Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Conewango, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 121ft / 36.7mTotal length
  • $27,637,000Total costs
  • 10,576Total average daily traffic
  • 1,167Total average daily truck traffic
  • 11,467Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Conewango
  • No street view available for this location

New bridges in Conewango, NY - historical statistics
  • New bridges - historical statistics
  • 41930-1939
  • 11960-1969
  • 51980-1989
  • 61990-1999
  • 12000-2009
  • 32010-2019
Reconstructed bridges in Conewango, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Truck Traffic in Conewango, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.5%Excellent
  • 15.8%Very good
  • 42.1%Good
  • 26.3%Satisfactory
  • 5.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.1%Excellent
  • 10.5%Very good
  • 47.4%Good
  • 15.8%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.5%Excellent
  • 21.1%Very good
  • 42.1%Good
  • 10.5%Satisfactory
  • 15.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.0%Very good
  • 35.0%Good
  • 20.0%Satisfactory
  • 15.0%Fair
  • 15.0%Poor
Find on map >>   Show street view

Structure Number: 102801,  Location: 0.2 MI E JCT RTS 62 + 83 (Lat: 42.239700,  Lng: -79.056983),  Route carried "on" structure: US 62,  Year Built: 1934,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 1,168 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,179 (year 2040),  Features Intersected: CONEWANGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $979,000,  Roadway Improvement Cost: $573,000,  Total Project Cost: $1,553,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102802,  Location: 0.4 MI E JCT RTS 62 + 83 (Lat: 42.238889,  Lng: -79.054297),  Route carried "on" structure: US 62,  Year Built: 1934,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 1,168 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,179 (year 2040),  Design Load: HS 20,  Features Intersected: STATE DRAIN DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $1,562,000,  Roadway Improvement Cost: $914,000,  Total Project Cost: $2,476,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102803,  Location: 0.7 MI E JCT RTS 62 + 83 (Lat: 42.238708,  Lng: -79.048397),  Route carried "on" structure: US 62,  Year Built: 2015,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 1,168 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,179 (year 2040),  Design Load: HL 93,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,316,000,  Roadway Improvement Cost: $771,000,  Total Project Cost: $2,086,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102804,  Location: 1.9 MI E JCT RTS 62 & 83 (Lat: 42.242111,  Lng: -79.031069),  Route carried "on" structure: US 62,  Year Built: 1993,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 1,252 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,263 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.816,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $752,000,  Roadway Improvement Cost: $440,000,  Total Project Cost: $1,193,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104268,  Location: 3.1 MI N JCT RTS 241+ 394 (Lat: 42.200931,  Lng: -78.991511),  Route carried "on" structure: State highway 241,  Year Built: 1936,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,167 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,178 (year 2040),  Features Intersected: WILLIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.972,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $373,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $591,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104269,  Location: 4.0 MI N JCT RTS 241+ 394 (Lat: 42.208372,  Lng: -79.003214),  Route carried "on" structure: State highway 241,  Year Built: 1939,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,167 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,178 (year 2040),  Features Intersected: CONEWANGO FEEDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.356,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $209,000,  Total Project Cost: $565,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332081,  Location: 2 MILES EAST OF CONEWANGO (Lat: 42.241508,  Lng: -79.045744),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 123 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 172 (year 2039),  Design Load: H 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: FLAT IRON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Poor,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $986,000,  Roadway Improvement Cost: $577,000,  Total Project Cost: $1,564,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332082,  Location: 1.3 MI NW OF CONEWANGO (Lat: 42.254028,  Lng: -79.045800),  Route carried "on" structure: County highway ,  Year Built: 1984,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 123 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 172 (year 2039),  Features Intersected: MUD CREEK,  Facility Carried by Structure: FLAT IRON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,119,000,  Roadway Improvement Cost: $655,000,  Total Project Cost: $1,774,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332083,  Location: 1.9 MI N OF EAST RANDOLF (Lat: 42.206647,  Lng: -78.946075),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 473 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 662 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: ELM CREEK,  Facility Carried by Structure: ELM CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 83.