Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Colonial Park, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 180ft / 55.1mTotal length
  • $6,325,000Total costs
  • 561,506Total average daily traffic
  • 111,053Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Colonial Park
  • No street view available for this location

New bridges in Colonial Park, PA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 41950-1959
  • 181960-1969
  • 22000-2009
  • 12020-2022
Reconstructed bridges in Colonial Park, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 71990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Colonial Park, PA
Average Bridge Truck Traffic in Colonial Park, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Very good
  • 60.0%Good
  • 26.7%Satisfactory
  • 6.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Excellent
  • 20.0%Very good
  • 26.7%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 6.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Excellent
  • 26.7%Good
  • 26.7%Satisfactory
  • 33.3%Fair
  • 6.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Good
  • 50.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 14228,  Location: I-81& I-83 INTERCHANGE (Lat: 40.308606,  Lng: -76.834339),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 36,585 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 46,197 (year 2032),  Design Load: HS 20,  Features Intersected: I-83 NB; SR 0083
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 7.580,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14229,  Location: 1 MI. N. PROGRESS (Lat: 40.311053,  Lng: -76.831631),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 36,585 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 46,197 (year 2032),  Design Load: HS 20,  Features Intersected: TWP RD 432
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.580,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $852,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14232,  Location: 1 MI. N. PROGRESS (Lat: 40.311172,  Lng: -76.833281),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 35,491 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 47,266 (year 2032),  Design Load: HS 20,  Features Intersected: T-432,CRUMS MILL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.525,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $353,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14233,  Location: 2.5 MI.S.W. LINGLESTOWN (Lat: 40.320333,  Lng: -76.821358),  Route carried "on" structure: Interstate 81,  Year Built: 1969,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 72,076 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 93,463 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TRIB PAXTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.193,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 38.7m (127.0ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 14289,  Location: UPPER LEVEL (3LEV CROSS) (Lat: 40.308606,  Lng: -76.834244),  Route carried "on" structure: Interstate 83,  Year Built: 1969,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 38,711 (year 2022),  Truck Traffic: 18%,  Average Future Daily Traffic: 49,799 (year 2032),  Design Load: HS 20,  Features Intersected: SR 0081 NB & SR 0083 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.712,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $156,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1429,  Location: 1 MI.N. PROGRESS (Lat: 40.311372,  Lng: -76.832372),  Route carried "on" structure: Interstate 83,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 38,711 (year 2022),  Truck Traffic: 18%,  Average Future Daily Traffic: 49,799 (year 2032),  Design Load: HS 20,  Features Intersected: CRUMS MILL ROAD; T-432
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.350,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $59,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $793,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14545,  Location: 1.5 NORTH OF PROGRESS (Lat: 40.318728,  Lng: -76.823675),  Route carried "on" structure: State highway ,  Year Built: 1968,  Status: Open,  Structure Length: 9.78m (32.09ft),  Average Daily Traffic: 11,639 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,786 (year 2032),  Design Load: HS 20,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: SR 3017
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.593,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.90m (35.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $426,000,  Total Project Cost: $1,954,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 14546,  Location: 2 MI. N. OF PROGRESS (Lat: 40.321553,  Lng: -76.823928),  Route carried "on" structure: State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 11,639 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 17,786 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB PAXTON CREEK,  Facility Carried by Structure: SR 3017
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.498,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 14678,  Location: 1.5 SW LNGLSTN/TR PAX CR (Lat: 40.323233,  Lng: -76.821236),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 110 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 420 (year 2041),  Features Intersected: TRIB. PAXTON CREEK,  Facility Carried by Structure: GERALDINE DR. T302
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 14683,  Location: .3NW I/S 81&83/PAXTON CR (Lat: 40.314567,  Lng: -76.839119),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,050 (year 2039),  Features Intersected: PAXTON CREEK,  Facility Carried by Structure: CRUMS MILL RD T432
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14684,  Location: 1.8N I/S 81&83/TR PXTN CR (Lat: 40.324358,  Lng: -76.835142),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Closed,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 150 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 210 (year 2041),  Features Intersected: TRIB PAXTON CREEK,  Facility Carried by Structure: MCINTOSH ROAD T495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14685,  Location: 1 SW LNGLSTN/TR PAXTN CR (Lat: 40.326394,  Lng: -76.814683),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 750 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,050 (year 2041),  Features Intersected: TRIB PAXTON CREEK,  Facility Carried by Structure: GOOSE VALLEY RD T5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $140,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1477,  Location: 1 MI. N. PROGRESS (Lat: 40.328333,  Lng: -76.833333),  Route carried "on" structure: Ramp State highway ,  Year Built: 1969,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 14,612 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 20,526 (year 2032),  Design Load: HS 20,  Features Intersected: T-432,CRUMS MILL RD.,  Facility Carried by Structure: SR 8007, RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $619,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31529,  Location: 1.7 MI.S.OF SHANKSVILLE (Lat: 39.989531,  Lng: -78.907308),  Route carried "on" structure: State highway ,  Year Built: 1949,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 221 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 283 (year 2032),  Design Load: HL 93,  Features Intersected: STONY CREEK,  Facility Carried by Structure: SR 1007
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.833,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019,  Bridge Improvement Cost: $74,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $997,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31573,  Location: OGLETOWN (Lat: 40.199303,  Lng: -78.704114),  Route carried "on" structure: State highway ,  Year Built: 1952,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 488 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 475 (year 2032),  Design Load: HL 93,  Features Intersected: BISCUIT SPRING RUN,  Facility Carried by Structure: T840 MT CARMEL DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.061,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $34,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $461,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 42583,  Location: 3 MI.N.W. HUMMELSTOWN (Lat: 40.287889,  Lng: -76.763528),  Route carried "on" structure: State highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,601 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,241 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: TRIB. TO NYE'S RUN,  Facility Carried by Structure: SR 3020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 85.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 42584,  Location: 3 MI.N.W.HUMMELSTOWN (Lat: 40.288389,  Lng: -76.763083),  Route carried "on" structure: State highway ,  Year Built: 2004,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 5,601 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,241 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: TRIB. TO BEAVER CREEK,  Facility Carried by Structure: SR 3020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 67834,  Location: 1 MI. N. OF PROGRESS (Lat: 40.303983,  Lng: -76.829739),  Route carried "on" structure: Interstate 83,  Year Built: 2020,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 47,691 (year 2022),  Truck Traffic: 16%,  Average Future Daily Traffic: 50,213 (year 2032),  Design Load: HL 93,  Features Intersected: T-431, Valley Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.025,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 26.1m (85.6ft),  Out-to-Out Width: 27.2m (89.2ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14228,  Location: I-81& I-83 INTERCHANGE (Lat: 40.308606,  Lng: -76.834339),  Route carried "under" structure: Interstate 83,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 47,691 (year 2022),  Truck Traffic: 16%,  Features Intersected: I-83 NB; SR 0083,  Facility Carried by Structure: I-81 NB; SR 0081
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 12.789,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 14229,  Location: 1 MI. N. PROGRESS (Lat: 40.311053,  Lng: -76.831631),  Route carried "under" structure: City street T432,  Year Built: 1969,  Structure Length: 0. m,  Features Intersected: TWP RD 432,  Facility Carried by Structure: I-81 NB; SR 0081
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 10.7m (35.1ft)

