Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Chestnut Ridge, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 203ft / 62.1mTotal length
  • $44,495,000Total costs
  • 339,364Total average daily traffic
  • 15,110Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Chestnut Ridge
  • No street view available for this location

New bridges in Chestnut Ridge, NY - historical statistics
  • New bridges - historical statistics
  • 161950-1959
  • 11960-1969
  • 32020-2022
Average Bridge Daily Traffic in Chestnut Ridge, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Excellent
  • 9.1%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Excellent
  • 18.2%Good
  • 45.5%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Excellent
  • 9.1%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 27.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Satisfactory
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 322416,  Location: 6.2 MI SW OF NYACK (Lat: 41.083514,  Lng: -74.041653),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 606 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 848 (year 2038),  Features Intersected: PASCACK BROOK,  Facility Carried by Structure: LILLIAN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $863,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334619,  Location: 3.4 MI S OF SPRING VALLEY (Lat: 41.067469,  Lng: -74.039528),  Route carried "on" structure: County highway ,  Year Built: 1950,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,572 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,124 (year 2040),  Features Intersected: PASCACK BROOK,  Facility Carried by Structure: PASCACK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.558,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 24.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,375,000,  Roadway Improvement Cost: $805,000,  Total Project Cost: $2,180,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33462,  Location: 6.5 MI NW OF SPARKILL (Lat: 41.071869,  Lng: -74.044564),  Route carried "on" structure: Other road ,  Year Built: 1958,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,317 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,844 (year 2038),  Features Intersected: PASCACK BROOK,  Facility Carried by Structure: GROTKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.9m (12.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $345,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $548,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 5025629,  Location: JCT OF RTS I87 & 45 (Lat: 41.096825,  Lng: -74.047883),  Route carried "on" structure: Interstate 87,  Year Built: 1953,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 80,527 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 136,364 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 45
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.674,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 33.8m (110.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 32.9m (107.9ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $5,812,000,  Roadway Improvement Cost: $3,404,000,  Total Project Cost: $9,216,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5513981,  Location: 1.8 MI SOUTH OF I-287 (Lat: 41.076056,  Lng: -74.050611),  Route carried "on" structure: Other road 982,  Year Built: 1956,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 24,193 (year 2012),  Truck Traffic: 2%,  Average Future Daily Traffic: 34,128 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: WILLIAMS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,543,000,  Roadway Improvement Cost: $904,000,  Total Project Cost: $2,447,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5513982,  Location: 1.6 MI S OF I-287 (Lat: 41.076150,  Lng: -74.050969),  Route carried "on" structure: Other road 982,  Year Built: 1956,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 24,193 (year 2012),  Truck Traffic: 2%,  Average Future Daily Traffic: 34,128 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: WILLIAMS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,442,000,  Roadway Improvement Cost: $845,000,  Total Project Cost: $2,287,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5514021,  Location: 2.0 MI S OF I-287 & GSP (Lat: 41.069947,  Lng: -74.053581),  Route carried "on" structure: State highway 982,  Year Built: 1956,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 24,193 (year 2012),  Truck Traffic: 2%,  Average Future Daily Traffic: 34,128 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CR-41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,326,000,  Roadway Improvement Cost: $1,947,000,  Total Project Cost: $5,273,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5514022,  Location: 2.0 MI S OF I-287 & GSP (Lat: 41.070594,  Lng: -74.053658),  Route carried "on" structure: State highway 982,  Year Built: 1956,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 24,193 (year 2012),  Truck Traffic: 2%,  Average Future Daily Traffic: 34,128 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CR-41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 84.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.74m (28.