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $151,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $240,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332087,  Location: 2.0 MI NW OF RANDOLPH (Lat: 42.184278,  Lng: -79.034031),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 2.90m (9.51ft),  Truck Traffic: 5%,  Design Load: HS 25 or greater,  Features Intersected: CONEWANGO DREDGE,  Facility Carried by Structure: GOODWINS LANDING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $672,000,  Roadway Improvement Cost: $393,000,  Total Project Cost: $1,065,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332089,  Location: 0.4 MI E OF CLEAR CREEK (Lat: 42.221289,  Lng: -79.052950),  Route carried "on" structure: Other road ,  Year Built: 1986,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 276 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 386 (year 2039),  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: COWENS CORNERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,015,000,  Roadway Improvement Cost: $594,000,  Total Project Cost: $1,609,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33209,  Location: 1.2 MI SE OF CONEWANGO (Lat: 42.221736,  Lng: -79.036053),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 276 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 386 (year 2039),  Design Load: HS 20,  Features Intersected: CONEWANGO DREDGE,  Facility Carried by Structure: COWENS CORNERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.011,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $832,000,  Roadway Improvement Cost: $487,000,  Total Project Cost: $1,320,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332091,  Location: 1.6 MI S OF CONEWANGO (Lat: 42.216481,  Lng: -79.025458),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 276 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 386 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CONEWANGO CREEK,  Facility Carried by Structure: COWENS CORNERS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.121,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $462,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $732,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332092,  Location: 0.7 MI N OF EAST RANDOLPH (Lat: 42.189222,  Lng: -78.949328),  Route carried "on" structure: Other road ,  Year Built: 1985,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 74 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 104 (year 2037),  Features Intersected: ELM CREEK,  Facility Carried by Structure: WALKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.264,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,201,000,  Roadway Improvement Cost: $703,000,  Total Project Cost: $1,904,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 332093,  Location: .1 MILE NORTH OF RANDOLPH (Lat: 42.173403,  Lng: -78.985928),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 75 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 105 (year 2036),  Features Intersected: LIT CONEWANGO CRK,  Facility Carried by Structure: SWAMP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $628,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332094,  Location: 0.8 MILES NE OF CONEWANGO (Lat: 42.248022,  Lng: -79.020683),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 67 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 94 (year 2038),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: NORTHEAST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.319,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 94.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 71.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $804,000,  Roadway Improvement Cost: $471,000,  Total Project Cost: $1,276,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332095,  Location: 1.9 MI NE OF CONEWANGO (Lat: 42.251514,  Lng: -78.998525),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 128 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 179 (year 2039),  Features Intersected: N BR MILL CREEK,  Facility Carried by Structure: NORTHEAST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.347,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,074,000,  Roadway Improvement Cost: $629,000,  Total Project Cost: $1,703,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332096,  Location: 1.9 MILES NE OF CONEWANGO (Lat: 42.248433,  Lng: -78.996192),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 64 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 90 (year 2036),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: STODDARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $812,000,  Roadway Improvement Cost: $476,000,  Total Project Cost: $1,288,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332097,  Location: 2.6 MI N OF EAST RANDOLPH (Lat: 42.216225,  Lng: -78.945692),  Route carried "on" structure: Other road ,  Year Built: 1981,  Year Reconstructed: 1991,  Status: Posted for load-capacity,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 74 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 104 (year 2036),  Design Load: HS 20,  Features Intersected: ELM CREEK,  Facility Carried by Structure: POPE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.972,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $951,000,  Roadway Improvement Cost: $557,000,  Total Project Cost: $1,507,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 332455,  Location: .2 MILE S OF CLEAR CREEK (Lat: 42.217906,  Lng: -79.059897),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 1,457 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,471 (year 2040),  Design Load: HL 93,  Features Intersected: CLEAR CREEK,  Facility Carried by Structure: COUNTY ROAD 67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.535,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,616,000,  Roadway Improvement Cost: $947,000,  Total Project Cost: $2,563,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Discuss Conewango, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.