Bridge Statistics for Copan, Oklahoma (OK)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 157ft / 48.4mTotal length
  • $19,952,000Total costs
  • 27,455Total average daily traffic
  • 1,997Total average daily truck traffic
  • 38,797Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Copan
  • No street view available for this location

New bridges in Copan, OK - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11950-1959
  • 71970-1979
  • 21990-1999
  • 52000-2009
  • 22010-2019
Average Bridge Daily Traffic in Copan, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Excellent
  • 12.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Excellent
  • 37.5%Very good
  • 12.5%Good
  • 12.5%Satisfactory
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.6%Excellent
  • 33.3%Very good
  • 22.2%Good
  • 27.8%Satisfactory
  • 11.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 30.0%Very good
  • 10.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 8726,  Location: .2 W 1.8 N OF US 75 (Lat: 36.929072,  Lng: -95.919961),  Route carried "on" structure: County highway N3978,  Year Built: 1940,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 15,  Features Intersected: POOLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.78m (12.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $307,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13554,  Location: 3.1 E 8. N OF US 60 (Lat: 36.858456,  Lng: -95.876319),  Route carried "on" structure: County highway 7412C,  Year Built: 1956,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 443 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 709 (year 2040),  Design Load: H 15,  Features Intersected: POST OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.213,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17705,  Location: 3. W 3.7 N OF US 75 (Lat: 36.950275,  Lng: -95.967297),  Route carried "on" structure: County highway N3940,  Year Built: 1970,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: LAKE COPAN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1781,  Location: 14.4 MI N JCT US 60 E (Lat: 36.928467,  Lng: -95.917203),  Route carried "on" structure: US 75,  Year Built: 1970,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 6,300 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,080 (year 2040),  Design Load: HS 20,  Features Intersected: POOLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.751,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $627,000,  Roadway Improvement Cost: $1,035,000,  Total Project Cost: $1,756,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 17852,  Location: 9.9 MI N JCT US 60 E (Lat: 36.873017,  Lng: -95.933842),  Route carried "on" structure: US 75,  Year Built: 1970,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 8,800 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,080 (year 2040),  Design Load: HS 20,  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.058,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,042,000,  Roadway Improvement Cost: $1,719,000,  Total Project Cost: $2,918,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 1875,  Location: 2.4 W 3. S OF US 75 (Lat: 36.858333,  Lng: -95.957778),  Route carried "on" structure: County highway 7410C,  Year Built: 1974,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 227 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 363 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE CANEY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.919,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 68.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.95m (29.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $457,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $712,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19491,  Location: 14.6 MI N US 60 E (Lat: 36.935069,  Lng: -95.917581),  Route carried "on" structure: US 75,  Year Built: 1978,  Status: Open,  Structure Length: 7.39m (24.25ft),  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,880 (year 2040),  Design Load: HL 93,  Features Intersected: COTTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.831,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.8m (81.4ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.95m (32.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,277,000,  Roadway Improvement Cost: $2,107,000,  Total Project Cost: $3,575,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 19492,  Location: 14.6 MI N US 60 E (Lat: 36.935069,  Lng: -95.917983),  Route carried "on" structure: US 75,  Year Built: 1978,  Status: Open,  Structure Length: 7.39m (24.25ft),  Average Daily Traffic: 3,250 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,200 (year 2040),  Design Load: HL 93,  Features Intersected: COTTON CREEK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 37.831,  Lanes on structure: 2,  Base Highway Network: Yes (,  Subroute: 8),  Owner: State Highway Agency,  Approaching Roadway Width: 12.4m (40.7ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.8m (81.4ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.95m (32.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,277,000,  Roadway Improvement Cost: $2,107,000,  Total Project Cost: $3,575,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 24046,  Location: 1.1 M W & 0.1 M S 75& 10 (Lat: 36.901950,  Lng: -95.935011),  Route carried "on" structure: County highway N3970,  Year Built: 1994,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.22m (10.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 24189,  Location: 3.4 N 1.6 E OF US 75 (Lat: 36.947225,  Lng: -95.883858),  Route carried "on" structure: County highway N3986,  Year Built: 1998,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: COTTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.21m (23.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $589,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 25627,  Location: 1. S .2 E OF US 75 (Lat: 36.887533,  Lng: -95.913381),  Route carried "on" structure: County highway E0090,  Year Built: 2001,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 78.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $665,000,  Total Project Cost: $1,275,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 26144,  Location: 2. E 7.7 N OF US 60 (Lat: 36.853575,  Lng: -95.899031),  Route carried "on" structure: County highway N3990,  Year Built: 2002,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: POST OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $774,000,  Roadway Improvement Cost: $878,000,  Total Project Cost: $1,677,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 27553,  Location: 1E 1.5N OF U.S. 75 (Lat: 36.923867,  Lng: -95.898936),  Route carried "on" structure: County highway N3990,  Year Built: 2005,  Status: Open,  Structure Length: 2.36m (7.74ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: POOLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 87.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $660,000,  Total Project Cost: $1,120,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28228,  Location: 1.8S .6W JCT US75/SH10E (Lat: 36.875944,  Lng: -95.927967),  Route carried "on" structure: County highway E0098,  Year Built: 2007,  Status: Open,  Structure Length: 2.82m (9.25ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 61.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $547,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 28659,  Location: 3M.S 3M.E OF US-75/SH-10 (Lat: 36.858611,  Lng: -95.911667),  Route carried "on" structure: County highway E0110,  Year Built: 2009,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 675 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,080 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.85m (9.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 31007,  Location: 1.2S OF HWY 10 (Lat: 36.884367,  Lng: -95.898633),  Route carried "on" structure: County highway N3990,  Year Built: 2013,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Total Project Cost: $225,000
Find on map >>   Show street view

Structure Number: 31262,  Location: 2E 1.3N OF HWY US75/SH10 (Lat: 36.919222,  Lng: -95.880944),  Route carried "on" structure: County highway N4000,  Year Built: 2014,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Total Project Cost: $225,000,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: CEPSWTOKCOPANSP,  Location: 2.5 MI. W. OF COPAN (Lat: 36.885561,  Lng: -95.974561),  Route carried "on" structure: State highway 10,  Year Built: 1978,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 660 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 805 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: COPAN L CANEY R SPLWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Corps of Engineers (Civil),  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.6m (51.2ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.89m (42.29ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $551,000,  Total Project Cost: $551,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place