Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Camas, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 358ft / 109mTotal length
  • $73,687,000Total costs
  • 219,662Total average daily traffic
  • 14,391Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Camas
  • No street view available for this location

New bridges in Camas, WA - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 41930-1939
  • 11940-1949
  • 21950-1959
  • 81960-1969
  • 11990-1999
  • 12000-2009
  • 42010-2019
Reconstructed bridges in Camas, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 11940-1949
  • 21950-1959
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Camas, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Very good
  • 64.7%Good
  • 17.6%Satisfactory
  • 11.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.8%Very good
  • 41.2%Good
  • 41.2%Satisfactory
  • 5.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.8%Very good
  • 41.2%Good
  • 41.2%Satisfactory
  • 5.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 20.0%Good
  • 6.7%Satisfactory
  • 6.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: FV,  Location: 13.8 E JCT SR 503 (Lat: 45.589778,  Lng: -122.403056),  Route carried "on" structure: State highway 500,  Year Built: 1915,  Year Reconstructed: 1937,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 7,743 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,211 (year 2039),  Features Intersected: HJF CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.449,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $390,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: II,  Location: 12.6 E JCT SR 503 (Lat: 45.604389,  Lng: -122.407139),  Route carried "on" structure: State highway 500,  Year Built: 1930,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 11,297 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,358 (year 2039),  Features Intersected: LACAMAS LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.598,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.41m (7.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $411,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $822,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4241A,  Location: 14.4 E JCT SR 503 (Lat: 45.584072,  Lng: -122.397472),  Route carried "on" structure: State highway 500,  Year Built: 1954,  Status: Open,  Structure Length: 14.02m (46.00ft),  Average Daily Traffic: 4,266 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,177 (year 2039),  Design Load: HS 15,  Features Intersected: WASHOUGAL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.527,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 2,  Length of Maximum Span: 51.8m (169.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.02m (46.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,496,000,  Roadway Improvement Cost: $699,000,  Total Project Cost: $6,992,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4241B,  Location: 14.4 E JCT SR 503 (Lat: 45.584114,  Lng: -122.397525),  Route carried "on" structure: State highway 500,  Year Built: 1954,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,266 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,177 (year 2039),  Features Intersected: UTILITY VAULT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.511,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft)

Condition: Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $358,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 6845A,  Location: 7.7 E JCT I-205 (Lat: 45.576972,  Lng: -122.404278),  Route carried "on" structure: State highway 14,  Year Built: 1962,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 15,623 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 22,622 (year 2039),  Design Load: HS 20,  Features Intersected: EAST CAMAS SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.048,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Navigation Control: Yes ( Vertical Clearance: 11.3m (37.1ft), Horizontal Clearance: 35.4m (116.1ft)),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.52m (34.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $2,553,000,  Roadway Improvement Cost: $511,000,  Total Project Cost: $5,106,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7138A,  Location: 6.7 E JCT I-205 (Lat: 45.578606,  Lng: -122.424639),  Route carried "on" structure: State highway 14,  Year Built: 1964,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 31.64m (103.81ft),  Average Daily Traffic: 31,246 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 45,244 (year 2039),  Design Load: HS 20,  Features Intersected: WEST CAMAS SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.310,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 9.8m (32.2ft), Horizontal Clearance: 70.1m (230.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 86.6m (284.1ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 31.64m (103.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Underwater Inspection Date: July 2018,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $8,719,000,  Roadway Improvement Cost: $1,744,000,  Total Project Cost: $17,438,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7595A,  Location: 6.3 E JCT I-205 (Lat: 45.580917,  Lng: -122.429861),  Route carried "on" structure: State highway 14,  Year Built: 1965,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 30,353 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 43,951 (year 2039),  Design Load: HS 20,  Features Intersected: E-6TH RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.827,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 24.8m (81.4ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,088,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,176,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7595B,  Location: 6.3 E JCT I-205 (Lat: 45.580389,  Lng: -122.428528),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 1,297 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,044 (year 2036),  Design Load: HS 20,  Features Intersected: SR 14,  Facility Carried by Structure: SW 6TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $1,504,000,  Roadway Improvement Cost: $301,000,  Total Project Cost: $3,008,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8432A,  Location: 14.2 E JCT SR 503 (Lat: 45.584611,  Lng: -122.401556),  Route carried "on" structure: State highway 500,  Year Built: 1968,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 4,484 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,492 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BN SF RY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.189,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,664,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $3,328,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 18105A,  Location: 7.7 E JCT I-205 (Lat: 45.577189,  Lng: -122.403567),  Route carried "on" structure: State highway 14,  Year Built: 2012,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 15,623 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 22,622 (year 2039),  Design Load: HL 93,  Features Intersected: EAST CAMAS SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.048,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 9.4m (30.8ft), Horizontal Clearance: 35.4m (116.1ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.52m (34.