Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Coolidge, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 59ft / 17.8mTotal length
  • $3,558,000Total costs
  • 4,789Total average daily traffic
  • 837Total average daily truck traffic
  • 5,560Total future (year 2029) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Coolidge
  • No street view available for this location

New bridges in Coolidge, TX - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 11970-1979
  • 21990-1999
  • 12000-2009
  • 32010-2019
Average Bridge Truck Traffic in Coolidge, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.4%Very good
  • 22.2%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 22.2%Good
  • 66.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 22.2%Good
  • 55.6%Satisfactory
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Good
  • 45.5%Satisfactory
  • 36.4%Fair
Find on map >>   Show street view

Structure Number: 91470041902009,  Location: 3.30 MI NW OF FM 73 (Lat: 31.792114,  Lng: -96.695428),  Route carried "on" structure: State highway 171,  Year Built: 1958,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 1,917 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 2,390 (year 2038),  Features Intersected: MUNGER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.052,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $800,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9147004190201,  Location: 2.30 MI NW OF FM 73 (Lat: 31.783253,  Lng: -96.680683),  Route carried "on" structure: State highway 171,  Year Built: 1958,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,917 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 2,390 (year 2038),  Features Intersected: LONG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.731,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91470119102004,  Location: 1.50 MI NW OF FM 73 (Lat: 31.738008,  Lng: -96.705600),  Route carried "on" structure: State highway 936,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 60 (year 2038),  Design Load: H 10,  Features Intersected: TRIB OF NAVASOTA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.736,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91470217301001,  Location: 2.50 MI SE OF FM 73 (Lat: 31.710344,  Lng: -96.646875),  Route carried "on" structure: State highway 2310,  Year Built: 1957,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 295 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 230 (year 2033),  Features Intersected: W SANDY CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.038,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000
Find on map >>   Show street view

Structure Number: 91470AA0181003,  Location: 3.3 MI SE OF NAVARRO C/L (Lat: 31.791264,  Lng: -96.663903),  Route carried "on" structure: County highway 208,  Year Built: 1994,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 100 (year 2015),  Average Future Daily Traffic: 70 (year 2029),  Features Intersected: DANIEL BRANCH #25
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.311,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $313,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 91470AA0181004,  Location: 1.75 MI NW OF FM 73 (Lat: 31.761164,  Lng: -96.680022),  Route carried "on" structure: County highway 181,  Year Built: 2011,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 55 (year 2036),  Features Intersected: MUNGER BR TRIB #23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.736,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 91470AA0182001,  Location: 1.8 MI SOUTH OF SH 171 (Lat: 31.773469,  Lng: -96.695308),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 55 (year 2016),  Average Future Daily Traffic: 70 (year 2036),  Features Intersected: MUNGER BRANCH TRIBUTARY,  Facility Carried by Structure: CR 182
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 91470AA0183001,  Location: 0.85 MI NW OF FM 73 END (Lat: 31.799339,  Lng: -96.633864),  Route carried "on" structure: County highway 211,  Year Built: 2002,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 75 (year 2029),  Features Intersected: MUNGER BR #27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $419,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 91470AA0183002,  Location: 1.10 MI NW OF FM 73 (Lat: 31.801592,  Lng: -96.636792),  Route carried "on" structure: County highway 211,  Year Built: 1992,  Status: Posted for load,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 75 (year 2036),  Features Intersected: PIN OAK CRK #26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $418,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 91470AA0188001,  Location: 0.75 MI W OF CR 198 (Lat: 31.717561,  Lng: -96.624444),  Route carried "on" structure: County highway 189,  Year Built: 1970,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 55 (year 2011),  Average Future Daily Traffic: 75 (year 2029),  Features Intersected: SANDY CRK #28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 91470AA0214001,  Location: 2.1 MI EAST OF SH 171 (Lat: 31.766689,  Lng: -96.602031),  Route carried "on" structure: County highway 214,  Year Built: 2010,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 70 (year 2034),  Features Intersected: ELM CREEK TRIB #31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.380,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Discuss Coolidge, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.