Bridge Statistics for Concord, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 34Number of bridges
  • 203ft / 61.8mTotal length
  • $54,421,000Total costs
  • 70,509Total average daily traffic
  • 3,865Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Concord
  • No street view available for this location

New bridges in Concord, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 21950-1959
  • 31960-1969
  • 21970-1979
  • 131980-1989
  • 51990-1999
  • 22000-2009
  • 42010-2019
Average Bridge Daily Traffic in Concord, NY
Average Bridge Truck Traffic in Concord, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 38.5%Good
  • 7.7%Satisfactory
  • 23.1%Fair
  • 7.7%Poor
  • 7.7%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Excellent
  • 30.8%Very good
  • 30.8%Good
  • 7.7%Satisfactory
  • 7.7%Fair
  • 7.7%Poor
  • 7.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 46.2%Good
  • 7.7%Satisfactory
  • 15.4%Fair
  • 23.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.0%Very good
  • 10.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
  • 15.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 7.1%Very good
  • 42.9%Good
  • 35.7%Satisfactory
  • 7.1%Fair
  • 7.1%Poor
Find on map >>   Show street view

Structure Number: 10245,  Location: 1.1 MI W JCT RTS 39 + 219 (Lat: 42.508156,  Lng: -78.706667),  Route carried "on" structure: State highway 39,  Year Built: 1970,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,602 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,799 (year 2040),  Design Load: HS 20,  Features Intersected: SPOONER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.395,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $370,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $586,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10416,  Location: 5.8 MI N JCT US219 & SH39 (Lat: 42.579325,  Lng: -78.695317),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,236 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,248 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: SPRVLLE-BOSTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.732,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $526,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 104161,  Location: 6.7 MI N JCT US219 & SH39 (Lat: 42.590019,  Lng: -78.704233),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,236 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,248 (year 2040),  Design Load: HS 20,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: SPRINGN'LE-BOSTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.196,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 79.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $371,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1071071,  Location: 7.4MI N JCT.RTES 219 & 39 (Lat: 42.604300,  Lng: -78.753014),  Route carried "on" structure: US 219,  Year Built: 1981,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 5,706 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,904 (year 2040),  Design Load: HS 20,  Features Intersected: BROWN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.251,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,403,000,  Roadway Improvement Cost: $1,407,000,  Total Project Cost: $3,810,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1071072,  Location: 2.4 MI NE OF NEW OREGON (Lat: 42.604447,  Lng: -78.752108),  Route carried "on" structure: US 219,  Year Built: 1981,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 5,706 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,904 (year 2040),  Design Load: HS 20,  Features Intersected: BROWN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.251,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,403,000,  Roadway Improvement Cost: $1,407,000,  Total Project Cost: $3,810,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1071081,  Location: 6.3MI N JCT RTES 219 & 39 (Lat: 42.590208,  Lng: -78.737914),  Route carried "on" structure: US 219,  Year Built: 1981,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 5,706 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,904 (year 2040),  Design Load: HS 20,  Features Intersected: TREVETT RD CR420
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.320,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,176,000,  Roadway Improvement Cost: $1,274,000,  Total Project Cost: $3,450,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1071082,  Location: 6.3MI N JCT RTES 219 & 39 (Lat: 42.590978,  Lng: -78.737225),  Route carried "on" structure: US 219,  Year Built: 1981,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 5,706 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,904 (year 2040),  Design Load: HS 20,  Features Intersected: TREVETT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.320,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,258,000,  Roadway Improvement Cost: $1,322,000,  Total Project Cost: $3,580,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107109,  Location: 3.1 MI N JCT SH39 &S EXPY (Lat: 42.553022,  Lng: -78.710856),  Route carried "on" structure: Alternate County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 1,259 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,271 (year 2040),  Design Load: HS 20,  Features Intersected: 219 219 53121055 NB, RTE,  Facility Carried by Structure: GENESEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.457,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.4m (122.7ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Poor,  Superstructure: Very good,  Substructure: Poor,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.63m (31.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $7,893,000,  Roadway Improvement Cost: $4,622,000,  Total Project Cost: $12,514,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1078051,  Location: SE of Springville (Lat: 42.474578,  Lng: -78.696119),  Route carried "on" structure: State highway 219,  Year Built: 2010,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 2,479 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,867 (year 2040),  Design Load: HL 93,  Features Intersected: SOUTH CASCADE DRI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 58.7m (192.6ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.15m (20.