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,326,000,  Roadway Improvement Cost: $1,948,000,  Total Project Cost: $5,274,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5514049,  Location: JCT RTS GARDEN ST PKW+I87 (Lat: 41.097644,  Lng: -74.040378),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 4,248 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,193 (year 2040),  Design Load: HS 20,  Features Intersected: 87IX NB, RTE I87,  Facility Carried by Structure: GARDEN STATE PKWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 3,  Lanes under structure: 7,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 83.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.95m (26.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,559,000,  Roadway Improvement Cost: $2,670,000,  Total Project Cost: $7,229,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551405,  Location: 0.3 MI E JCT RTS I87<45 (Lat: 41.097256,  Lng: -74.042011),  Route carried "on" structure: Other road ,  Year Built: 2021,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 4,393 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,435 (year 2040),  Design Load: HL 93,  Features Intersected: 87IX SB, EXIT 14A RAMP S,  Facility Carried by Structure: SCOTLAND HILL RD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.837,  Lanes on structure: 3,  Lanes under structure: 7,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 551406,  Location: 0.7MI W JCT RTS I87 NYS45 (Lat: 41.099847,  Lng: -74.060628),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 2,780 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,439 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: I-87 NB, RTE I87,  Facility Carried by Structure: Hungry Hollow Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.269,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,294,000,  Roadway Improvement Cost: $1,929,000,  Total Project Cost: $5,223,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 551442,  Location: 1.6 MI S OF SPRING VALLEY (Lat: 41.091989,  Lng: -74.039511),  Route carried "on" structure: Other road ,  Year Built: 1956,  Status: Open,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 4,393 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,435 (year 2040),  Design Load: HS 20,  Features Intersected: GSP NB CONN TO I-87N, GS,  Facility Carried by Structure: SCOTLAND HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,494,000,  Roadway Improvement Cost: $1,461,000,  Total Project Cost: $3,955,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5025629,  Location: JCT OF RTS I87 & 45 (Lat: 41.096825,  Lng: -74.047883),  Route carried "under" structure: State highway 45,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 8,424 (year 2003),  Features Intersected: RTE 45,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 41.223,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 5513981,  Location: 1.8 MI SOUTH OF I-287 (Lat: 41.076056,  Lng: -74.050611),  Route carried "under" structure: Other road ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 1,373 (year 2016),  Truck Traffic: 6%,  Features Intersected: WILLIAMS ROAD,  Facility Carried by Structure: RTE 982
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 5513982,  Location: 1.6 MI S OF I-287 (Lat: 41.076150,  Lng: -74.050969),  Route carried "under" structure: Other road ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 1,373 (year 2016),  Truck Traffic: 6%,  Features Intersected: WILLIAMS ROAD,  Facility Carried by Structure: RTE 982
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 5514021,  Location: 2.0 MI S OF I-287 & GSP (Lat: 41.069947,  Lng: -74.053581),  Route carried "under" structure: Other road ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 5,143 (year 2015),  Truck Traffic: 4%,  Features Intersected: CR-41,  Facility Carried by Structure: RTE 982
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 5514022,  Location: 2.0 MI S OF I-287 & GSP (Lat: 41.070594,  Lng: -74.053658),  Route carried "under" structure: Other road ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 5,143 (year 2015),  Truck Traffic: 4%,  Features Intersected: CR-41,  Facility Carried by Structure: RTE 982
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 5514049,  Location: JCT RTS GARDEN ST PKW+I87 (Lat: 41.097644,  Lng: -74.040378),  Route carried "under" structure: Interstate 87,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2021),  Features Intersected: 87IX NB, RTE I87,  Facility Carried by Structure: GARDEN STATE PKWY
Minimum Vertical Clearance: 7.26m (23.82ft),  Kilometerpoint: 37.860,  Lanes on structure: 3,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 551406,  Location: 0.7MI W JCT RTS I87 NYS45 (Lat: 41.099847,  Lng: -74.060628),  Route carried "under" structure: Interstate 87,  Year Built: 2020,  Structure Length: 0. m,  Average Daily Traffic: 105,300 (year 2003),  Features Intersected: I-87 NB, RTE I87,  Facility Carried by Structure: Hungry Hollow Road
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 39.614,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 551442,  Location: 1.6 MI S OF SPRING VALLEY (Lat: 41.091989,  Lng: -74.039511),  Route carried "under" structure: Other road ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2021),  Features Intersected: GSP NB CONN TO I-87N, GS,  Facility Carried by Structure: SCOTLAND HILL RD
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 1030.371,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Discuss Chestnut Ridge, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.