Find on map >>   Show street view

Structure Number: 14232,  Location: 1 MI. N. PROGRESS (Lat: 40.311172,  Lng: -76.833281),  Route carried "under" structure: City street T432,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2005),  Features Intersected: T-432,CRUMS MILL RD.,  Facility Carried by Structure: I-81 SB; SR 0081
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: 14289,  Location: UPPER LEVEL (3LEV CROSS) (Lat: 40.308606,  Lng: -76.834244),  Route carried "under" structure: Interstate 83,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 47,691 (year 2022),  Truck Traffic: 16%,  Features Intersected: SR 0081 NB & SR 0083 NB
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 12.789,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 14289,  Location: UPPER LEVEL (3LEV CROSS) (Lat: 40.308606,  Lng: -76.834244),  Route carried "under" structure: Interstate 81,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 36,585 (year 2021),  Truck Traffic: 25%,  Features Intersected: SR 0081 NB & SR 0083 NB,  Facility Carried by Structure: I-83 SB; SR 0083
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 7.580,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 1429,  Location: 1 MI.N. PROGRESS (Lat: 40.311372,  Lng: -76.832372),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2005),  Features Intersected: CRUMS MILL ROAD; T-432,  Facility Carried by Structure: I-83 SB; SR 0083
Minimum Vertical Clearance: 11.34m (37.20ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 14545,  Location: 1.5 NORTH OF PROGRESS (Lat: 40.318728,  Lng: -76.823675),  Route carried "under" structure: Interstate 81,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 36,585 (year 2021),  Truck Traffic: 25%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: SR 3017
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 9.193,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 14545,  Location: 1.5 NORTH OF PROGRESS (Lat: 40.318728,  Lng: -76.823675),  Route carried "under" structure: Interstate 81,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 35,491 (year 2021),  Truck Traffic: 25%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: SR 3017
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 9.112,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 1477,  Location: 1 MI. N. PROGRESS (Lat: 40.328333,  Lng: -76.833333),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 1990),  Features Intersected: T-432,CRUMS MILL RD.,  Facility Carried by Structure: SR 8007, RAMP B
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 11.3m (37.1ft)

Discuss Colonial Park, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.