Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Blountville, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 200ft / 61.4mTotal length
  • $5,966,000Total costs
  • 351,887Total average daily traffic
  • 87,351Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Blountville
  • No street view available for this location

New bridges in Blountville, TN - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 31940-1949
  • 21950-1959
  • 41960-1969
  • 161970-1979
  • 21980-1989
  • 11990-1999
  • 12000-2009
Reconstructed bridges in Blountville, TN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 11980-1989
Average Bridge Daily Traffic in Blountville, TN
Average Bridge Truck Traffic in Blountville, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 58.8%Good
  • 35.3%Satisfactory
  • 5.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 52.9%Good
  • 29.4%Satisfactory
  • 17.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 47.1%Good
  • 41.2%Satisfactory
  • 11.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 57.1%Good
  • 21.4%Satisfactory
  • 14.3%Fair
  • 7.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Good
  • 40.0%Satisfactory
  • 40.0%Fair
Find on map >>   Show street view

Structure Number: 82026660001,  Location: NE OF AIRPORT (Lat: 36.497250,  Lng: -82.355433),  Route carried "on" structure: County highway 2678,  Year Built: 1983,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,352 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,163 (year 2042),  Design Load: HS 20,  Features Intersected: MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.228,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 820A2210003,  Location: 2.5 M E OF AIRPORT (Lat: 36.481167,  Lng: -82.364717),  Route carried "on" structure: County highway 2599,  Year Built: 1965,  Status: Posted for load,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 1,775 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,840 (year 2042),  Design Load: H 15,  Features Intersected: MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.19m (26.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,792,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $2,689,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 820C4730001,  Location: JUST SE OF US11W-SR37 JCT (Lat: 36.575533,  Lng: -82.353500),  Route carried "on" structure: County highway 473,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 8,060 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,896 (year 2042),  Design Load: HS 20,  Features Intersected: REEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.045,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $371,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 820C5030001,  Location: N OFF US11W-2 M E OF SR37 (Lat: 36.581867,  Lng: -82.318767),  Route carried "on" structure: County highway 503,  Year Built: 1972,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 240 (year 2042),  Design Load: HS 20,  Features Intersected: REEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.043,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 820C5180001,  Location: HARRTRAIL RD-SW OF 11W-37 (Lat: 36.574567,  Lng: -82.366433),  Route carried "on" structure: County highway 518,  Year Built: 1976,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 230 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 368 (year 2042),  Design Load: HS 20,  Features Intersected: REEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.013,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 820C5190001,  Location: JUST NW OF US11W-SR37 JCT (Lat: 36.577783,  Lng: -82.362583),  Route carried "on" structure: County highway 519,  Year Built: 1915,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 160 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.198,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 23.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $187,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 820C8350001,  Location: 2.6 M E JCT SR 75&SR 357 (Lat: 36.479417,  Lng: -82.365150),  Route carried "on" structure: County highway 835,  Year Built: 1989,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 80 (year 2042),  Design Load: H 15,  Features Intersected: MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $473,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82I00810029,  Location: 1.5 M NE JCT I81&SR126 (Lat: 36.536667,  Lng: -82.363333),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 32,167 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 54,880 (year 2040),  Design Load: HS 20,  Features Intersected: NFA 2601
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.853,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82I0081003,  Location: 1.5 M NE JCT I81&SR126 (Lat: 36.536667,  Lng: -82.363333),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 32,167 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 54,880 (year 2041),  Design Load: HS 20,  Features Intersected: NFA 2601
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.853,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 79.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82I00810031,  Location: .8 M SW JCT I81&SR37 (Lat: 36.538333,  Lng: -82.348333),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 32,167 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 54,880 (year 2040),  Design Load: HS 20,  Features Intersected: NFA A140
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.108,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82I00810032,  Location: .8 M SW JCT I81&SR37 (Lat: 36.538333,  Lng: -82.348333),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 32,167 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 54,880 (year 2040),  Design Load: HS 20,  Features Intersected: NFA A140
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.108,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82I00810033,  Location: 3 M NE JCT I81&SR126 (Lat: 36.541667,  Lng: -82.336667),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 32,167 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 54,880 (year 2040),  Design Load: HS 20,  Features Intersected: SR 37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.379,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82I00810034,  Location: 3 M NE JCT I81&SR126 (Lat: 36.541667,  Lng: -82.336667),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 32,167 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 51,467 (year 2041),  Design Load: HS 20,  Features Intersected: SR 37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.379,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82I00810035,  Location: 2 M NE JCT I81&SR37 (Lat: 36.560000,  Lng: -82.311667),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 31,039 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 52,048 (year 2040),  Design Load: HS 20,  Features Intersected: NFA 2603
