Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Brady, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 217ft / 65.7mTotal length
  • $32,387,000Total costs
  • 87,935Total average daily traffic
  • 7,914Total average daily truck traffic
  • 103,590Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brady
  • No street view available for this location

New bridges in Brady, WA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 71960-1969
  • 11970-1979
  • 11980-1989
  • 22000-2009
Reconstructed bridges in Brady, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
Average Bridge Daily Traffic in Brady, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 58.3%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 66.7%Good
  • 25.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 41.7%Good
  • 25.0%Satisfactory
  • 16.7%Poor
  • 8.3%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 46.2%Very good
  • 23.1%Good
  • 23.1%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 7612A,  Location: 4.8 E JCT SR 107 (Lat: 46.997306,  Lng: -123.502611),  Route carried "on" structure: US 12,  Year Built: 1965,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 11,603 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,273 (year 2039),  Design Load: HS 20,  Features Intersected: SATSOP R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.736,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $2,072,000,  Roadway Improvement Cost: $414,000,  Total Project Cost: $4,144,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7612B,  Location: 4.8 E JCT SR 107 (Lat: 46.997378,  Lng: -123.502558),  Route carried "on" structure: US 12,  Year Built: 1965,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 11,603 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,273 (year 2039),  Design Load: HS 20,  Features Intersected: SATSOP R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.736,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,014,000,  Roadway Improvement Cost: $403,000,  Total Project Cost: $4,028,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7612C,  Location: 5.0 E JCT SR 107 (Lat: 46.998583,  Lng: -123.498250),  Route carried "on" structure: US 12,  Year Built: 1965,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 11,603 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,273 (year 2039),  Design Load: HS 20,  Features Intersected: SATSOP R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.057,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.33m (17.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,662,000,  Roadway Improvement Cost: $332,000,  Total Project Cost: $3,325,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7612D,  Location: 5.0 E JCT SR 107 (Lat: 46.998778,  Lng: -123.498167),  Route carried "on" structure: US 12,  Year Built: 1965,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 11,603 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,273 (year 2039),  Design Load: HS 20,  Features Intersected: SATSOP R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.057,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 38.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.33m (17.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,538,000,  Roadway Improvement Cost: $308,000,  Total Project Cost: $3,076,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7612E,  Location: 5.1 E JCT SR 107 (Lat: 46.999083,  Lng: -123.496306),  Route carried "on" structure: US 12,  Year Built: 1965,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 11,603 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,273 (year 2039),  Design Load: HS 20,  Features Intersected: SATSOP R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.235,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,251,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $2,502,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7612F,  Location: 5.1 E JCT SR 107 (Lat: 46.998747,  Lng: -123.498278),  Route carried "on" structure: US 12,  Year Built: 1965,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 11,603 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,273 (year 2039),  Design Load: HS 20,  Features Intersected: SATSOP R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.235,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.61m (18.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,251,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $2,502,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7612G,  Location: 5.2 E JCT SR 107 (Lat: 46.999556,  Lng: -123.493306),  Route carried "on" structure: US 12,  Year Built: 1965,  Status: Open,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 11,603 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,273 (year 2039),  Design Load: HS 20,  Features Intersected: SATSOP RIVER
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 25.412,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 84.7m (277.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.50m (41.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $3,280,000,  Roadway Improvement Cost: $656,000,  Total Project Cost: $6,560,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 80172,  Location: 01.7 N JCT 7078 (Lat: 46.991806,  Lng: -123.555000),  Route carried "on" structure: County highway 70991,  Year Built: 1971,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 154 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 230 (year 2038),  Design Load: HS 15,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: CAMP CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Critical,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,246,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 81773,  Location: 3.5 N BRADY (Lat: 47.043611,  Lng: -123.524444),  Route carried "on" structure: County highway 97250,  Year Built: 1985,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 1,429 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,455 (year 2039),  Design Load: HS 20,  Features Intersected: WEST FORK SATSOP RIVER,  Facility Carried by Structure: MIDDLE SATSOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 84405,  Location: 0.6 E SATSOP (Lat: 47.006111,  Lng: -123.469167),  Route carried "on" structure: County highway 97100,  Year Built: 1922,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,811 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,800 (year 2040),  Design Load: HS 15,  Features Intersected: NEWMAN CREEK,  Facility Carried by Structure: MONTE ELMA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,094,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84912,  Location: 0.6 E JCT W.SATSOP (Lat: 47.000000,  Lng: -123.498889),  Route carried "on" structure: County highway 97100,  Year Built: 1922,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 1,658 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,506 (year 2040),  Design Load: H 15,  Features Intersected: SATSOP OVERFLOW CHANNEL,  Facility Carried by Structure: MONTE ELMA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Very good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $3,910,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 86633,  Location: 0.12 E JCT 9725 (Lat: 47.009722,  Lng: -123.514514),  Route carried "on" structure: County highway 73120,  Year Built: 2001,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 35 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 43 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SATSOP OVERFLOW CHANNEL,  Facility Carried by Structure: GLEASON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87968,  Location: 2.2 N JCU 9710 (Lat: 47.026667,  Lng: -123.525000),  Route carried "on" structure: County highway 97250,  Year Built: 2008,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,627 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,645 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BUDD CREEK,  Facility Carried by Structure: MIDDLE SATSOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Discuss Brady, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.