  • 14Number of bridges
  • 105ft / 32.0mTotal length
  • $11,878,000Total costs
  • 49,139Total average daily traffic
  • 15,366Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bridge Creek
  • No street view available for this location

New bridges in Bridge Creek, OK - historical statistics
  • New bridges - historical statistics
  • 21960-1969
  • 31980-1989
  • 31990-1999
  • 62000-2009
Average Bridge Daily Traffic in Bridge Creek, OK
Average Bridge Truck Traffic in Bridge Creek, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 88.9%Good
  • 11.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 11.1%Good
  • 66.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Good
  • 66.7%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 11998,  Location: 3.5 E 1.5 S OF SH 37 (Lat: 35.268897,  Lng: -97.759333),  Route carried "on" structure: County highway N2940,  Year Built: 1992,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $294,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16103,  Location: T.P.BR.NO 9.94 (Lat: 35.203611,  Lng: -97.735833),  Route carried "on" structure: County highway 2629,  Year Built: 1964,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: BAILEY A TP (I-44) UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.432,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.43m (17.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $1,019,000,  Total Project Cost: $1,943,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20448,  Location: 4.E 1.S OF JCT SH37 SH92 (Lat: 35.276294,  Lng: -97.748853),  Route carried "on" structure: County highway E1200,  Year Built: 1983,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: WORLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 22142,  Location: 3.9E 3.S JCT SH37 SH92 (Lat: 35.247300,  Lng: -97.752653),  Route carried "on" structure: County highway E1220,  Year Built: 1989,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: WORLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $241,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22173,  Location: 3.2 E 2.5 S OF TUTTLE (Lat: 35.253881,  Lng: -97.759311),  Route carried "on" structure: County highway N2940,  Year Built: 1989,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 10,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.28m (10.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $265,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24738,  Location: .5 E 6.4 S OF SH 37 (Lat: 35.197806,  Lng: -97.811381),  Route carried "on" structure: County highway N2910,  Year Built: 1996,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 326 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 522 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $369,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 25577,  Location: 6. S .2 E OF TUTTLE (Lat: 35.203692,  Lng: -97.809175),  Route carried "on" structure: County highway 2606C,  Year Built: 1998,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 213 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 341 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.734,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.83m (12.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $196,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $311,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 25943,  Location: 00.01N (Lat: 35.217347,  Lng: -97.715722),  Route carried "on" structure: Spur Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 2,700 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,320 (year 2040),  Design Load: HS 20,  Features Intersected: BAILEY A TP (I-44) UNDER,  Facility Carried by Structure: BAILEY NORMAN SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 20.0m (65.6ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $986,000,  Roadway Improvement Cost: $1,250,000,  Total Project Cost: $2,554,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 25944,  Location: 00.01S (Lat: 35.217192,  Lng: -97.715947),  Route carried "on" structure: Spur Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 2,700 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,320 (year 2040),  Design Load: HS 20,  Features Intersected: BAILEY A TP (I-44) UNDER,  Facility Carried by Structure: BAILEY NORMAN SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 20.0m (65.6ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $1,200,000,  Total Project Cost: $2,286,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26581,  Location: 5E 4S JCT SH-37/SH-92 (Lat: 35.232525,  Lng: -97.724922),  Route carried "on" structure: State highway 4,  Year Built: 2001,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 4,200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,720 (year 2040),  Design Load: HL 93,  Features Intersected: EW123 (BR/ CREEK RD.)UND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.608,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.52m (27.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,211,000,  Roadway Improvement Cost: $1,998,000,  Total Project Cost: $3,390,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16103,  Location: T.P.BR.NO 9.94 (Lat: 35.203611,  Lng: -97.735833),  Route carried "under" structure: Interstate 44,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 19,300 (year 2020),  Truck Traffic: 36%,  Features Intersected: BAILEY A TP (I-44) UNDER,  Facility Carried by Structure: CO. RD. FAS 2629
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 48.432,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 25943,  Location: 00.01N (Lat: 35.217347,  Lng: -97.715722),  Route carried "under" structure: Interstate 40,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 9,650 (year 2020),  Truck Traffic: 36%,  Features Intersected: BAILEY A TP (I-44) UNDER,  Facility Carried by Structure: BAILEY NORMAN SPUR
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 50.812,  Lanes on structure: 3,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 25944,  Location: 00.01S (Lat: 35.217192,  Lng: -97.715947),  Route carried "under" structure: Interstate 40,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 9,350 (year 2020),  Truck Traffic: 36%,  Features Intersected: BAILEY A TP (I-44) UNDER,  Facility Carried by Structure: BAILEY NORMAN SPUR
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 50.812,  Lanes on structure: 3,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 26581,  Location: 5E 4S JCT SH-37/SH-92 (Lat: 35.232525,  Lng: -97.724922),  Route carried "under" structure: County highway E1230,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Features Intersected: EW123 (BR/ CREEK RD.)UND,  Facility Carried by Structure: S.H. 4
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 1.608,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)