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.582,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82I00810036,  Location: 2 M NE JCT I81&SR37 (Lat: 36.560000,  Lng: -82.311667),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 31,039 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 52,048 (year 2041),  Design Load: HS 20,  Features Intersected: NFA 2603
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.582,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82SR0010031,  Location: 9 MI.EAST OF KINGSPORT (Lat: 36.576050,  Lng: -82.365000),  Route carried "on" structure: US 11,  Year Built: 1959,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 13,589 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,440 (year 2041),  Design Load: HS 20,  Features Intersected: REEDY CREEK,  Facility Carried by Structure: FAP 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.028,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $502,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 82SR0010033,  Location: 10 MI.SW.OF BRISTOL (Lat: 36.576717,  Lng: -82.359767),  Route carried "on" structure: US 11,  Year Built: 1959,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 13,589 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 21,742 (year 2041),  Design Load: HS 20,  Features Intersected: REEDY CREEK,  Facility Carried by Structure: FAP 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.333,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 26 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $670,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 82SR0750007,  Location: 1.50 MI.SE.OF SR037 (Lat: 36.519900,  Lng: -82.353050),  Route carried "on" structure: State highway 75,  Year Built: 2007,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 3,810 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,096 (year 2041),  Design Load: HS 20,  Features Intersected: ROBINSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.682,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.6m (103.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82SR1260003,  Location: 8 MI.SW.OF BRISTOL (Lat: 36.534817,  Lng: -82.358483),  Route carried "on" structure: State highway 126,  Year Built: 1948,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 2,844 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,550 (year 2041),  Design Load: H 15,  Features Intersected: ROBINSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.338,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $644,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82SR1260005,  Location: IN BRISTOL CITY LIMITS (Lat: 36.543017,  Lng: -82.303733),  Route carried "on" structure: State highway 126,  Year Built: 1948,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 4,560 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,296 (year 2041),  Design Load: H 15,  Features Intersected: EVANS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.228,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82SR3940013,  Location: S. OF BRISTOL (Lat: 36.575933,  Lng: -82.353983),  Route carried "on" structure: State highway 394,  Year Built: 1960,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 7,280 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 13,632 (year 2041),  Design Load: HS 20,  Features Intersected: REEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 82SR3940015,  Location: S. OF BRISTOL (Lat: 36.533333,  Lng: -82.327383),  Route carried "on" structure: State highway 394,  Year Built: 1999,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 15,039 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,256 (year 2041),  Design Load: HS 20,  Features Intersected: REEDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.778,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $430,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 82I00810029,  Location: BTWN SR126 & SR37 EXITS (Lat: 36.536667,  Lng: -82.363333),  Route carried "under" structure: County highway 13,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 RT LN,  Facility Carried by Structure: I81 RL
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 3.814,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 82I0081003,  Location: BTWN SR126 & SR37 EXITS (Lat: 36.536667,  Lng: -82.363333),  Route carried "under" structure: County highway 13,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 LF LN,  Facility Carried by Structure: I81 LL
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 3.766,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 82I00810031,  Location: JUST W OF I81-SR37 EXIT (Lat: 36.538333,  Lng: -82.348333),  Route carried "under" structure: County highway 140,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 RT LN,  Facility Carried by Structure: I81 RT LN
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 1.859,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 82I00810032,  Location: JUST W OF I81-SR37 EXIT (Lat: 36.538333,  Lng: -82.348333),  Route carried "under" structure: County highway 140,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 LF LN,  Facility Carried by Structure: I81 LF LN
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 1.820,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 82I00810033,  Location: NEAR BLUFF CITY TENN. (Lat: 36.541667,  Lng: -82.336667),  Route carried "under" structure: State highway 394,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 15,039 (year 2020),  Truck Traffic: 9%,  Features Intersected: I81,  Facility Carried by Structure: I81
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 4.361,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 82I00810034,  Location: NEAR BLUFF CITY TENN. (Lat: 36.541667,  Lng: -82.336667),  Route carried "under" structure: State highway 394,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 7,280 (year 2020),  Truck Traffic: 11%,  Features Intersected: I81,  Facility Carried by Structure: I81
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 4.313,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 82I00810035,  Location: BTWN US11W & SR37 EXITS (Lat: 36.560000,  Lng: -82.311667),  Route carried "under" structure: County highway 843,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 730 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 RT LN,  Facility Carried by Structure: I81 RL
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 3.859,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 82I00810036,  Location: BTWN US11W & SR37 EXITS (Lat: 36.560000,  Lng: -82.311667),  Route carried "under" structure: County highway 843,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 730 (year 2022),  Truck Traffic: 2%,  Features Intersected: I81 LF LN,  Facility Carried by Structure: I81 LL
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 3.899,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Discuss Blountville, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.