Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cambridge, Iowa (IA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 236ft / 72.0mTotal length
  • 10,155Total average daily traffic
  • 653Total average daily truck traffic
  • 10,225Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cambridge
  • No street view available for this location

New bridges in Cambridge, IA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21930-1939
  • 21940-1949
  • 31950-1959
  • 11960-1969
  • 11970-1979
  • 71980-1989
  • 12000-2009
  • 12020-2022
Reconstructed bridges in Cambridge, IA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 37.5%Good
  • 18.8%Satisfactory
  • 12.5%Fair
  • 18.8%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 18.8%Good
  • 37.5%Satisfactory
  • 6.3%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.8%Very good
  • 37.5%Good
  • 12.5%Satisfactory
  • 12.5%Fair
  • 18.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.3%Very good
  • 42.1%Good
  • 42.1%Satisfactory
  • 10.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 4902,  Location: 2.5 MILES E OF JCT I-35 (Lat: 41.877694,  Lng: -93.522228),  Route carried "on" structure: State highway 210,  Year Built: 1939,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 1,730 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,730 (year 2040),  Design Load: HS 20,  Features Intersected: UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.089,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 62.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 49031,  Location: 1.2 MILES E OF SR R70 (Lat: 41.877647,  Lng: -93.508306),  Route carried "on" structure: State highway 210,  Year Built: 1988,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 1,730 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,730 (year 2040),  Design Load: HS 20,  Features Intersected: SOUTH SKUNK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.244,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 44.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: November 2020,  Underwater Inspection Date: November 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2827,  Location: 081231001 (Lat: 41.849475,  Lng: -93.509806),  Route carried "on" structure: County highway ,  Year Built: 1928,  Status: Posted for load,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 30 (year 2016),  Average Future Daily Traffic: 30 (year 2041),  Features Intersected: SKUNK RIVER,  Facility Carried by Structure: LOCAL ROAD
Minimum Vertical Clearance: 3.53m (11.58ft),  Kilometerpoint: 9.138,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 25.00m (82.02ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $60,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 31375,  Location: 082221802 (Lat: 41.919942,  Lng: -93.463361),  Route carried "on" structure: County highway ,  Year Built: 1941,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 990 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 990 (year 2041),  Design Load: H 15,  Features Intersected: CALAMUS CREEK,  Facility Carried by Structure: S14/620TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.297,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $115,000,  Roadway Improvement Cost: $23,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 313961,  Location: 082230402 (Lat: 41.940592,  Lng: -93.541114),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 820 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 820 (year 2041),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: R70/580TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.194,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 313971,  Location: 082230402 (Lat: 41.946397,  Lng: -93.541142),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 820 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 820 (year 2041),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: 580TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.840,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 31399,  Location: 082230501 (Lat: 41.950453,  Lng: -93.551506),  Route carried "on" structure: County highway ,  Year Built: 1929,  Year Reconstructed: 1975,  Status: Posted for load,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 60 (year 2019),  Average Future Daily Traffic: 60 (year 2041),  Design Load: H 10,  Features Intersected: SKUNK RIVER,  Facility Carried by Structure: 280TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.296,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 20.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 21.80m (71.52ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Critical Feature Inspection Date: Febuary 2021,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $53,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 314071,  Location: 082230904 (Lat: 41.934589,  Lng: -93.541153),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Posted for load,  Structure Length: 10.12m (33.20ft),  Average Daily Traffic: 820 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 820 (year 2041),  Design Load: HS 20,  Features Intersected: SKUNK RIVER,  Facility Carried by Structure: R70/580TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.512,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31408,  Location: 082230907 (Lat: 41.933614,  Lng: -93.534383),  Route carried "on" structure: County highway ,  Year Built: 1937,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 80 (year 2019),  Average Future Daily Traffic: 80 (year 2041),  Features Intersected: OLD SKUNK RIVER CHANNEL,  Facility Carried by Structure: 290TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.051,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 34.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $13,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 314085,  Location: 082231203 (Lat: 41.928339,  Lng: -93.469617),  Route carried "on" structure: County highway ,  Year Built: 1958,  Year Reconstructed: 2005,  Status: Posted for load,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 30 (year 2019),  Average Future Daily Traffic: 30 (year 2041),  Features Intersected: CALAMUS CREEK,  Facility Carried by Structure: 295TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.106,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $65,000,  Roadway Improvement Cost: $10,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 314101,  Location: 082231604 (Lat: 41.917550,  Lng: -93.540911),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 820 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 820 (year 2041),  Design Load: HS 20,  Features Intersected: UNION 118 WIRE LAKE OUTL,  Facility Carried by Structure: R70/580TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.610,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 314111,  Location: 082231604 (Lat: 41.908081,  Lng: -93.540767),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 820 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 820 (year 2041),  Design Load: HS 20,  Features Intersected: BALLARD CREEK,  Facility Carried by Structure: R70/580TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.559,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 314121,  Location: 570th Ave ov Ballard Cr (Lat: 41.908544,  Lng: -93.560628),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 110 (year 2019),  Average Future Daily Traffic: 110 (year 2041),  Design Load: HL 93,  Features Intersected: BALLARD CREEK,  Facility Carried by Structure: 570TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.030,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 314161,  Location: 082232203 (Lat: 41.903972,  Lng: -93.520606),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 9.17m (30.09ft),  Average Daily Traffic: 290 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 290 (year 2041),  Design Load: HS 20,  Features Intersected: SKUNK RIVER,  Facility Carried by Structure: 595TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.101,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31419,  Location: 082232206 (Lat: 41.897528,  Lng: -93.508550),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Closed,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 30 (year 2019),  Average Future Daily Traffic: 30 (year 2041),  Features Intersected: SMALL STREAM,  Facility Carried by Structure: 597TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.602,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $116,000,  Roadway Improvement Cost: $17,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 314195,  Location: 082232209 (Lat: 41.899331,  Lng: -93.507411),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 30 (year 2019),  Average Future Daily Traffic: 30 (year 2041),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: 315TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.835,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $108,000,  Roadway Improvement Cost: $16,000
Find on map >>   Show street view

Structure Number: 31421,  Location: 082232703 (Lat: 41.891956,  Lng: -93.516431),  Route carried "on" structure: County highway ,  Year Built: 1949,  Status: Posted for load,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 80 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 80 (year 2041),  Design Load: H 10,  Features Intersected: SKUNK RIVER,  Facility Carried by Structure: 320TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.499,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of replacement,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 21.80m (71.52ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Critical Feature Inspection Date: Febuary 2021,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $53,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 31422,  Location: 082232703 (Lat: 41.892194,  Lng: -93.521714),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1957,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 80 (year 2041),  Features Intersected: ROAD DITCH,  Facility Carried by Structure: FIELD ENTRANCE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.050,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $18,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 31481,  Location: 083233303 (Lat: 41.964981,  Lng: -93.536369),  Route carried "on" structure: County highway ,  Year Built: 1950,  Year Reconstructed: 1974,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 35 (year 2019),  Average Future Daily Traffic: 35 (year 2041),  Features Intersected: DRAINAGE,  Facility Carried by Structure: 270TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.146,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $11,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 362925,  Location: 083233302 (Lat: 41.957628,  Lng: -93.541064),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 820 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 820 (year 2041),  Design Load: HS 20,  Features Intersected: SMALL STREAM,  Facility Carried by Structure: 580TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.087,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Discuss Cambridge, Iowa (IA) on our hugely popular Iowa forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.