  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 226ft / 68.9mTotal length
  • $47,230,000Total costs
  • 75,644Total average daily traffic
  • 11,248Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Colfax
  • No street view available for this location

New bridges in Colfax, WA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 41920-1929
  • 61930-1939
  • 11950-1959
  • 61960-1969
  • 51970-1979
  • 31990-1999
  • 12000-2009
Reconstructed bridges in Colfax, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
Average Bridge Daily Traffic in Colfax, WA
Average Bridge Truck Traffic in Colfax, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.8%Very good
  • 28.6%Good
  • 42.9%Satisfactory
  • 19.0%Fair
  • 4.8%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.8%Very good
  • 23.8%Good
  • 38.1%Satisfactory
  • 23.8%Fair
  • 9.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.8%Very good
  • 33.3%Good
  • 38.1%Satisfactory
  • 19.0%Fair
  • 4.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 76.9%Very good
  • 15.4%Good
  • 3.8%Satisfactory
  • 3.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 60.0%Good
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: BI,  Location: 0.3 N JCT SR 272 (Lat: 46.884000,  Lng: -117.364536),  Route carried "on" structure: US 195,  Year Built: 1923,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 9,894 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,081 (year 2039),  Features Intersected: S FK PALOUSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.300,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 7 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 24.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.95m (22.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,645,000,  Roadway Improvement Cost: $529,000,  Total Project Cost: $5,290,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: GR,  Location: 15.1 N JCT SR 270 (Lat: 46.874611,  Lng: -117.365000),  Route carried "on" structure: US 195,  Year Built: 1920,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 9,087 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 10,177 (year 2039),  Features Intersected: SPRING FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.286,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 4.0m (13.1ft),  Right: 3.4m (11.2ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $858,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1542A,  Location: 0.7 N JCT SR 272 (Lat: 46.889953,  Lng: -117.364139),  Route carried "on" structure: US 195,  Year Built: 1931,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 6,923 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 7,753 (year 2039),  Design Load: H 15,  Features Intersected: PALOUSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.960,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,728,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $3,456,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1869A,  Location: 15.2 N JCT SR 270 (Lat: 46.876167,  Lng: -117.364972),  Route carried "on" structure: US 195,  Year Built: 1934,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 9,955 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,149 (year 2039),  Design Load: H 15,  Features Intersected: S FK PALOUSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.431,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.44m (11.29ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $1,311,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $2,622,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1869B,  Location: 0.5 N JCT SR 272 (Lat: 46.886556,  Lng: -117.364417),  Route carried "on" structure: US 195,  Year Built: 1934,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 9,894 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,081 (year 2039),  Design Load: H 15,  Features Intersected: S FK PALOUSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.606,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $1,195,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,390,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 2293A,  Location: 16.1 E JCT SR 127 (Lat: 46.890861,  Lng: -117.375556),  Route carried "on" structure: State highway 26,  Year Built: 1937,  Status: Open,  Structure Length: 18.38m (60.30ft),  Average Daily Traffic: 3,103 (year 2019),  Truck Traffic: 30%,  Average Future Daily Traffic: 3,475 (year 2039),  Design Load: H 15,  Features Intersected: PALOUSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 213.946,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Serious,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.38m (60.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,859,000,  Roadway Improvement Cost: $772,000,  Total Project Cost: $7,718,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 2385B,  Location: JCT US 195 (Lat: 46.890153,  Lng: -117.364594),  Route carried "on" structure: Spur State highway 26,  Year Built: 1938,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 3,173 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 3,553 (year 2039),  Design Load: H 15,  Features Intersected: PALOUSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 214.799,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Very good,  Operating Rating: 22.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $730,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $1,459,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4592A,  Location: 5.6 N JCT SR 26 (Lat: 46.962472,  Lng: -117.328306),  Route carried "on" structure: US 195,  Year Built: 1954,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 5,385 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 6,031 (year 2039),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.197,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $296,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $592,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 10381A,  Location: 12.7 E JCT SR 127 (Lat: 46.864806,  Lng: -117.431306),  Route carried "on" structure: State highway 26,  Year Built: 1977,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 3,044 (year 2019),  Truck Traffic: 30%,  Average Future Daily Traffic: 3,409 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: REBEL FLAT CR,  Facility Carried by Structure: SR 127
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 208.507,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $504,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 14704A,  Location: 5.3 E JCT US 195 (Lat: 46.912311,  Lng: -117.270322),  Route carried "on" structure: State highway 272,  Year Built: 1995,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 663 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 742 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CLEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.417,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $320,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 200308,  Location: 12.9 N JCT SR 270 (Lat: 46.853056,  Lng: -117.342750),  Route carried "on" structure: US 195,  Year Built: 1960,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 8,124 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 9,098 (year 2039),  Design Load: HS 15,  Features Intersected: SPRING FLAT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.729,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $220,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $440,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 80632,  Location: 27.79 MI E ADAMS CNTY LNE (Lat: 46.890350,  Lng: -117.447667),  Route carried "on" structure: County highway 40000,  Year Built: 1920,  Year Reconstructed: 1961,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 672 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 672 (year 2039),  Design Load: HS 15,  Features Intersected: REBEL FLAT CREEK,  Facility Carried by Structure: ENDICOTT/4000
