Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bluff City, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 246ft / 74.5mTotal length
  • $3,255,000Total costs
  • 118,398Total average daily traffic
  • 10,957Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bluff City
  • No street view available for this location

New bridges in Bluff City, TN - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 41920-1929
  • 41950-1959
  • 21960-1969
  • 31970-1979
  • 61980-1989
  • 21990-1999
  • 22000-2009
  • 42010-2019
Average Bridge Daily Traffic in Bluff City, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 60.0%Good
  • 10.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 30.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 70.0%Good
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.0%Very good
  • 30.0%Good
  • 35.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.1%Good
  • 63.6%Satisfactory
  • 27.3%Fair
Find on map >>   Show street view

Structure Number: 10SR0370035,  Location: .6 M SE SULLIVAN CO LN (Lat: 36.411667,  Lng: -82.258333),  Route carried "on" structure: US 37,  Year Built: 1990,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 8,938 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,301 (year 2041),  Design Load: HS 20,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.292,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.72m (2.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $362,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 82026580001,  Location: WEAVER BR. RD-W OF SR34 (Lat: 36.462450,  Lng: -82.292950),  Route carried "on" structure: County highway 2658,  Year Built: 1965,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 350 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 656 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.860,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $118,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 820C7650001,  Location: BTWN OLD & NEW SR37 (Lat: 36.425367,  Lng: -82.257617),  Route carried "on" structure: County highway 765,  Year Built: 1989,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 240 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 820C8110001,  Location: OFF SR37 NEAR CARTER CO L (Lat: 36.421150,  Lng: -82.235683),  Route carried "on" structure: County highway 811,  Year Built: 1989,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.042,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 82F00330001,  Location: 1.9 M SW JCT DR44&SR358 (Lat: 36.463400,  Lng: -82.225183),  Route carried "on" structure: State highway 44,  Year Built: 1977,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,113 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,048 (year 2041),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.419,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $112,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $169,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82F00350001,  Location: MTNVIEW RD-W OF US19E (Lat: 36.455250,  Lng: -82.258017),  Route carried "on" structure: County highway 17,  Year Built: 1986,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 300 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 480 (year 2042),  Design Load: HS 20,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.642,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 82S13710003,  Location: U M SE OF SR37-SR44 JCT (Lat: 36.458217,  Lng: -82.257267),  Route carried "on" structure: County highway 1371,  Year Built: 1988,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 528 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 845 (year 2042),  Design Load: HS 20,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.221,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82S25130001,  Location: 2.4 M SE JCT SR34&SR37 (Lat: 36.471967,  Lng: -82.251717),  Route carried "on" structure: State highway 44,  Year Built: 1950,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 1,113 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,048 (year 2041),  Design Load: H 15,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.442,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 82S25140001,  Location: E OF SR37 0N CARTER CO LI (Lat: 36.421150,  Lng: -82.235683),  Route carried "on" structure: County highway 1081,  Year Built: 1960,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,288 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,128 (year 2040),  Design Load: HS 20,  Features Intersected: BIG ARM BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 82S25140003,  Location: E OF SR37 N CARTER CO LI (Lat: 36.421467,  Lng: -82.234117),  Route carried "on" structure: County highway 1081,  Year Built: 1955,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,288 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,128 (year 2040),  Design Load: HS 20,  Features Intersected: BIG ARM BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 14,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020
Find on map >>   Show street view

