Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Boaz, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 85ft / 26.1mTotal length
  • $11,146,000Total costs
  • 76,915Total average daily traffic
  • 10,059Total average daily truck traffic
  • 110,347Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Boaz
  • No street view available for this location

New bridges in Boaz, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21940-1949
  • 41960-1969
  • 11970-1979
  • 21980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Boaz, AL
Average Bridge Truck Traffic in Boaz, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Very good
  • 20.0%Good
  • 40.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.4%Very good
  • 28.6%Good
  • 35.7%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.1%Very good
  • 33.3%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 68,  Location: 0.1 MI S JCT CO RD 34 (Lat: 34.080556,  Lng: -86.420833),  Route carried "on" structure: State highway 75,  Year Built: 1929,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 4,890 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,294 (year 2041),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.465,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $204,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $224,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3361,  Location: 2.5 MI E JCT US431 *SR168 (Lat: 34.231222,  Lng: -86.125444),  Route carried "on" structure: State highway 168,  Year Built: 1948,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 6,319 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,847 (year 2038),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.678,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $691,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $760,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3362,  Location: 3 MI E JCT US 431 * SR168 (Lat: 34.235811,  Lng: -86.120572),  Route carried "on" structure: State highway 168,  Year Built: 1948,  Status: Closed,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 6,908 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,671 (year 2039),  Design Load: H 15,  Features Intersected: SHORT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.371,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.52m (31.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,893,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $2,082,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6799,  Location: 3.2 MI S SHELBY CO LINE (Lat: 33.023600,  Lng: -86.717367),  Route carried "on" structure: Interstate 65,  Year Built: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 38,990 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 58,485 (year 2041),  Design Load: HS 20,  Features Intersected: THIRD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 358.406,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,805,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,986,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8099,  Location: 0.6 MI S JCT SR 168 (Lat: 34.189100,  Lng: -86.161300),  Route carried "on" structure: State highway 205,  Year Built: 1923,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 3,744 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,242 (year 2038),  Design Load: H 15,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.001,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $733,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $806,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8451,  Location: 1.5 MI N JCT SR 168 (Lat: 34.218011,  Lng: -86.171678),  Route carried "on" structure: State highway 205,  Year Built: 1964,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 7,155 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 10,017 (year 2038),  Design Load: HS 20,  Features Intersected: SLAB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.421,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $947,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,042,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9722,  Location: Bruce Ave (Lat: 34.206667,  Lng: -86.131667),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 165 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: BRUCE AVE NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 44.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $168,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11991,  Location: 205 SUMMERVILLE RD SW (Lat: 34.179950,  Lng: -86.217172),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,250 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,425 (year 2042),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: SUMMERVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 40.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $168,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 126,  Location: @ BOAZ NATURE PARK (Lat: 34.191667,  Lng: -86.155000),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 100 (year 2022),  Average Future Daily Traffic: 200 (year 2042),  Design Load: H 15,  Features Intersected: CREEK,  Facility Carried by Structure: KING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.459,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $477,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13402,  Location: 2 MI SO BOAZ (Lat: 34.170000,  Lng: -86.150000),  Route carried "on" structure: State highway 205,  Year Built: 1984,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 2,702 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,783 (year 2039),  Design Load: H 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.802,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 73.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $370,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $407,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1624,  Location: 1236 FT E JCT 1376 (Lat: 34.214592,  Lng: -86.114286),  Route carried "on" structure: County highway 206,  Year Built: 1995,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 399 (year 2000),  Truck Traffic: 1%,  Average Future Daily Traffic: 450 (year 2038),  Design Load: HS 20,  Features Intersected: SHORT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 64.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $992,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $1,091,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16646,  Location: 2900 FT SE AL HWY 168 (Lat: 34.217558,  Lng: -86.126514),  Route carried "on" structure: County highway 373,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 2000),  Average Future Daily Traffic: 150 (year 2040),  Design Load: H 20,  Features Intersected: HORSESHOE CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $184,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $202,000 ( Estimate for 2022),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Other,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 17629,  Location: 367 FT SE JCT 168 (Lat: 34.231847,  Lng: -86.123392),  Route carried "on" structure: County highway 378,  Year Built: 2002,  Status: Open,  Structure Length: 4.25m (13.94ft),  Average Daily Traffic: 2,910 (year 2002),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,800 (year 2040),  Design Load: HS 20,  Features Intersected: SHORT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.23m (17.16ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,290,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,419,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2037,  Location: GOLD KIST RD * COLLEGE AV (Lat: 34.202000,  Lng: -86.182100),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,298 (year 2022),  Average Future Daily Traffic: 1,818 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: COLLEGE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $285,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $314,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Boaz, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.