Bridge Statistics for Canaan, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 246ft / 74.9mTotal length
  • $60,334,000Total costs
  • 141,378Total average daily traffic
  • 16,411Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Canaan
  • No street view available for this location

New bridges in Canaan, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 131950-1959
  • 21980-1989
  • 42000-2009
  • 22010-2019
Average Bridge Daily Traffic in Canaan, NY
Average Bridge Truck Traffic in Canaan, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 21.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Excellent
  • 14.3%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Excellent
  • 28.6%Very good
  • 14.3%Good
  • 35.7%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 18.8%Good
  • 50.0%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 101686,  Location: JCT RTE 22+I90 INTC B3 (Lat: 42.358108,  Lng: -73.427303),  Route carried "on" structure: State highway 22,  Year Built: 1957,  Status: Open,  Structure Length: 15.73m (51.61ft),  Average Daily Traffic: 3,059 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,088 (year 2040),  Design Load: HS 20,  Features Intersected: 90IX WB, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.548,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.72m (51.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $9,653,000,  Roadway Improvement Cost: $5,653,000,  Total Project Cost: $15,305,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101687,  Location: 1.1 MI N JCT SH 22 & I90 (Lat: 42.373631,  Lng: -73.429939),  Route carried "on" structure: State highway 22,  Year Built: 2003,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 3,059 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,088 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: Flat Brook, CSX TRANSPOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.431,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.9m (150.6ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.19m (39.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $7,103,000,  Roadway Improvement Cost: $4,160,000,  Total Project Cost: $11,263,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 104512,  Location: 1 MI E JCT SH 295 & I90 (Lat: 42.415722,  Lng: -73.514103),  Route carried "on" structure: State highway 295,  Year Built: 1949,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,373 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,635 (year 2040),  Design Load: H 20,  Features Intersected: TRIBUTARY to STONY KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.670,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $565,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $896,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104513,  Location: 1.2 MI E JCT SH 295 & I90 (Lat: 42.418322,  Lng: -73.511047),  Route carried "on" structure: State highway 295,  Year Built: 2005,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 2,373 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,635 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSX TRANS/ AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.008,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.7m (136.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,745,000,  Roadway Improvement Cost: $1,607,000,  Total Project Cost: $4,352,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104514,  Location: 2.2 MI W JCT RTS295+22 (Lat: 42.411675,  Lng: -73.445758),  Route carried "on" structure: State highway 295,  Year Built: 1933,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,373 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,635 (year 2040),  Features Intersected: STONY KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.768,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $226,000,  Total Project Cost: $612,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105036,  Location: .8 MI E I90 INT B3 (Lat: 42.350053,  Lng: -73.414825),  Route carried "on" structure: State highway 980D,  Year Built: 2008,  Status: Open,  Structure Length: 9.78m (32.09ft),  Average Daily Traffic: 1,602 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,779 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 90IX WB, RTE I90, Flat B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 52.1m (170.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.78m (32.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $5,002,000,  Roadway Improvement Cost: $2,929,000,  Total Project Cost: $7,931,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222199,  Location: CANAAN (Lat: 42.411614,  Lng: -73.446733),  Route carried "on" structure: Other road ,  Year Built: 1981,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 74 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 104 (year 2035),  Design Load: HS 20,  Features Intersected: STONY KILL,  Facility Carried by Structure: OLD QUEECHY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 77.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $512,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22629,  Location: 1.0 MI SE OF EAST CHATHAM (Lat: 42.401350,  Lng: -73.508925),  Route carried "on" structure: Other road ,  Year Built: 1956,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 457 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 640 (year 2035),  Design Load: HS 20,  Features Intersected: FRISBEE CREEK,  Facility Carried by Structure: FRISBEE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.682,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.1m (16.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $110,000,  Total Project Cost: $299,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 226291,  Location: 1.7 MI SE OF EAST CHATHAM (Lat: 42.393242,  Lng: -73.497928),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 457 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 640 (year 2035),  Design Load: HS 20,  Features Intersected: FRISBEE CREEK,  Facility Carried by Structure: FRISBEE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.395,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $683,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 322197,  Location: AT EAST CHATHAM (Lat: 42.409594,  Lng: -73.522058),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 457 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 640 (year 2035),  Features Intersected: STONY KILL,  Facility Carried by Structure: FRISBEE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.082,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,092,000,  