  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 269ft / 81.7mTotal length
  • $2,061,000Total costs
  • 7,732Total average daily traffic
  • 741Total average daily truck traffic
  • 11,555Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Centerville
  • No street view available for this location

New bridges in Centerville, SD - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 11940-1949
  • 61960-1969
  • 21980-1989
  • 51990-1999
  • 42000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Centerville, SD - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.3%Very good
  • 47.4%Good
  • 26.3%Satisfactory
  • 21.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.1%Very good
  • 10.5%Good
  • 63.2%Satisfactory
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.5%Very good
  • 36.8%Good
  • 36.8%Satisfactory
  • 5.3%Fair
  • 5.3%Poor
  • 5.3%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Excellent
  • 22.7%Very good
  • 31.8%Good
  • 13.6%Satisfactory
  • 18.2%Fair
  • 4.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 66.7%Good
Find on map >>   Show street view

Structure Number: 14100001,  Location: 0.1 S JCT SD 46 (Lat: 43.083103,  Lng: -96.963444),  Route carried "on" structure: State highway 19,  Year Built: 2004,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 759 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,246 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: VERMILLION RV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.636,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.3m (53.5ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 72.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14100018,  Location: 1.9 S JCT SD 46 (Lat: 43.057678,  Lng: -96.963731),  Route carried "on" structure: State highway 19,  Year Built: 2004,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 759 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,246 (year 2041),  Design Load: HL 93,  Features Intersected: VERMILLION RV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.820,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 58.2m (190.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14102,  Location: 0.2 E JCT SD 19 S (Lat: 43.083550,  Lng: -96.961672),  Route carried "on" structure: State highway 46,  Year Built: 2020,  Status: Open,  Structure Length: 6.02m (19.75ft),  Average Daily Traffic: 2,660 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,365 (year 2041),  Design Load: HL 93,  Features Intersected: VERMILLION RV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 574.037,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.0m (42.7ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1410801,  Location: 1S & 10.8E IRENE (Lat: 43.069564,  Lng: -96.946464),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 25 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 29 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BLIND CK,  Facility Carried by Structure: 46280 298 ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: 1411002,  Location: 2 S & 11 E IRENE (Lat: 43.054683,  Lng: -96.943764),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 97 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ASH CK,  Facility Carried by Structure: TOWNSHIP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 46.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: 42000274,  Location: 7W & 1.6N of Beresford (Lat: 43.108522,  Lng: -96.924011),  Route carried "on" structure: County highway ,  Year Built: 1941,  Year Reconstructed: 1968,  Status: Posted for load,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 80 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 41 (year 2032),  Features Intersected: Blind Creek,  Facility Carried by Structure: 464th Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 23.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,635,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $1,665,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4200423,  Location: 4N & 2.3E of Centerville (Lat: 43.170806,  Lng: -96.916517),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 278 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 278 (year 2032),  Design Load: H 15,  Features Intersected: Trib. to Vermillion Rvr,  Facility Carried by Structure: 291st Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.0m (26.2ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4200427,  Location: 2N & 6.7W of Beresford (Lat: 43.112728,  Lng: -96.915697),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 63 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 63 (year 2032),  Design Load: HL 93,  Features Intersected: Blind Creek,  Facility Carried by Structure: 295th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 42010265,  Location: 6W & 2.5N BERESFORD (Lat: 43.120678,  Lng: -96.904681),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Closed,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 35 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 35 (year 2032),  Features Intersected: BLIND CK,  Facility Carried by Structure: 465TH AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Critical,  Channel: Good,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2006,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $189,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 6318627,  Location: 2.7 E JCT SD 19 (Lat: 43.111967,  Lng: -97.030353),  Route carried "on" structure: Alternate State highway 19,  Year Built: 1968,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 321 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 537 (year 2041),  Design Load: HS 20,  Features Intersected: CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.713,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 