Structure Number: 82S25140005,  Location: 1.1 M SW SR44&SR358 (Lat: 36.465650,  Lng: -82.220533),  Route carried "on" structure: State highway 44,  Year Built: 1955,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,860 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,120 (year 2041),  Design Load: H 15,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.934,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 82SR0340001,  Location: NEAR BLUFF CITY (Lat: 36.466717,  Lng: -82.284183),  Route carried "on" structure: US 11,  Year Built: 1977,  Status: Open,  Structure Length: 21.76m (71.39ft),  Average Daily Traffic: 21,100 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 45,536 (year 2041),  Design Load: H 15,  Features Intersected: HOLSTON RIVER & CO. RD.,  Facility Carried by Structure: FAP 34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.592,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 85.3m (279.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Underwater Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82SR0340035,  Location: NEAR BLUFF CITY (Lat: 36.455986,  Lng: -82.285906),  Route carried "on" structure: US 11,  Year Built: 2016,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 21,100 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 33,760 (year 2041),  Design Load: HL 93,  Features Intersected: SR037,  Facility Carried by Structure: FAP 34
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 8.449,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 88.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82SR0340036,  Location: NEAR BLUFF CITY (Lat: 36.456017,  Lng: -82.286211),  Route carried "on" structure: US 11,  Year Built: 2016,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 21,100 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 33,760 (year 2041),  Design Load: HL 93,  Features Intersected: SR037,  Facility Carried by Structure: FAP 34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.449,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 88.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82SR0370001,  Location: 1 MI.N.OF CARTER CO. LN. (Lat: 36.427250,  Lng: -82.264850),  Route carried "on" structure: County highway 1392,  Year Built: 1928,  Status: Posted for load,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 740 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,184 (year 2042),  Design Load: H 15,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.593,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 15.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.51m (8.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $518,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $778,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82SR0370003,  Location: 1 MI.N.OF CARTER CO. LN. (Lat: 36.431533,  Lng: -82.265783),  Route carried "on" structure: County highway 1392,  Year Built: 1928,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 740 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,184 (year 2042),  Design Load: H 15,  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.996,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 13.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.13m (13.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $828,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,243,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82SR0370005,  Location: 2 MI.N.OF CARTER CO. (Lat: 36.438767,  Lng: -82.266700),  Route carried "on" structure: County highway 1392,  Year Built: 1928,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 740 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,472 (year 2040),  Design Load: H 15,  Features Intersected: BOOHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.945,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $245,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 82SR0370007,  Location: 2.52 MI.N.OF CARTER CO. (Lat: 36.447883,  Lng: -82.270700),  Route carried "on" structure: County highway 20,  Year Built: 1928,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,720 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,752 (year 2042),  Design Load: HS 20,  Features Intersected: WOODS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.705,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 82SR0370009,  Location: 3.1 M N OF CARTER CO LN (Lat: 36.455833,  Lng: -82.275667),  Route carried "on" structure: County highway 20,  Year Built: 1989,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 1,720 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,752 (year 2042),  Design Load: HS 20,  Features Intersected: SOUTHERN RAILWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.690,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82SR0370015,  Location: 6MI.EAST OF F0017 (Lat: 36.476517,  Lng: -82.263450),  Route carried "on" structure: State highway 390,  Year Built: 1998,  Status: Open,  Structure Length: 12.70m (41.67ft),  Average Daily Traffic: 4,134 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,856 (year 2041),  Design Load: HS 20,  Features Intersected: HOLSTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 47.0m (154.2ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82SR0370017,  Location: AT CARTER CO LINE (Lat: 36.419650,  Lng: -82.250967),  Route carried "on" structure: US 19,  Year Built: 1988,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 8,938 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,301 (year 2041),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: FAS 37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.74m (2.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $340,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 15SR0350011,  Location: UPPER ROAD (Lat: 36.466717,  Lng: -82.284183),  Route carried "under" structure: County highway 212,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 140 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 35 RT LN,  Facility Carried by Structure: FAP 35
Minimum Vertical Clearance: 15.24m (50.00ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 15SR0350012,  Location: UPPER ROAD (Lat: 36.466717,  Lng: -82.284183),  Route carried "under" structure: County highway 212,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 140 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 34 RT LN,  Facility Carried by Structure: FAP 35
Minimum Vertical Clearance: 15.24m (50.00ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 820A3270001,  Location: AT HOLSTON R. AT BLUFF CI (Lat: 36.477200,  Lng: -82.256083),  Route carried "under" structure: County highway 327,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2022),  Truck Traffic: 2%,  Features Intersected: NORFOLK SOUTHERN RAILWAY,  Facility Carried by Structure: SOU RR 731137M
Minimum Vertical Clearance: 7.34m (24.08ft),  Kilometerpoint: 5.391,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 820B0840001,  Location: MC-CLELLAN ST-BLUFF CITY (Lat: 36.476200,  Lng: -82.258383),  Route carried "under" structure: City street 24,  Year Built: 1910,  Structure Length: 0. m,  Average Daily Traffic: 60 (year 2022),  Truck Traffic: 2%,  Features Intersected: NORFOLK SOUTHERN RAILWAY,  Facility Carried by Structure: SOU RWY 731138U
Minimum Vertical Clearance: 3.09m (10.14ft),  Kilometerpoint: 0.513,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 5.2m (17.1ft)

Find on map >>   Show street view

Structure Number: 82SR0340001,  Location: SOUTH OF BRISTOL (Lat: 36.466717,  Lng: -82.284183),  Route carried "under" structure: County highway 2658,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 350 (year 2020),  Truck Traffic: 3%,  Features Intersected: SR 34 RT LN,  Facility Carried by Structure: FAP 34
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 5.922,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 85.3m (279.9ft)

Find on map >>   Show street view

Structure Number: 82SR0340035,  Location: SOUTH OF BRISTOL (Lat: 36.450100,  Lng: -82.285906),  Route carried "under" structure: County highway 37,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 9,174 (year 2020),  Truck Traffic: 11%,  Features Intersected: 82-SR037-03.26,  Facility Carried by Structure: FAP 34
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 5.279,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 85.3m (279.9ft)

Find on map >>   Show street view

Structure Number: 82SR0340036,  Location: SOUTH OF BRISTOL (Lat: 36.450100,  Lng: -82.285906),  Route carried "under" structure: County highway 37,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 9,174 (year 2020),  Truck Traffic: 11%,  Features Intersected: 82-SR037-03.26,  Facility Carried by Structure: FAP 34
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 5.279,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 85.3m (279.9ft)

Discuss Bluff City, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.