Roadway Improvement Cost: $639,000,  Total Project Cost: $1,731,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 322198,  Location: 1.6 MI W OF CANAAN (Lat: 42.417053,  Lng: -73.477394),  Route carried "on" structure: Other road ,  Year Built: 1947,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 85 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 119 (year 2040),  Features Intersected: STONY KILL,  Facility Carried by Structure: SCHILLNGS CROSSNG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $963,000,  Roadway Improvement Cost: $564,000,  Total Project Cost: $1,527,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334254,  Location: AT CANAAN (Lat: 42.411886,  Lng: -73.448631),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 515 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 721 (year 2040),  Design Load: HL 93,  Features Intersected: STONY KILL,  Facility Carried by Structure: COUNTY ROAD 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.685,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $493,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336516,  Location: 1.9 MI W OF FLATBROOK (Lat: 42.383775,  Lng: -73.464681),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 243 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 340 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: FRISBEE CREEK,  Facility Carried by Structure: COUNTY ROAD 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.974,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $269,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 337136,  Location: 1 MI NE CR9 (Lat: 42.356722,  Lng: -73.512814),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 226 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 316 (year 2039),  Design Load: HL 93,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: COUNTY ROAD 24
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.834,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $226,000,  Total Project Cost: $612,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55153,  Location: 1.7 MI SE OF EAST CHATHAM (Lat: 42.393400,  Lng: -73.500075),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 291 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 407 (year 2037),  Design Load: H 20,  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: SAYRE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.16m (26.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,847,000,  Roadway Improvement Cost: $1,667,000,  Total Project Cost: $4,514,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5515311,  Location: 1.6 MI.SW OF CANAAN (Lat: 42.389147,  Lng: -73.492375),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 11,122 (year 2014),  Truck Traffic: 20%,  Average Future Daily Traffic: 15,570 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: FRISBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1317.417,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $687,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $1,090,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5515312,  Location: 1.6 MI SW OF CANAAN (Lat: 42.388719,  Lng: -73.492214),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 8,372 (year 2020),  Truck Traffic: 41%,  Average Future Daily Traffic: 14,677 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: FRISBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.816,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $684,000,  Roadway Improvement Cost: $401,000,  Total Project Cost: $1,085,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551532,  Location: 2.6 M SW OF CANAAN (Lat: 42.388669,  Lng: -73.487294),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 16,744 (year 2020),  Truck Traffic: 41%,  Average Future Daily Traffic: 29,353 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: FRISBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $712,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $1,128,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551533,  Location: 2.1 M SW OF CANAAN (Lat: 42.385692,  Lng: -73.467744),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 11,122 (year 2014),  Truck Traffic: 20%,  Average Future Daily Traffic: 15,571 (year 2034),  Design Load: HS 20+Mod,  Features Intersected: FRISBEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1319.525,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $505,000,  Roadway Improvement Cost: $296,000,  Total Project Cost: $801,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 551534,  Location: 2.2 MI S OF CANAAN (Lat: 42.382853,  Lng: -73.466189),  Route carried "on" structure: County highway ,  Year Built: 1957,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 243 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 340 (year 2039),  Design Load: H 20,  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: CR5 RED ROCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.797,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.68m (28.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,299,000,  Roadway Improvement Cost: $1,932,000,  Total Project Cost: $5,231,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 101686,  Location: JCT RTE 22+I90 INTC B3 (Lat: 42.358108,  Lng: -73.427303),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1979),  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: RTE 22
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 1324.641,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 105036,  Location: .8 MI E I90 INT B3 (Lat: 42.350053,  Lng: -73.414825),  Route carried "under" structure: Spur Interstate 90,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 21,747 (year 2012),  Features Intersected: 90IX WB, RTE I90, Flat B,  Facility Carried by Structure: RTE 980D
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 1325.961,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: 55153,  Location: 1.7 MI SE OF EAST CHATHAM (Lat: 42.393400,  Lng: -73.500075),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 22,243 (year 2014),  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: SAYRE HILL ROAD
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 1316.580,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 551534,  Location: 2.2 MI S OF CANAAN (Lat: 42.382853,  Lng: -73.466189),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 22,141 (year 2015),  Features Intersected: 90IX, RTE I90,  Facility Carried by Structure: CR5 RED ROCK ROAD
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 1319.847,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)