Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Brilliant, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 276ft / 83.7mTotal length
  • $38,844,000Total costs
  • 105,257Total average daily traffic
  • 31,019Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brilliant
  • No street view available for this location

New bridges in Brilliant, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21910-1919
  • 41940-1949
  • 11950-1959
  • 11980-1989
  • 131990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Brilliant, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 11960-1969
Average Bridge Daily Traffic in Brilliant, AL
Average Bridge Truck Traffic in Brilliant, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 60.0%Good
  • 20.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Very good
  • 50.0%Good
  • 10.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Very good
  • 40.0%Good
  • 10.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 30.8%Good
  • 38.5%Satisfactory
  • 15.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 44.4%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 2535,  Location: 1 MI W JCT AL 241 (Lat: 34.131222,  Lng: -87.762639),  Route carried "on" structure: US 278,  Year Built: 1941,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,588 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,972 (year 2041),  Design Load: H 15,  Features Intersected: Branch,  Facility Carried by Structure: AL-74
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.354,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $495,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3131,  Location: 0.6 MI N JCT US 278 (Lat: 34.132250,  Lng: -87.732472),  Route carried "on" structure: State highway 129,  Year Built: 1947,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,634 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,223 (year 2040),  Design Load: H 15,  Features Intersected: Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.755,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $273,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3339,  Location: 1.5 MI N JCT SR 44 (Lat: 34.030917,  Lng: -87.751806),  Route carried "on" structure: State highway 129,  Year Built: 1948,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 2,140 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,782 (year 2040),  Design Load: H 15,  Features Intersected: Little New River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.329,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,444,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,588,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 334,  Location: 0.6 MI S JCT US 278 (Lat: 34.112500,  Lng: -87.731472),  Route carried "on" structure: Spur State highway 129,  Year Built: 1948,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 1,343 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,757 (year 2040),  Design Load: H 15,  Features Intersected: Buttahatchee River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.222,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,309,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,440,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5381,  Location: 3000 SE OF ST RD 129 (Lat: 34.028083,  Lng: -87.739917),  Route carried "on" structure: County highway 24,  Year Built: 1919,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 285 (year 2001),  Truck Traffic: 25%,  Average Future Daily Traffic: 650 (year 2036),  Design Load: H 15,  Features Intersected: LITTLE NEW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $299,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 579,  Location: 2 MI W JCT AL 233 (Lat: 34.110389,  Lng: -87.714556),  Route carried "on" structure: US 278,  Year Built: 1957,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,080 (year 2013),  Truck Traffic: 19%,  Average Future Daily Traffic: 1,374 (year 2041),  Design Load: HS 20,  Features Intersected: Buttahatchee Creek,  Facility Carried by Structure: AL-74
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.716,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,565,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $1,722,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6076,  Location: 3 MILES NORTH OF WINFIELD (Lat: 33.972333,  Lng: -87.803222),  Route carried "on" structure: County highway 47,  Year Built: 1900,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 390 (year 2001),  Truck Traffic: 30%,  Average Future Daily Traffic: 784 (year 2035),  Design Load: H 15,  Features Intersected: East Branch Luxapallila
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 46.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $365,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8941,  Location: 4 MILES NE WINFIELD (Lat: 33.986556,  Lng: -87.810833),  Route carried "on" structure: County highway 68,  Year Built: 1919,  Year Reconstructed: 1966,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 240 (year 2001),  Truck Traffic: 15%,  Average Future Daily Traffic: 490 (year 2035),  Design Load: H 20,  Features Intersected: Dickenson Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $248,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14782,  Location: 1.6 MI N OF COTTONDALE (Lat: 33.172381,  Lng: -87.447553),  Route carried "on" structure: County highway 85,  Year Built: 1989,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 5,000 (year 2009),  Truck Traffic: 50%,  Average Future Daily Traffic: 4,480 (year 2029),  Design Load: HS 20,  Features Intersected: I-59, I-20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 16.6m (54.5ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,331,000,  Roadway Improvement Cost: $433,000,  Total Project Cost: $4,764,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16067,  Location: 0.1 MI E JCT SR 4 (Lat: 34.012967,  Lng: -87.832561),  Route carried "on" structure: State highway 44,  Year Built: 1994,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,440 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,974 (year 2041),  Design Load: H 15,  Features Intersected: Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.716,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.3m (50.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,297,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $2,527,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17205,  Location: 2.8 KM W OF AL-29 JCT. (Lat: 33.998028,  Lng: -87.805722),  Route carried "on" structure: County highway 4,  Year Built: 1997,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 70 (year 2018),  Average Future Daily Traffic: 260 (year 2041),  Design Load: HS 20,  Features Intersected: I-22,  Facility Carried by Structure: CR-68
