Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Clarion, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 302ft / 92.0mTotal length
  • $5,627,000Total costs
  • 157,421Total average daily traffic
  • 44,949Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clarion
  • No street view available for this location

New bridges in Clarion, PA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 131960-1969
  • 32000-2009
  • 22010-2019
Reconstructed bridges in Clarion, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Clarion, PA
Average Bridge Truck Traffic in Clarion, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 54.5%Good
  • 27.3%Satisfactory
  • 9.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 27.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.2%Very good
  • 18.2%Good
  • 54.5%Satisfactory
  • 9.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 55.6%Fair
Find on map >>   Show street view

Structure Number: 10917,  Location: GREENVILLE PIKE NO.2 (Lat: 41.177758,  Lng: -79.350036),  Route carried "on" structure: State highway 66,  Year Built: 1965,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 6,478 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,526 (year 2032),  Design Load: HS 20,  Features Intersected: SR0080 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.818,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 23 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 22.4m (73.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $36,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $488,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10928,  Location: CLARION OAKS (Lat: 41.185744,  Lng: -79.394294),  Route carried "on" structure: State highway 68,  Year Built: 1966,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 10.15m (33.30ft),  Average Daily Traffic: 9,010 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 16,092 (year 2032),  Design Load: HL 93,  Features Intersected: SR0080 EB&WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.829,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.10m (33.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $1,740,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10951,  Location: CLARION RIVER (Lat: 41.189361,  Lng: -79.417456),  Route carried "on" structure: Interstate 80,  Year Built: 1965,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 49.83m (163.48ft),  Average Daily Traffic: 30,064 (year 2021),  Truck Traffic: 27%,  Average Future Daily Traffic: 29,853 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CLARION RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.972,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 186.5m (611.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.8m (61.7ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 50.60m (166.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $520,000,  Total Project Cost: $2,385,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10952,  Location: LONESOME EB (Lat: 41.177589,  Lng: -79.367447),  Route carried "on" structure: Interstate 80,  Year Built: 1965,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 14,111 (year 2021),  Truck Traffic: 32%,  Average Future Daily Traffic: 13,702 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR1009 & BRUSH RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.774,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $59,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $798,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 10953,  Location: LONESOME WB (Lat: 41.178297,  Lng: -79.367392),  Route carried "on" structure: Interstate 80,  Year Built: 1965,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 17,980 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,680 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR1009
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.780,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.00m (16.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 11052,  Location: RAPP ROAD (Lat: 41.145444,  Lng: -79.363539),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 72 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 539 (year 2032),  Design Load: HS 20,  Features Intersected: PINEY CREEK,  Facility Carried by Structure: SR2012
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.470,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11133,  Location: 1.6 Mi. WNW of LIMESTONE (Lat: 41.138936,  Lng: -79.354442),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 77 (year 2043),  Features Intersected: PINEY CREEK,  Facility Carried by Structure: T-444 CURLL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 10.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $216,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 40938,  Location: WILLIAMSBURG (Lat: 41.172931,  Lng: -79.399464),  Route carried "on" structure: State highway 68,  Year Built: 2000,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 3,962 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,546 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: BRUSH RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.570,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019
Find on map >>   Show street view

Structure Number: 43458,  Location: 1.6 mi E, int. w/ SR 66 (Lat: 41.258117,  Lng: -79.368108),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 70 (year 2043),  Design Load: HL 93,  Features Intersected: TOBY CREEK,  Facility Carried by Structure: T-577 KINBAHE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 44219,  Location: 0.35 mi N, int. w/ SR1005 (Lat: 41.234903,  Lng: -79.384347),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 60 (year 2041),  Design Load: HL 93,  Features Intersected: TOBY CREEK,  Facility Carried by Structure: T-576 BIGLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 47482,  Location: 250ft. S I-80 EB (Lat: 41.177075,  Lng: -79.367878),  Route carried "on" structure: State highway ,  Year Built: 2012,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 454 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 703 (year 2032),  Design Load: HL 93,  Features Intersected: BRUSH RUN,  Facility Carried by Structure: SR 1009
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.270,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5697,  Location: 0.2 mi S SR 2003 Intersec (Lat: 41.147111,  Lng: -79.402306),  Route carried "on" structure: State highway 68,  Year Built: 2019,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 3,222 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,818 (year 2032),  Design Load: HL 93,  Features Intersected: Reids Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.036,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10917,  Location: GREENVILLE PIKE NO.2 (Lat: 41.177758,  Lng: -79.350036),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 12,200 (year 2022),  Truck Traffic: 43%,  Features Intersected: SR0080 WB,  Facility Carried by Structure: SR0066 NB&SB
Minimum Vertical Clearance: 5.62m (18.44ft),  Kilometerpoint: 32.383,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 10928,  Location: CLARION OAKS (Lat: 41.185744,  Lng: -79.394294),  Route carried "under" structure: Interstate 80,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 14,111 (year 2021),  Truck Traffic: 32%,  Features Intersected: SR0080 EB&WB,  Facility Carried by Structure: SR0068 EB&WB
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 28.345,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 10928,  Location: CLARION OAKS (Lat: 41.185744,  Lng: -79.394294),  Route carried "under" structure: Interstate 80,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 17,980 (year 2021),  Truck Traffic: 25%,  Features Intersected: SR0080 EB&WB,  Facility Carried by Structure: SR0068 EB&WB
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 28.384,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 10952,  Location: LONESOME EB (Lat: 41.177589,  Lng: -79.367447),  Route carried "under" structure: State highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 454 (year 2021),  Truck Traffic: 4%,  Features Intersected: SR1009 & BRUSH RUN,  Facility Carried by Structure: SR0080 EB
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 3.270,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 10953,  Location: LONESOME WB (Lat: 41.178297,  Lng: -79.367392),  Route carried "under" structure: State highway ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 454 (year 2021),  Truck Traffic: 4%,  Features Intersected: SR1009,  Facility Carried by Structure: SR0080 WB
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 3.270,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 11185,  Location: PAINT BOULEVARD (Lat: 41.192461,  Lng: -79.426469),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 14,791 (year 2021),  Truck Traffic: 30%,  Features Intersected: SR0080 EB&WB
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 25.214,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 11185,  Location: PAINT BOULEVARD (Lat: 41.192461,  Lng: -79.426469),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 11,928 (year 2022),  Truck Traffic: 65%,  Features Intersected: SR0080 EB&WB
Minimum Vertical Clearance: 5.50m (18.04ft),  Kilometerpoint: 25.160,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.8m (65.0ft)

Discuss Clarion, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.