6319325,  Location: 2S & 3.3E VIBORG (Lat: 43.141333,  Lng: -97.015483),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 25 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 25 (year 2032),  Features Intersected: TURKEY RIDGE CK,  Facility Carried by Structure: 45930 293RD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $23,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6319726,  Location: 2.3W CENTERVILLE (Lat: 43.126667,  Lng: -97.005883),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 97 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 97 (year 2032),  Features Intersected: TURKEY RIDGE CK,  Facility Carried by Structure: 45970 294TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $23,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 63200261,  Location: 2W & 0.9N CENTERVILLE (Lat: 43.124900,  Lng: -97.001642),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 97 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 97 (year 2032),  Design Load: HS 20,  Features Intersected: TURKEY RIDGE CK,  Facility Carried by Structure: 29410 460 AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $23,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6320326,  Location: 1.7W CENTERVILLE (Lat: 43.126628,  Lng: -96.997056),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 97 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 97 (year 2032),  Features Intersected: TURKEY RIDGE CK,  Facility Carried by Structure: 46030 294TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $23,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6320427,  Location: 4.6 E JCT SD 19 (Lat: 43.111761,  Lng: -96.992131),  Route carried "on" structure: Alternate State highway 19,  Year Built: 1968,  Status: Open,  Structure Length: 5.32m (17.45ft),  Average Daily Traffic: 321 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 537 (year 2041),  Design Load: HS 20,  Features Intersected: TURKEY RIDGE CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.591,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.8m (35.4ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 6320526,  Location: 1.5W CENTERVILLE (Lat: 43.126564,  Lng: -96.988086),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 97 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 97 (year 2032),  Features Intersected: TURKEY RIDGE CK,  Facility Carried by Structure: 46050 294TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $23,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 6321027,  Location: 5.2 E JCT SD 19 (Lat: 43.112006,  Lng: -96.981239),  Route carried "on" structure: Alternate State highway 19,  Year Built: 1968,  Status: Open,  Structure Length: 6.72m (22.05ft),  Average Daily Traffic: 321 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 537 (year 2041),  Design Load: HS 20,  Features Intersected: VERMILLION RV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.705,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 63210282,  Location: 1W & 1.2S CENTERVILLE (Lat: 43.095986,  Lng: -96.981647),  Route carried "on" structure: County highway ,  Year Built: 1910,  Year Reconstructed: 2009,  Status: Posted for load,  Structure Length: 5.26m (17.26ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 50 (year 2032),  Features Intersected: VERMILLION RV,  Facility Carried by Structure: COUNTY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 28.2m (92.5ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 13.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 8.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $23,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 63218262,  Location: 0.7N & 0.2W CENTERVILLE (Lat: 43.123078,  Lng: -96.965731),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 484 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 484 (year 2032),  Design Load: HS 20,  Features Intersected: VERMILLION RV,  Facility Carried by Structure: COUNTY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 13.0m (42.7ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 62.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $23,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 63220288,  Location: 0.3 N JCT SD 46 (Lat: 43.088900,  Lng: -96.962675),  Route carried "on" structure: Alternate State highway 19,  Year Built: 1968,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 690 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,154 (year 2041),  Design Load: HS 20,  Features Intersected: VERMILLION RV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.280,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 63225241,  Location: 1.9N CENTERVILLE (Lat: 43.155036,  Lng: -96.954014),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 160 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 160 (year 2032),  Design Load: HS 20,  Features Intersected: VERMILLION RV,  Facility Carried by Structure: COUNTY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.3m (128.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 90.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $23,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6323523,  Location: 4N & 1.5E CENTERVILLE (Lat: 43.170781,  Lng: -96.931797),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 6.38m (20.93ft),  Average Daily Traffic: 283 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 283 (year 2032),  Design Load: H 20,  Features Intersected: VERMILLION RV,  Facility Carried by Structure: 46350 291 ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $23,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Centerville, South Dakota (SD) on our hugely popular South Dakota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.