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $2,898,000,  Roadway Improvement Cost: $580,000,  Total Project Cost: $5,796,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18105B,  Location: 8.6 E JCT I-205 (Lat: 45.580111,  Lng: -122.385667),  Route carried "on" structure: State highway 14,  Year Built: 2012,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 23,986 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 34,731 (year 2039),  Design Load: HL 93,  Features Intersected: SR 500 / UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.529,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2019,  Bridge Improvement Cost: $1,529,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $3,058,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80874,  Location: 0.2N JCT NE58 ST (Lat: 45.667967,  Lng: -122.434567),  Route carried "on" structure: County highway 31650,  Year Built: 1930,  Year Reconstructed: 1953,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 814 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,102 (year 2038),  Design Load: HS 15,  Features Intersected: MATNEY CREEK,  Facility Carried by Structure: NE 232ND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 19.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,064,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80952,  Location: 0.4E OF NE217 AVE (Lat: 45.672367,  Lng: -122.439950),  Route carried "on" structure: County highway 30740,  Year Built: 1938,  Year Reconstructed: 1955,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 807 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,102 (year 2038),  Design Load: HS 15,  Features Intersected: MATNEY CREEK,  Facility Carried by Structure: NE 68TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 14.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,216,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82699,  Location: 3500' E NE 202 AV (Lat: 45.638800,  Lng: -122.456683),  Route carried "on" structure: City street 93350,  Year Built: 1933,  Year Reconstructed: 1957,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 7,195 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,944 (year 2037),  Design Load: HS 15,  Features Intersected: LACAMAS CREEK,  Facility Carried by Structure: NE GOODWIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,246,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $2,493,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85071,  Location: 1.4 E JCT. SR 500 (Lat: 45.587611,  Lng: -122.372611),  Route carried "on" structure: City street 145,  Year Built: 1947,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 9,924 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 32,704 (year 2038),  Design Load: HS 20,  Features Intersected: WASHOUGAL RIVER,  Facility Carried by Structure: NE 3 AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.16m (23.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $5,828,000,  Roadway Improvement Cost: $1,166,000,  Total Project Cost: $11,656,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 85153,  Location: 0.15 N JCT NW 6AVE (Lat: 45.587556,  Lng: -122.409722),  Route carried "on" structure: City street 145,  Year Built: 1960,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,518 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,401 (year 2039),  Design Load: HS 20,  Features Intersected: CROWN Z MILL WATER CANAL,  Facility Carried by Structure: DIVISION STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,216,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85888,  Location: 0.1N JCT NE68 ST (Lat: 45.672714,  Lng: -122.450075),  Route carried "on" structure: County highway 52910,  Year Built: 1991,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 619 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,903 (year 2039),  Features Intersected: LACAMAS CREEK,  Facility Carried by Structure: NE 217TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,778,000,  Roadway Improvement Cost: $356,000,  Total Project Cost: $3,557,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8706,  Location: 0.1 MI N OF 7TH AVE (Lat: 45.589078,  Lng: -122.406383),  Route carried "on" structure: City street 145,  Year Built: 1919,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,231 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,200 (year 2037),  Features Intersected: CROWN Z MILL WATER DITCH,  Facility Carried by Structure: DALLAS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,003,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 87061,  Location: 0.1 M E NE OF GOODWIN RD (Lat: 45.632667,  Lng: -122.459111),  Route carried "on" structure: ServiceCity street 145,  Year Built: 2000,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 350 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,053 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: DWYER CREEK,  Facility Carried by Structure: CAMAS MEADOWS DRV.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 3.6m (11.8ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,642,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 88552,  Location: .25 miles west of 283rd (Lat: 45.604436,  Lng: -122.385850),  Route carried "on" structure: City street 145,  Year Built: 2013,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 400 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: Tributary to Lacamas Ck,  Facility Carried by Structure: NE Woodburn Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 96.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 95.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $684,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,368,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 7595A,  Location: 6.1 E JCT I-205 (Lat: 45.580917,  Lng: -122.429861),  Route carried "under" structure: Ramp State highway 14,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,889 (year 2019),  Truck Traffic: 3%,  Features Intersected: E-6TH RAMP
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 0.499,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 7595B,  Location: 6.3 E JCT I-205 (Lat: 45.580389,  Lng: -122.428528),  Route carried "under" structure: State highway 14,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 30,353 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 14,  Facility Carried by Structure: SW 6TH AVE
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 19.956,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 18105B,  Location: 15.2 E JCT SR 503 (Lat: 45.580111,  Lng: -122.385667),  Route carried "under" structure: State highway 500,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 3,578 (year 2019),  Truck Traffic: 6%,  Features Intersected: SR 500 / UNION ST,  Facility Carried by Structure: SR 14
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 32.782,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Discuss Camas, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.