Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Clintonville, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 171ft / 51.9mTotal length
  • $4,137,000Total costs
  • 94,680Total average daily traffic
  • 29,919Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clintonville
  • No street view available for this location

New bridges in Clintonville, PA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 161960-1969
  • 11990-1999
  • 32010-2019
Reconstructed bridges in Clintonville, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Clintonville, PA
Average Bridge Truck Traffic in Clintonville, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Excellent
  • 20.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Excellent
  • 10.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Excellent
  • 10.0%Very good
  • 40.0%Good
  • 20.0%Fair
  • 20.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Good
  • 50.0%Satisfactory
  • 37.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 3371,  Location: 100ft East of Rt 66 (Lat: 40.661944,  Lng: -79.605908),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 560 (year 2039),  Features Intersected: ELDER RUN,  Facility Carried by Structure: T-413 FIREHALL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18191,  Location: FRANKLIN TOWNSHIP (Lat: 39.934447,  Lng: -80.167450),  Route carried "on" structure: State highway ,  Year Built: 1966,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 268 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 460 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 0079,  Facility Carried by Structure: SR 1003
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 4.968,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.70m (28.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3371,  Location: CLINTONVILLE BOROUGH (Lat: 41.196028,  Lng: -79.885369),  Route carried "on" structure: Interstate 80,  Year Built: 1965,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 17,285 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 46,232 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER SCRUBGRASS CK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.292,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 40.2m (131.9ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019
Find on map >>   Show street view

Structure Number: 33711,  Location: CLINTONVILLE BOROUGH (Lat: 41.180000,  Lng: -79.881667),  Route carried "on" structure: State highway ,  Year Built: 1965,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 141 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 225 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 3101,PORTER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $24,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $329,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 33712,  Location: CLINTON TOWNSHIP (Lat: 41.192283,  Lng: -79.844206),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 7,669 (year 2020),  Truck Traffic: 40%,  Average Future Daily Traffic: 15,357 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER T-388,COAL VALLEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.350,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 33713,  Location: SCRUBGRASS TOWNSHIP (Lat: 41.192600,  Lng: -79.844197),  Route carried "on" structure: Interstate 80,  Year Built: 1966,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 9,634 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 17,147 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OVER T-388,COAL VALLEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.317,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33726,  Location: CLINTON TOWNSHIP (Lat: 41.198936,  Lng: -79.901064),  Route carried "on" structure: State highway 208,  Year Built: 1965,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 1,304 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,866 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 80,EB/WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.134,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.70m (41.67ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $106,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $1,428,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 33727,  Location: CLINTONVILLE BOROUGH (Lat: 41.199000,  Lng: -79.883725),  Route carried "on" structure: State highway 208,  Year Built: 1933,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 1,304 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,866 (year 2032),  Design Load: HS 20,  Features Intersected: OVER LITTLE SCRUBGRASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.999,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $99,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 33739,  Location: CLINTON TOWNSHIP (Lat: 41.189792,  Lng: -79.868931),  Route carried "on" structure: State highway 308,  Year Built: 1965,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 1,819 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,987 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SR 80,EB/WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.616,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $564,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3374,  Location: CLINTON TOWNSHIP (Lat: 41.210672,  Lng: -79.880061),  Route carried "on" structure: State highway 308,  Year Built: 1968,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,068 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,589 (year 2032),  Design Load: HS 20,  Features Intersected: OVER SCRUBGRASS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.911,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $1,483,000
Find on map >>   Show street view

Structure Number: 33869,  Location: CLINTON TOWNSHIP (Lat: 41.228283,  Lng: -79.858506),  Route carried "on" structure: City street 7204,  Year Built: 1915,  Status: Posted for load,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 50 (year 2015),  Average Future Daily Traffic: 70 (year 2035),  Design Load: H 15,  Features Intersected: OVER BR. SCRUBGRASS CK.,  Facility Carried by Structure: T-380,PHIPPS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 2.7m (8.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 19.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 48018,  Location: 1.1 MI W SR 308 Inter. (Lat: 41.140669,  Lng: -79.905181),  Route carried "on" structure: State highway 58,  Year Built: 2013,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 734 (year 2022),  Truck Traffic: 19%,  Average Future Daily Traffic: 919 (year 2032),  Design Load: HL 93,  Features Intersected: TRIB TO BLACKS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.752,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48066,  Location: 0.5 MI E SR 308 INTER. (Lat: 41.142642,  Lng: -79.874386),  Route carried "on" structure: State highway 58,  Year Built: 2013,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 860 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,235 (year 2032),  Design Load: HL 93,  Features Intersected: MURRIN RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.676,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2019,  Underwater Inspection Date: September 2018,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 57094,  Location: ATHENS TOWNSHIP (Lat: 41.250556,  Lng: -79.897667),  Route carried "on" structure: State highway ,  Year Built: 2019,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 173 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 211 (year 2039),  Design Load: HL 93,  Features Intersected: OVER FEDERAL RUN,  Facility Carried by Structure: SR 1007,BROWN HILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.941,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33711,  Location: CLINTONVILLE BOROUGH (Lat: 41.180000,  Lng: -79.881667),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,507 (year 2020),  Truck Traffic: 40%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 3101,PORTER RD
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 10.081,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 33711,  Location: CLINTONVILLE BOROUGH (Lat: 41.180000,  Lng: -79.881667),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,778 (year 2020),  Truck Traffic: 20%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 3101,PORTER RD
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 10.124,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 33712,  Location: CLINTON TOWNSHIP (Lat: 41.192283,  Lng: -79.844206),  Route carried "under" structure: City street T388,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 49 (year 2003),  Truck Traffic: 49%,  Features Intersected: OVER T-388,COAL VALLEY,  Facility Carried by Structure: SR 80,EB
Minimum Vertical Clearance: 4.38m (14.37ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 10.4m (34.1ft)

Find on map >>   Show street view

Structure Number: 33713,  Location: SCRUBGRASS TOWNSHIP (Lat: 41.192600,  Lng: -79.844197),  Route carried "under" structure: City street T388,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 49 (year 2003),  Features Intersected: OVER T-388,COAL VALLEY,  Facility Carried by Structure: SR 80,WB
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 10.4m (34.1ft)

Find on map >>   Show street view

Structure Number: 33726,  Location: CLINTON TOWNSHIP (Lat: 41.198936,  Lng: -79.901064),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,778 (year 2020),  Truck Traffic: 20%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 208
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 8.462,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 33726,  Location: CLINTON TOWNSHIP (Lat: 41.198936,  Lng: -79.901064),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 8,507 (year 2020),  Truck Traffic: 40%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 208
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 7.688,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 33739,  Location: CLINTON TOWNSHIP (Lat: 41.189792,  Lng: -79.868931),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 7,669 (year 2020),  Truck Traffic: 40%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 308
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 10.911,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 33739,  Location: CLINTON TOWNSHIP (Lat: 41.189792,  Lng: -79.868931),  Route carried "under" structure: Interstate 80,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 9,634 (year 2020),  Truck Traffic: 38%,  Features Intersected: OVER SR 80,EB/WB,  Facility Carried by Structure: SR 308
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 10.887,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Discuss Clintonville, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.