Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Calverton, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 190ft / 58.3mTotal length
  • $83,253,000Total costs
  • 126,785Total average daily traffic
  • 3,998Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Calverton
  • No street view available for this location

New bridges in Calverton, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 121970-1979
Reconstructed bridges in Calverton, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 32010-2019
  • 32020-2022
Average Bridge Daily Traffic in Calverton, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Excellent
  • 12.5%Good
  • 37.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Very good
  • 12.5%Good
  • 50.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 75.0%Good
  • 12.5%Satisfactory
Find on map >>   Show street view

Structure Number: 1056191,  Location: .4 MI N I495 + SH 24 (Lat: 40.909164,  Lng: -72.737069),  Route carried "on" structure: Interstate 495,  Year Built: 1972,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 10,314 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,829 (year 2040),  Design Load: HS 20,  Features Intersected: RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.314,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.6m (139.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,527,000,  Roadway Improvement Cost: $2,651,000,  Total Project Cost: $7,179,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1056192,  Location: .4 MI N I495 + SH 24 (Lat: 40.909267,  Lng: -72.736594),  Route carried "on" structure: Interstate 495,  Year Built: 1972,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 10,314 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,829 (year 2040),  Design Load: HS 20,  Features Intersected: RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.314,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.6m (139.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,322,000,  Roadway Improvement Cost: $2,531,000,  Total Project Cost: $6,853,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1056201,  Location: .8 MILE N JCT I495 & SH24 (Lat: 40.913661,  Lng: -72.733481),  Route carried "on" structure: Interstate 495,  Year Built: 1972,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 10.12m (33.20ft),  Average Daily Traffic: 10,314 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,829 (year 2040),  Design Load: HS 20,  Features Intersected: LIRR- MAIN LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.893,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 40.8m (133.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $7,547,000,  Roadway Improvement Cost: $4,419,000,  Total Project Cost: $11,966,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1056202,  Location: .8 MILE N JCT I495 & SH 2 (Lat: 40.913858,  Lng: -72.732850),  Route carried "on" structure: Interstate 495,  Year Built: 1972,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 9.91m (32.51ft),  Average Daily Traffic: 10,314 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,829 (year 2040),  Design Load: HS 20,  Features Intersected: LIRR - MAIN LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.893,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $7,287,000,  Roadway Improvement Cost: $4,267,000,  Total Project Cost: $11,553,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1056219,  Location: JCT I495 & SH 25 (Lat: 40.920344,  Lng: -72.723708),  Route carried "on" structure: State highway 25,  Year Built: 1972,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 7,896 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,592 (year 2040),  Design Load: HS 20,  Features Intersected: 495I 495 07031402 EB to,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.843,  Lanes on structure: 5,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 30.0m (98.4ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 8.26m (27.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $10,976,000,  Roadway Improvement Cost: $6,427,000,  Total Project Cost: $17,403,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105622,  Location: 0.3 MI NE RTE 495+RTE 25 (Lat: 40.922778,  Lng: -72.719781),  Route carried "on" structure: Interstate 495,  Year Built: 1972,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 8,954 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,401 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 58, COUNTY R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 4,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 57.9m (190.0ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,300,000,  Roadway Improvement Cost: $3,689,000,  Total Project Cost: $9,990,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105623,  Location: .3 MI NW RTE 495+RTE 25 (Lat: 40.923228,  Lng: -72.726672),  Route carried "on" structure: State highway 25,  Year Built: 1972,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 5.76m (18.90ft),  Average Daily Traffic: 5,825 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,720 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY RD 58 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.440,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.8m (179.8ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.76m (18.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $4,722,000,  Roadway Improvement Cost: $2,765,000,  Total Project Cost: $7,488,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106087,  Location: .8 MI W JCT I495 & SH25 (Lat: 40.916286,  Lng: -72.709561),  Route carried "on" structure: State highway 25,  Year Built: 1924,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 7,896 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,592 (year 2040),  Design Load: H 20,  Features Intersected: LONG ISLAND- M.L.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.178,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.26m (30.38ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $6,824,000,  Roadway Improvement Cost: $3,996,000,  Total Project Cost: $10,821,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1056191,  Location: .4 MI N I495 + SH 24 (Lat: 40.909164,  Lng: -72.737069),  Route carried "under" structure: Other road ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 2021),  Features Intersected: RIVER RD,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.6m (139.8ft)

Find on map >>   Show street view

Structure Number: 1056192,  Location: .4 MI N I495 + SH 24 (Lat: 40.909267,  Lng: -72.736594),  Route carried "under" structure: Other road ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 2021),  Features Intersected: RIVER RD,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.6m (139.8ft)

Find on map >>   Show street view

Structure Number: 1056219,  Location: JCT I495 & SH 25 (Lat: 40.920344,  Lng: -72.723708),  Route carried "under" structure: Interstate 495,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 12,600 (year 1982),  Features Intersected: 495I 495 07031402 EB to,,  Facility Carried by Structure: RTE 25
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 65.181,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 105622,  Location: 0.3 MI NE RTE 495+RTE 25 (Lat: 40.922778,  Lng: -72.719781),  Route carried "under" structure: County highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 26,981 (year 2003),  Features Intersected: COUNTY ROAD 58, COUNTY R,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 105623,  Location: .3 MI NW RTE 495+RTE 25 (Lat: 40.923228,  Lng: -72.726672),  Route carried "under" structure: County highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 13,777 (year 2003),  Features Intersected: COUNTY RD 58 EB,  Facility Carried by Structure: RTE 25
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.8m (179.8ft)

Discuss Calverton, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.