  • 18Number of bridges
  • 125ft / 37.7mTotal length
  • 113,094Total average daily traffic
  • 19,854Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Coloma
  • No street view available for this location

New bridges in Coloma, WI - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 21950-1959
  • 31960-1969
  • 111980-1989
  • 12000-2009
Reconstructed bridges in Coloma, WI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Coloma, WI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Very good
  • 9.1%Good
  • 72.7%Satisfactory
  • 9.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Very good
  • 27.3%Good
  • 45.5%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 72.7%Good
  • 9.1%Satisfactory
  • 9.1%Fair
Find on map >>   Show street view

Structure Number: B390036,  Location: 1.6M N JCT CTH Z (Lat: 43.981639,  Lng: -89.496058),  Route carried "on" structure: Interstate 39,  Year Built: 1987,  Status: Open,  Structure Length: 1.76m (5.77ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 13,300 (year 2039),  Design Load: HS 20,  Features Intersected: CHAFFEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B390071,  Location: 1.6 M N JCT CTH Z (Lat: 43.981333,  Lng: -89.462306),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 260 (year 2018),  Average Future Daily Traffic: 266 (year 2039),  Design Load: HS 20,  Features Intersected: CHAFEE CREEK,  Facility Carried by Structure: CTH JJ
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B690001,  Location: 0.1M W JCT CTH I (Lat: 44.162839,  Lng: -88.906972),  Route carried "on" structure: County highway ,  Year Built: 1948,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 627 (year 2019),  Average Future Daily Traffic: 689 (year 2040),  Design Load: H 15,  Features Intersected: PONY CREEK,  Facility Carried by Structure: CTH H
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B690007,  Location: 0.5M S JCT STH 21 TO W (Lat: 44.026667,  Lng: -89.521667),  Route carried "on" structure: Interstate 39,  Year Built: 1957,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 13,500 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 16,200 (year 2038),  Design Load: HS 20,  Features Intersected: CTH CH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B690011,  Location: 3.9M E JCT CTH K (Lat: 44.180872,  Lng: -89.136583),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 1,672 (year 2019),  Average Future Daily Traffic: 1,839 (year 2040),  Design Load: H 15,  Features Intersected: PINE RIVER,  Facility Carried by Structure: CTH A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 31.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B690012,  Location: 3.6M S JCT CTH V TO E (Lat: 44.083333,  Lng: -89.533333),  Route carried "on" structure: Interstate 39,  Year Built: 1966,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 10,800 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 12,960 (year 2038),  Design Load: HS 20,  Features Intersected: LRD BUTTERCUP AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Other
Find on map >>   Show street view

Structure Number: B690017,  Location: 2.8M N JCT CTH Z (Lat: 43.996425,  Lng: -89.497836),  Route carried "on" structure: Interstate 39,  Year Built: 1986,  Status: Open,  Structure Length: 3.39m (11.12ft),  Average Daily Traffic: 13,500 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 16,200 (year 2038),  Design Load: HS 20,  Features Intersected: LRD CZECH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.1m (49.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B690018,  Location: 2.6M S JCT STH 21 TO E (Lat: 43.996719,  Lng: -89.498436),  Route carried "on" structure: Interstate 39,  Year Built: 1986,  Status: Open,  Structure Length: 3.39m (11.12ft),  Average Daily Traffic: 13,500 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 16,200 (year 2038),  Design Load: HS 20,  Features Intersected: LRD CZECH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.1m (49.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B690019,  Location: 5.4M N JCT CTH Z (Lat: 44.028017,  Lng: -89.521900),  Route carried "on" structure: Interstate 39,  Year Built: 1986,  Status: Open,  Structure Length: 6.59m (21.62ft),  Average Daily Traffic: 13,500 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 16,200 (year 2038),  Design Load: HS 20,  Features Intersected: CTH CH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B69002,  Location: AT JCT STH 21-USH 51 (Lat: 44.035039,  Lng: -89.529283),  Route carried "on" structure: State highway 21,  Year Built: 1985,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 5,900 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,080 (year 2038),  Design Load: HS 20,  Features Intersected: IH USH 51-IH 39
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B690021,  Location: 4.2M N JCT STH 21 TO E (Lat: 44.082783,  Lng: -89.532078),  Route carried "on" structure: Interstate 39,  Year Built: 1984,  Status: Open,  Structure Length: 2.98m (9.78ft),  Average Daily Traffic: 10,800 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 12,960 (year 2038),  Design Load: HS 20,  Features Intersected: LRD BUTTERCUP AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B690007,  Location: 1.0M S JCT CTH FF (Lat: 44.026667,  Lng: -89.521667),  Route carried "under" structure: County highway ,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2018),  Features Intersected: CTH CH,  Facility Carried by Structure: IH USH51-IH39 SB
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: B690012,  Location: 1.6M E JCT CTH V (Lat: 44.083333,  Lng: -89.533333),  Route carried "under" structure: City street ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 275 (year 2019),  Features Intersected: LRD BUTTERCUP AVE,  Facility Carried by Structure: IH USH51-IH39 SB
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: B690017,  Location: 1.9M E JCT CTH JJ (Lat: 43.996425,  Lng: -89.497836),  Route carried "under" structure: City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2019),  Features Intersected: LRD CZECH AVE,  Facility Carried by Structure: IH USH51-IH39 NB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 15.1m (49.5ft)

Find on map >>   Show street view

Structure Number: B690018,  Location: 2.0M E JCT CTH JJ (Lat: 43.996719,  Lng: -89.498436),  Route carried "under" structure: City street ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2019),  Features Intersected: LRD CZECH AVE,  Facility Carried by Structure: IH USH 51-IH 39 SB
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 15.1m (49.5ft)

Find on map >>   Show street view

Structure Number: B690019,  Location: 7.5M E JCT CTH G (Lat: 44.028017,  Lng: -89.521900),  Route carried "under" structure: County highway ,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2018),  Features Intersected: CTH CH,  Facility Carried by Structure: IH USH51-IH39NB
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: B69002,  Location: AT JCT STH 21-USH 51 (Lat: 44.035039,  Lng: -89.529283),  Route carried "under" structure: Interstate 39,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 13,500 (year 2018),  Truck Traffic: 20%,  Features Intersected: IH USH 51-IH 39,  Facility Carried by Structure: STH 21
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: B690021,  Location: 1.7M E JCT CTH V (Lat: 44.082783,  Lng: -89.532078),  Route carried "under" structure: City street ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2019),  Features Intersected: LRD BUTTERCUP AVE,  Facility Carried by Structure: IH USH 51-IH 39 NB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 12.2m (40.0ft)