Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Catlin, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 79ft / 24.3mTotal length
  • $13,072,000Total costs
  • 24,611Total average daily traffic
  • 2,292Total average daily truck traffic
  • 26,204Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Catlin
  • No street view available for this location

New bridges in Catlin, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 11970-1979
  • 41980-1989
  • 41990-1999
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Catlin, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Catlin, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Excellent
  • 18.2%Very good
  • 54.5%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.7%Excellent
  • 41.7%Very good
  • 8.3%Good
  • 8.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Excellent
  • 33.3%Very good
  • 25.0%Good
  • 8.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.8%Very good
  • 12.5%Good
  • 31.3%Satisfactory
  • 31.3%Fair
  • 6.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 104802,  Location: .2 MI NE SR 414 & CO LINE (Lat: 42.229031,  Lng: -76.963836),  Route carried "on" structure: State highway 414,  Year Built: 2004,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 4,387 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,414 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.0m (160.8ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,811,000,  Roadway Improvement Cost: $1,060,000,  Total Project Cost: $2,871,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104803,  Location: 0.3 MI NE SR414+ CO LINE (Lat: 42.230231,  Lng: -76.962264),  Route carried "on" structure: State highway 414,  Year Built: 2004,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 4,387 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,414 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: POST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,828,000,  Roadway Improvement Cost: $1,071,000,  Total Project Cost: $2,899,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104804,  Location: 0.9MI NE SR414 & CO LINE (Lat: 42.238828,  Lng: -76.957622),  Route carried "on" structure: State highway 414,  Year Built: 1994,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,387 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,414 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: EATON HOLLOW CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $681,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 107714,  Location: 2.5 MI NE JCT RT 414 & CN (Lat: 42.261061,  Lng: -76.956722),  Route carried "on" structure: State highway 414,  Year Built: 1994,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,387 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,414 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: EAST CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.910,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $457,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226846,  Location: 1 MILE NE OF POST CREEK (Lat: 42.239031,  Lng: -76.954875),  Route carried "on" structure: Other road ,  Year Built: 1974,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 189 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 265 (year 2038),  Features Intersected: EATON HOLLOW CRK,  Facility Carried by Structure: BACKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $435,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226847,  Location: 1 MILE NE OF POST CREEK (Lat: 42.239689,  Lng: -76.954386),  Route carried "on" structure: Other road ,  Year Built: 1980,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 189 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 265 (year 2038),  Features Intersected: EATON HOLLOW CRK,  Facility Carried by Structure: BACKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Fair,  Channel: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $435,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333099,  Location: 2.3 MI SW OF PINE VALLEY (Lat: 42.221364,  Lng: -76.883600),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 461 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 645 (year 2038),  Design Load: HS 20,  Features Intersected: SING SING CREEK,  Facility Carried by Structure: CR11 MURPHY HILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.011,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $532,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333123,  Location: 3.2 MI SW OF PINE VALLEY (Lat: 42.202433,  Lng: -76.889092),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 2,158 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,670 (year 2040),  Design Load: HS 20,  Features Intersected: MADISON CREEK,  Facility Carried by Structure: CR35 CHAMBERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.961,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $376,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $597,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333124,  Location: 3.0 MI SW OF PINE VALLEY (Lat: 42.206389,  Lng: -76.893364),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,384 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,443 (year 2040),  Design Load: HL 93,  Features Intersected: MADISON CREEK,  Facility Carried by Structure: CR35 CHAMBERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.652,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $411,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $651,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 333125,  Location: 2.9 MI SW OF PINE VALLEY (Lat: 42.210239,  Lng: -76.898428),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,384 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,443 (year 2040),  Design Load: HS 20,  Features Intersected: MADISON CREEK,  Facility Carried by Structure: CR35 CHAMBERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.264,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $384,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $609,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333126,  Location: 1.0 MI NE OF CHAMBERS (Lat: 42.268411,  Lng: -76.942569),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 507 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 710 (year 2038),  Features Intersected: EAST CREEK,  Facility Carried by Structure: CR35 CHAMBERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.465,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 5 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $310,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333162,  Location: 2.2 MI SW OF PINE VALLEY (Lat: 42.215994,  Lng: -76.883644),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 36 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 50 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: SING SING CREEK,  Facility Carried by Structure: MC FAIL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $663,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333163,  Location: 2.8 MI SW OF PINE VALLEY (Lat: 42.203364,  Lng: -76.886578),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 166 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 232 (year 2038),  Features Intersected: SING SING CREEK,  Facility Carried by Structure: MARY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 78.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $257,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $407,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333164,  Location: 3.1 MI SW OF PINE VALLEY (Lat: 42.215667,  Lng: -76.901439),  Route carried "on" structure: Other road ,  Year Built: 1946,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 277 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 388 (year 2038),  Features Intersected: MADISON CREEK,  Facility Carried by Structure: SAWDEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $437,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333167,  Location: IN CHAMBERS (Lat: 42.262031,  Lng: -76.958442),  Route carried "on" structure: Other road ,  Year Built: 1934,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 233 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 326 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: POST CREEK,  Facility Carried by Structure: CAMPGROUND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $476,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335779,  Location: 0.4 MI W OF PINE VALLEY (Lat: 42.229739,  Lng: -76.853039),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 0.73m (2.40ft),  Truck Traffic: 8%,  Features Intersected: TRIB CATHARINE CK,  Facility Carried by Structure: DUNN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.358,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $146,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337015,  Location: .4 MI WEST OF SH 414 (Lat: 42.264717,  Lng: -76.965556),  Route carried "on" structure: Other road ,  Year Built: 1950,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 79 (year 2020),  Average Future Daily Traffic: 111 (year 2040),  Features Intersected: TRIB. POST CREEK,  Facility Carried by Structure: CAMPGROUND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $172,000,  Total Project Cost: $466,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Catlin, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.