Bridge Statistics for Columbiana, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 220ft / 67.4mTotal length
  • $29,239,000Total costs
  • 60,777Total average daily traffic
  • 3,798Total average daily truck traffic
  • 88,342Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Columbiana
  • No street view available for this location

New bridges in Columbiana, AL - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 21950-1959
  • 71960-1969
  • 21980-1989
  • 21990-1999
  • 42000-2009
Average Bridge Daily Traffic in Columbiana, AL
Average Bridge Truck Traffic in Columbiana, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 22.2%Good
  • 44.4%Satisfactory
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 22.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 33.3%Good
  • 11.1%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 38.9%Good
  • 33.3%Satisfactory
  • 16.7%Fair
  • 11.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Very good
  • 60.0%Good
  • 30.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1172,  Location: 0.2 MI S JCT CO 26 (Lat: 33.190689,  Lng: -86.674147),  Route carried "on" structure: County highway ,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 40 (year 2020),  Average Future Daily Traffic: 56 (year 2040),  Features Intersected: BIG CREEK,  Facility Carried by Structure: ATCHISON TRACE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $267,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2847,  Location: AT JCT OF CO. RD. 77 (Lat: 33.183372,  Lng: -86.543703),  Route carried "on" structure: County highway 61,  Year Built: 1945,  Status: Posted for load,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,000 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,640 (year 2041),  Design Load: H 20,  Features Intersected: BEESWAX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $979,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,077,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3726,  Location: 1.5 MI NW JCT AL 70 (Lat: 33.193842,  Lng: -86.656583),  Route carried "on" structure: County highway 26,  Year Built: 1950,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 4,401 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 6,977 (year 2040),  Design Load: H 15,  Features Intersected: WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $588,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $647,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4977,  Location: 1.1 MI SE ALA HWY 17 (Lat: 32.328333,  Lng: -88.163333),  Route carried "on" structure: County highway 1251,  Year Built: 1954,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 226 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 336 (year 2038),  Design Load: H 15,  Features Intersected: CO RT 1251 STREAM,  Facility Carried by Structure: ROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $248,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6767,  Location: .5 MI SE CO B10 CO 48 JCT (Lat: 34.517542,  Lng: -87.624336),  Route carried "on" structure: County highway B10,  Year Built: 1960,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 110 (year 1986),  Truck Traffic: 5%,  Average Future Daily Traffic: 296 (year 2031),  Features Intersected: LITTLE MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 28.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $232,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7965,  Location: .1 MI. SO. AL 70 (Lat: 33.177731,  Lng: -86.616336),  Route carried "on" structure: State highway 25,  Year Built: 1963,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,630 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,813 (year 2040),  Design Load: H 15,  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.259,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $494,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $543,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8434,  Location: 2 MI W JCT SR 253 (Lat: 33.941422,  Lng: -87.846839),  Route carried "on" structure: US 118,  Year Built: 1964,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 7,590 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,446 (year 2033),  Design Load: HS 20,  Features Intersected: Luxapalilla Creek
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 38.862,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.76m (32.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,815,000,  Roadway Improvement Cost: $382,000,  Total Project Cost: $4,197,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9177,  Location: SR 163 @ I-10 INTERCHANGE (Lat: 30.639158,  Lng: -88.089000),  Route carried "on" structure: State highway 163,  Year Built: 1966,  Status: Open,  Structure Length: 24.81m (81.40ft),  Average Daily Traffic: 28,382 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 42,573 (year 2039),  Design Load: HS 20,  Features Intersected: I-10/CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.779,  Lanes on structure: 4,  Lanes under structure: 21,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 5,  Length of Maximum Span: 35.7m (117.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 24.81m (81.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $11,569,000,  Roadway Improvement Cost: $1,157,000,  Total Project Cost: $12,726,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9439,  Location: 1.6 MI N INT RT 87 * 130 (Lat: 32.041700,  Lng: -88.172003),  Route carried "on" structure: County highway 130,  Year Built: 1967,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 450 (year 1996),  Truck Traffic: 12%,  Average Future Daily Traffic: 412 (year 2036),  Design Load: H 15,  Features Intersected: OPOSSUM BRANCH,  Facility Carried by Structure: CO RD 43
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $294,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $323,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9946,  Location: 1500' N AL 79 (Lat: 33.622367,  Lng: -86.740883),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,825 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,545 (year 2040),  Design Load: H 20,  Features Intersected: BARTON BRANCH,  Facility Carried by Structure: PAWNEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.3m (20.7ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.0m (29.5ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $572,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $629,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 9947,  Location: 3.4 MI. W. ALA. 17 (Lat: 33.940806,  Lng: -88.204111),  Route carried "on" structure: County highway 35,  Year Built: 1969,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 120 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 178 (year 2036),  Design Load: H 15,  Features Intersected: LOST REED CREEK,  Facility Carried by Structure: LOST CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 78.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $319,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $351,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1258,  Location: 3.75MI W JCT AL 25 (Lat: 33.213611,  Lng: -86.659756),  Route carried "on" structure: County highway 34,  Year Built: 1981,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 388 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 585 (year 2040),  Design Load: H 20,  Features Intersected: STREAM OFF WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 31.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13326,  Location: 2.3 MI W JCT AL 25 (Lat: 33.248906,  Lng: -86.569878),  Route carried "on" structure: County highway 49,  Year Built: 1984,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 384 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 820 (year 2041),  Design Load: HS 20,  Features Intersected: FOURMILE CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.06m (6.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $666,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $733,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15619,  Location: 5.25M. NW. JCT ST. HWY 70 (Lat: 33.202158,  Lng: -86.708050),  Route carried "on" structure: County highway 26,  Year Built: 1992,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,500 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,300 (year 2041),  Design Load: HS 20,  Features Intersected: N.FORK BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $563,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1644,  Location: 3.4 MI W JCT ST 25 (Lat: 33.209797,  Lng: -86.653817),  Route carried "on" structure: County highway 34,  Year Built: 1995,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 700 (year 2040),  Design Load: HS 20,  Features Intersected: N FORK WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $432,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17648,  Location: 02 MI. WEST JCT.CO. RD. 5 (Lat: 33.196967,  Lng: -86.559025),  Route carried "on" structure: County highway 30,  Year Built: 2001,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 1,161 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,142 (year 2041),  Design Load: HS 20,  Features Intersected: BEESWAX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.02m (19.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,320,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,452,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18751,  Location: AL 70 @ WAXAHATCHEE CK (Lat: 33.179856,  Lng: -86.654025),  Route carried "on" structure: State highway 70,  Year Built: 2007,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 5,420 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,613 (year 2042),  Design Load: HS 20,  Features Intersected: WAXAHATCHEE CREEK
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 9.627,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 85.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 10.11m (33.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $3,189,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $3,508,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19305,  Location: 1.1 MI. FROM AL 70 (Lat: 33.161514,  Lng: -86.669153),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 600 (year 2020),  Average Future Daily Traffic: 840 (year 2040),  Design Load: HS 20,  Features Intersected: UT TO CAMP BRANCH,  Facility Carried by Structure: CR 97
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $542,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $596,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19317,  Location: CR 446 1/2 MI FROM CR 47 (Lat: 33.245806,  Lng: -86.614831),  Route carried "on" structure: County highway 446,  Year Built: 2001,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 70 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.29m (4.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $329,000 ( Estimate for 2022)