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.068,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.99m (36.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,089,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $3,398,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18069,  Location: AL-74 b/t AL-241*129 (Lat: 34.127167,  Lng: -87.737833),  Route carried "on" structure: US 278,  Year Built: 2010,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 1,057 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: HS 20,  Features Intersected: Buttahatchee River,  Facility Carried by Structure: AL-74
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 31.720,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.8m (45.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,347,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $2,582,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18191,  Location: 0.2 MI. N. US-278 (Lat: 34.128250,  Lng: -87.737944),  Route carried "on" structure: Ramp State highway 129,  Year Built: 2008,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 1,634 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,000 (year 2041),  Design Load: HS 20,  Features Intersected: Buttahatchee River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.580,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,398,000,  Roadway Improvement Cost: $240,000,  Total Project Cost: $2,638,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18412,  Location: 10.6 MI E of US-43 (Lat: 34.002639,  Lng: -87.815778),  Route carried "on" structure: Interstate 22,  Year Built: 1997,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 12,325 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20,  Features Intersected: CR-61
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.337,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,911,000,  Roadway Improvement Cost: $291,000,  Total Project Cost: $3,202,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18414,  Location: 10.6 MI East of US-43 (Lat: 34.002222,  Lng: -87.815806),  Route carried "on" structure: Interstate 22,  Year Built: 1997,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 12,325 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20,  Features Intersected: CR-61
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.337,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,911,000,  Roadway Improvement Cost: $291,000,  Total Project Cost: $3,202,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18416,  Location: 11 MI E of US-43 (Lat: 33.997389,  Lng: -87.802667),  Route carried "on" structure: Interstate 22,  Year Built: 1997,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 12,834 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 14,863 (year 2040),  Design Load: HS 20,  Features Intersected: Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.593,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.0m (72.2ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $4,364,000,  Roadway Improvement Cost: $436,000,  Total Project Cost: $4,800,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18417,  Location: 12MI E of US-43 (Lat: 33.992611,  Lng: -87.787167),  Route carried "on" structure: Interstate 22,  Year Built: 1997,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 12,834 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20,  Features Intersected: CR-47
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.220,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.7m (38.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,020,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,222,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1842,  Location: on CR-47 (Lat: 33.992944,  Lng: -87.787028),  Route carried "on" structure: Interstate 22,  Year Built: 1993,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 12,834 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 14,863 (year 2040),  Design Load: HS 20,  Features Intersected: AL-4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.220,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.53m (5.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $779,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $857,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18449,  Location: 12 MI E of US-43 (Lat: 33.992000,  Lng: -87.787194),  Route carried "on" structure: Interstate 22,  Year Built: 1997,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 12,834 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 15,000 (year 2040),  Design Load: HS 20,  Features Intersected: CR-47
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.220,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.7m (38.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,020,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,222,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17205,  Location: 2.8 KM W OF AL-29 JCT. (Lat: 33.998028,  Lng: -87.805722),  Route carried "under" structure: Interstate 22,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 10,970 (year 2018),  Truck Traffic: 32%,  Features Intersected: I-22,  Facility Carried by Structure: CR-68
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 45.316,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 18412,  Location: 10.6 MI E of US-43 (Lat: 34.002639,  Lng: -87.815778),  Route carried "under" structure: County highway 61,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 75 (year 2018),  Features Intersected: CR-61,  Facility Carried by Structure: I-22
Minimum Vertical Clearance: 9.45m (31.00ft),  Kilometerpoint: 5.795,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 18414,  Location: 10.6 MI East of US-43 (Lat: 34.002222,  Lng: -87.815806),  Route carried "under" structure: County highway 61,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 75 (year 2018),  Features Intersected: CR-61,  Facility Carried by Structure: I-22
Minimum Vertical Clearance: 9.45m (31.00ft),  Kilometerpoint: 5.794,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 18417,  Location: 12MI E of US-43 (Lat: 33.992611,  Lng: -87.787167),  Route carried "under" structure: County highway 47,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2018),  Features Intersected: CR-47,  Facility Carried by Structure: I-22
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 7.966,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 18449,  Location: 12 MI E of US-43 (Lat: 33.992000,  Lng: -87.787194),  Route carried "under" structure: County highway 47,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 1%,  Features Intersected: CR-47,  Facility Carried by Structure: I-22
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 7.968,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Discuss Brilliant, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.