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 18.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $638,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,277,000 ( Estimate for 2014),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80864,  Location: 0.07 MI E DRY CREEK (Lat: 46.982467,  Lng: -117.268883),  Route carried "on" structure: County highway 24000,  Year Built: 1974,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 160 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 160 (year 2039),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: ELBERTON/2400
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $714,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $1,429,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8224,  Location: 0.04 MI S DRY CREEK (Lat: 46.964850,  Lng: -117.288367),  Route carried "on" structure: County highway 24500,  Year Built: 1967,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 90 (year 2021),  Truck Traffic: 35%,  Average Future Daily Traffic: 111 (year 2039),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: GLENWOOD/2450
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 39.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $669,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $1,338,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 82296,  Location: 0.09 MI S DRY CREEK (Lat: 46.966567,  Lng: -117.299683),  Route carried "on" structure: County highway 24650,  Year Built: 1965,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 21 (year 2039),  Design Load: H 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: SUESS/2465
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,246,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 82297,  Location: 0.11 MI W ENDICOTT (Lat: 46.877600,  Lng: -117.444500),  Route carried "on" structure: County highway 62400,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 272 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 277 (year 2039),  Design Load: H 20,  Features Intersected: REBEL FLAT CREEK,  Facility Carried by Structure: MCNEILLY/6240
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 33.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,064,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82639,  Location: 0.10 MI S ENDICOTT (Lat: 46.869650,  Lng: -117.436583),  Route carried "on" structure: County highway 62900,  Year Built: 1917,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 430 (year 2021),  Truck Traffic: 17%,  Average Future Daily Traffic: 475 (year 2041),  Features Intersected: REBEL FLAT CREEK,  Facility Carried by Structure: FAIRGROUNDS/6290
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $300,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83062,  Location: 0.04 MI W DANAHER (Lat: 46.951850,  Lng: -117.347983),  Route carried "on" structure: County highway 44600,  Year Built: 1977,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 14 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 14 (year 2038),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: BIXLER/4460
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,520,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 83086,  Location: 3.08 MI SE BLACKWELL (Lat: 46.951367,  Lng: -117.344033),  Route carried "on" structure: County highway 44500,  Year Built: 1977,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 347 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 347 (year 2038),  Design Load: H 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: DANAHER/4450
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 11.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,520,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 84359,  Location: 2.66 MI NW SR 272 (Lat: 46.930183,  Lng: -117.285250),  Route carried "on" structure: County highway 24500,  Year Built: 1967,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 75 (year 2021),  Truck Traffic: 35%,  Average Future Daily Traffic: 75 (year 2039),  Design Load: HS 20,  Features Intersected: PALOUSE RIVER,  Facility Carried by Structure: GLENWOOD/2450
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.06m (16.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,523,000,  Roadway Improvement Cost: $505,000,  Total Project Cost: $5,046,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84414,  Location: 0.36 MI SW GREEN HOLLOW (Lat: 46.931800,  Lng: -117.408117),  Route carried "on" structure: County highway 43750,  Year Built: 1975,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 51 (year 2038),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: MANNING/4375
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $638,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,277,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85155,  Location: 0.10 MI E SR 195 (Lat: 46.895850,  Lng: -117.360617),  Route carried "on" structure: City street 230,  Year Built: 1920,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 306 (year 2039),  Design Load: H 15,  Features Intersected: NORTH FORK PALOUSE RIVER,  Facility Carried by Structure: SIXTH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,444,000,  Roadway Improvement Cost: $289,000,  Total Project Cost: $2,888,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 85208,  Location: 0.10 MI W SR 195 (Lat: 46.881883,  Lng: -117.365467),  Route carried "on" structure: City street 230,  Year Built: 1965,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 204 (year 2039),  Features Intersected: SOUTH FORK PALOUSE RIVER,  Facility Carried by Structure: WALL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,094,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 86501,  Location: 1.00 MI S DUNCAN SPRINGS (Lat: 46.826783,  Lng: -117.400100),  Route carried "on" structure: County highway 80000,  Year Built: 1998,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 428 (year 2021),  Truck Traffic: 40%,  Average Future Daily Traffic: 428 (year 2038),  Design Load: HS 20,  Features Intersected: REBEL FLAT CREEK,  Facility Carried by Structure: ALMOTA/8000
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 96.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 96.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $300,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: 86504,  Location: 0.12 MI W ALMOTA (Lat: 46.841233,  Lng: -117.402017),  Route carried "on" structure: County highway 80200,  Year Built: 1996,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 267 (year 2021),  Truck Traffic: 40%,  Average Future Daily Traffic: 272 (year 2039),  Design Load: HS 20,  Features Intersected: REBEL FLAT CREEK,  Facility Carried by Structure: DUNCAN SPRING/8020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 77.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $218,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 87109,  Location: 0.07 MI SW SR 195 (Lat: 46.813583,  Lng: -117.322800),  Route carried "on" structure: County highway 80500,  Year Built: 2003,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 30 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 30 (year 2039),  Design Load: HS 20,  Features Intersected: SPRING FLAT CREEK,  Facility Carried by Structure: HOFER/8050
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 28.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,064,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2294A,  Location: 15.2 E JCT SR 127 (Lat: 46.884528,  Lng: -117.390667),  Route carried "under" structure: State highway 26,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 3,044 (year 2019),  Truck Traffic: 30%,  Features Intersected: STATE ROUTE 26,  Facility Carried by Structure: RAILROAD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 212.514,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 17.4m (57.1ft)