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,371,000,  Roadway Improvement Cost: $1,974,000,  Total Project Cost: $5,345,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1078052,  Location: SW of Springville (Lat: 42.475164,  Lng: -78.695650),  Route carried "on" structure: US 219,  Year Built: 2010,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 2,479 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,867 (year 2040),  Design Load: HL 93,  Features Intersected: SOUTH CASCADE DRI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 58.7m (192.6ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.15m (20.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,420,000,  Roadway Improvement Cost: $2,003,000,  Total Project Cost: $5,423,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 226082,  Location: .9 MI N OF EAST CONCORD (Lat: 42.564231,  Lng: -78.636717),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 25 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 35 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: GRAFF BROOK,  Facility Carried by Structure: ROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $128,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $204,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 304247,  Location: 4.4 MI N JCT SH240 & SH39 (Lat: 42.568872,  Lng: -78.641361),  Route carried "on" structure: State highway 240,  Year Built: 1966,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,758 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,775 (year 2040),  Features Intersected: GRAFF BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.415,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 74.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $456,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 304248,  Location: 5.4 MI N JCT SH240 & SH39 (Lat: 42.574825,  Lng: -78.642139),  Route carried "on" structure: State highway 240,  Year Built: 2002,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,758 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,775 (year 2040),  Features Intersected: SPENCER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.075,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $280,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $445,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 304249,  Location: 6.3 MI N JCT SH240 & SH39 (Lat: 42.594881,  Lng: -78.650089),  Route carried "on" structure: State highway 240,  Year Built: 1966,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 2,293 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,315 (year 2040),  Features Intersected: SPRAGUE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.488,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $387,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332836,  Location: 3.2 MI SW OF SPRINGVILLE (Lat: 42.473814,  Lng: -78.744775),  Route carried "on" structure: Other road ,  Year Built: 1939,  Year Reconstructed: 2011,  Status: Posted for load,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 128 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 179 (year 2038),  Features Intersected: CATTARAUGUS CREEK,  Facility Carried by Structure: HAMMOND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.795,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.49m (24.57ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $4,233,000,  Roadway Improvement Cost: $2,479,000,  Total Project Cost: $6,712,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332843,  Location: 2.8 MI SE OF MORTON CORS (Lat: 42.488139,  Lng: -78.721453),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 225 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 315 (year 2038),  Design Load: H 20,  Features Intersected: SPOONER CREEK,  Facility Carried by Structure: ZOAR VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.293,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $933,000,  Roadway Improvement Cost: $546,000,  Total Project Cost: $1,479,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332844,  Location: .8 MILE N OF SPRINGVILLE (Lat: 42.527494,  Lng: -78.663008),  Route carried "on" structure: County highway ,  Year Built: 1929,  Status: Posted for load-capacity,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,156 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,618 (year 2037),  Features Intersected: SPRING BROOK,  Facility Carried by Structure: SHARP STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Poor,  Channel: Poor,  Operating Rating: 26.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $595,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332852,  Location: 1.5 MI N OF SPRINGVILLE (Lat: 42.530667,  Lng: -78.667181),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 909 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,273 (year 2037),  Design Load: HS 20,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: MIDDLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $433,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332855,  Location: 2.1 MI N OF EAST CONCORD (Lat: 42.582239,  Lng: -78.644083),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 91 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 127 (year 2039),  Features Intersected: BR CAZENOVIA CRK,  Facility Carried by Structure: MORSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.395,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $783,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $1,242,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332858,  Location: 2.6 MI S OF MORTON CORS (Lat: 42.474767,  Lng: -78.749744),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 126 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 176 (year 2040),  Features Intersected: DERBY BROOK,  Facility Carried by Structure: ZOAR VALLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.171,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $106,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $168,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332863,  Location: .4 MILE NW OF FOWLERVILLE (Lat: 42.605839,  Lng: -78.722347),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 120 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 168 (year 2038),  Design Load: HS 20,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: FOWLERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $675,000,  Roadway Improvement Cost: $395,000,  Total Project Cost: $1,070,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336736,  Location: 2.2 MI SE OF GLENWOOD (Lat: 42.589492,  Lng: -78.641722),  Route carried "on" structure: Other road ,  Year Built: 1968,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 148 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 207 (year 2038),  Features Intersected: SPRAGUE BROOK,  Facility Carried by Structure: SPRAGUE BRK PK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $412,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336737,  Location: 2.3 MILES SE OF WYANDALE (Lat: 42.534700,  Lng: -78.731383),  Route carried "on" structure: County highway ,  Year Built: 1931,  Status: Posted for load-capacity,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 55 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 77 (year 2038),  Features Intersected: SPOONER CREEK,  Facility Carried by Structure: CONCORD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.718,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $362,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336739,  Location: 2 MILES NE OF SPRINGVILLE (Lat: 42.535972,  Lng: -78.675125),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,012 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,042 (year 2040),  Design Load: HS 20,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: SPRINGV-BOSTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.620,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Fair,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $208,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $330,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336759,  Location: IN WYANDALE (Lat: 42.555203,  Lng: -78.765250),  Route carried "on" structure: County highway ,  Year Built: 1987,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,179 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,190 (year 2040),  Design Load: HS 20,  Features Intersected: TRB 18 MILE CREEK,  Facility Carried by Structure: GENESEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $215,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336781,  Location: CO RD 391 & ADAMS ROAD (Lat: 42.536244,  Lng: -78.676939),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 75 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 105 (year 2038),  Design Load: HS 20,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: CR 416 / ADAMS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.673,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $177,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $281,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336811,  Location: .2 MI N JCT CR 49 & CR 50 (Lat: 42.561317,  Lng: -78.765739),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 214 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 300 (year 2038),  Design Load: HS 20,  Features Intersected: SB EIGHTEEN MI CK,  Facility Carried by Structure: WYANDALE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $215,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1071071,  Location: 7.4MI N JCT.RTES 219 & 39 (Lat: 42.604300,  Lng: -78.753014),  Route carried "under" structure: County highway ,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 170 (year 2017),  Truck Traffic: 6%,  Features Intersected: BROWN HILL ROAD,  Facility Carried by Structure: RTE 219
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 4.521,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 1071072,  Location: 2.4 MI NE OF NEW OREGON (Lat: 42.604447,  Lng: -78.752108),  Route carried "under" structure: County highway ,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 170 (year 2017),  Truck Traffic: 6%,  Features Intersected: BROWN HILL ROAD,  Facility Carried by Structure: RTE 219
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 3.041,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 1071081,  Location: 6.3MI N JCT RTES 219 & 39 (Lat: 42.590208,  Lng: -78.737914),  Route carried "under" structure: County highway ,  Year Built: 1981,  Structure Length: 0. m,  Features Intersected: TREVETT RD CR420,  Facility Carried by Structure: RTE 219
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 12.325,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 1071082,  Location: 6.3MI N JCT RTES 219 & 39 (Lat: 42.590978,  Lng: -78.737225),  Route carried "under" structure: County highway ,  Year Built: 1981,  Structure Length: 0. m,  Features Intersected: TREVETT ROAD,  Facility Carried by Structure: RTE 219
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 11.939,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 107109,  Location: 3.1 MI N JCT SH39 &S EXPY (Lat: 42.553022,  Lng: -78.710856),  Route carried "under" structure: US 219,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 10,952 (year 2002),  Features Intersected: 219 219 53121055 NB, RTE,  Facility Carried by Structure: GENESEE ROAD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 9.477,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.4m (122.7ft)

Find on map >>   Show street view

Structure Number: 1078051,  Location: SE of Springville (Lat: 42.474578,  Lng: -78.696119),  Route carried "under" structure: Alternate County highway ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 5,415 (year 2021),  Features Intersected: SOUTH CASCADE DRI,  Facility Carried by Structure: RTE 219
Minimum Vertical Clearance: 6.76m (22.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.7m (192.6ft)

Find on map >>   Show street view

Structure Number: 1078052,  Location: SW of Springville (Lat: 42.475164,  Lng: -78.695650),  Route carried "under" structure: Alternate County highway ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 5,415 (year 2021),  Features Intersected: SOUTH CASCADE DRI,  Facility Carried by Structure: RTE 219
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.7m (192.6ft)