  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 59ft / 17.6mTotal length
  • $19,168,000Total costs
  • 93,120Total average daily traffic
  • 11,058Total average daily truck traffic
  • 175,428Total future (year 2024) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Blue Ridge
  • No street view available for this location

New bridges in Blue Ridge, VA - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 11950-1959
  • 41960-1969
  • 11970-1979
  • 42010-2019
Average Bridge Daily Traffic in Blue Ridge, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Excellent
  • 28.6%Very good
  • 28.6%Good
  • 28.6%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 22.2%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 55.6%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 55.6%Very good
  • 11.1%Good
  • 33.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 2646,  Location: 1.17 Rte 802E;0.08 Bot Co (Lat: 37.385725,  Lng: -79.796678),  Route carried "on" structure: US 221,  Year Built: 1966,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 15,222 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 19,724 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Conveyor Belt
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 265.565,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,146,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $3,840,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3324,  Location: 0.07-Rte607; 0.20-Rte768 (Lat: 37.351256,  Lng: -79.813247),  Route carried "on" structure: County highway 603,  Year Built: 1946,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 388 (year 2016),  Average Future Daily Traffic: 515 (year 2040),  Design Load: HL 93,  Features Intersected: Glade Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.776,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $644,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3337,  Location: 0.0-Rte640; 0.55-dead end (Lat: 37.450914,  Lng: -79.785406),  Route carried "on" structure: County highway 606,  Year Built: 1961,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 98 (year 2019),  Average Future Daily Traffic: 108 (year 2040),  Features Intersected: Back Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.172,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,295,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334,  Location: 0.15-Rt603; 1.85-Bedford (Lat: 37.352569,  Lng: -79.811461),  Route carried "on" structure: County highway 607,  Year Built: 1973,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,214 (year 2016),  Average Future Daily Traffic: 1,797 (year 2040),  Design Load: H 20,  Features Intersected: Glade Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.874,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $416,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,330,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 3435,  Location: 0.01-Rte606; 1.05-Rte763 (Lat: 37.451717,  Lng: -79.783700),  Route carried "on" structure: County highway 640,  Year Built: 1958,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 238 (year 2016),  Average Future Daily Traffic: 267 (year 2040),  Design Load: HS 15,  Features Intersected: Back Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.210,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $659,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $2,143,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 3515,  Location: 0.10-Rte607; 0.00-Rte607 (Lat: 37.354839,  Lng: -79.818431),  Route carried "on" structure: County highway 738,  Year Built: 2011,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,189 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,318 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Branch of Glade Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.666,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,156,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $3,411,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3542,  Location: 0.01-Rte460; 0.09-Rte1505 (Lat: 37.366694,  Lng: -79.817169),  Route carried "on" structure: Alternate County highway 1506,  Year Built: 1965,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 96 (year 2019),  Average Future Daily Traffic: 127 (year 2040),  Design Load: HS 20,  Features Intersected: Branch Glade Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.008,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.78m (2.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $387,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,259,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 25967,  Location: 1.55-Rte 606;0.89 Rte 640 (Lat: 37.460639,  Lng: -79.818778),  Route carried "on" structure: US 11,  Year Built: 2013,  Status: Open,  Structure Length: 1.38m (4.53ft),  Average Daily Traffic: 2,807 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,062 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Firestone Creek
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.3m (40.4ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 20.0m (65.6ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,278,000,  Roadway Improvement Cost: $383,000,  Total Project Cost: $4,090,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 30505,  Location: .02-Rte1536; .02-Rte1532_ (Lat: 37.372225,  Lng: -79.816944),  Route carried "on" structure: County highway 1537,  Year Built: 2017,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 80 (year 2019),  Average Future Daily Traffic: 88 (year 2040),  Features Intersected: Branch of Glade Creek,  Facility Carried by Structure: Oaklawn Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.65m (2.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $852,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 30873,  Location: 1.2M Spotsy-6.9M Rte630 (Lat: 38.340456,  Lng: -77.492478),  Route carried "on" structure: Interstate 95,  Year Built: 2019,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 70,840 (year 2014),  Truck Traffic: 13%,  Average Future Daily Traffic: 147,380 (year 2024),  Design Load: HL 93,  Features Intersected: ROUTE 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.7m (74.5ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 51.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Other
Find on map >>   Show street view

Structure Number: 5140020P,  Location: 1.4 MILES TO U.S. ROUTE 4 (Lat: 37.376500,  Lng: -79.838611),  Route carried "on" structure: Federal lands road 1,  Year Built: 1946,  Status: Posted for load-capacity,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 474 (year 2012),  Average Future Daily Traffic: 521 (year 2032),  Features Intersected: VA ROUTE 652,  Facility Carried by Structure: BLUE RIDGE PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 167.900,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $45,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $68,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: 5140022P,  Location: 1.0 MILES TO VA ROUTE 657 (Lat: 37.355833,  Lng: -79.835583),  Route carried "on" structure: Federal lands road 1,  Year Built: 1965,  Status: Posted for load-capacity,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 474 (year 2012),  Average Future Daily Traffic: 521 (year 2032),  Design Load: H 20,  Features Intersected: BLUE RIDGE PARKWAY,  Facility Carried by Structure: U.S. ROUTE 460
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 170.260,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 15 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.6m (41.3ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 29.2m (95.8ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $157,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $236,000 ( Estimate for 2018)