD ROAD,  Facility Carried by Structure: ABANDONED R R
Minimum Vertical Clearance: 5.99m (19.65ft),  Kilometerpoint: 0.209,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 7.6m (24.9ft)

Discuss Blooming Grove, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.