Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cordry Sweetwater Lakes, Indiana (IN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 59ft / 17.6mTotal length
  • $850,000Total costs
  • 3,275Total average daily traffic
  • 170Total average daily truck traffic
  • 4,625Total future (year 2041) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cordry Sweetwater Lakes
  • No street view available for this location

New bridges in Cordry Sweetwater Lakes, IN - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 71960-1969
  • 11970-1979
  • 11990-1999
Reconstructed bridges in Cordry Sweetwater Lakes, IN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 12000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 30.8%Good
  • 38.5%Satisfactory
  • 23.1%Fair
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 15.4%Good
  • 38.5%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 7.7%Good
  • 46.2%Satisfactory
  • 38.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Good
  • 61.5%Satisfactory
  • 23.1%Fair
  • 7.7%Poor
Find on map >>   Show street view

Structure Number: 700013,  Location: 0.1 MI W OF SWEETWATER TR (Lat: 39.261881,  Lng: -86.145650),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Posted for load,  Structure Length: 2.21m (7.25ft),  Average Daily Traffic: 625 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 875 (year 2041),  Design Load: HS 20,  Features Intersected: NORTH FORK OF SALT CREEK,  Facility Carried by Structure: GATESVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.0m (32.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 41.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $100,000,  Total Project Cost: $100,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 700015,  Location: 0 MI. E OF SWEETWATER TR. (Lat: 39.261800,  Lng: -86.143311),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 2.06m (6.76ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 400 (year 2041),  Design Load: HS 20,  Features Intersected: SWEETWATER CREEK,  Facility Carried by Structure: HOOVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 700037,  Location: 1.3 MI N PUMPKIN RIDGE RD (Lat: 39.247569,  Lng: -86.099300),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 275 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2041),  Design Load: HS 20,  Features Intersected: BR EAST FK SALT CREEK,  Facility Carried by Structure: HOOVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.6m (54.5ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 700046,  Location: 0.8 MI. N. PUMPKIN RDG RD (Lat: 39.243069,  Lng: -86.094369),  Route carried "on" structure: County highway ,  Year Built: 1934,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 400 (year 2041),  Features Intersected: EAST FORK SALT CREEK,  Facility Carried by Structure: HOOVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 14.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 700047,  Location: 1.1MI E OF SWEETWATER TRL (Lat: 39.262100,  Lng: -86.124731),  Route carried "on" structure: County highway ,  Year Built: 1931,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 275 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 400 (year 2041),  Features Intersected: BR OF EAST FK SALT CREEK,  Facility Carried by Structure: HOOVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $300,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 700049,  Location: 00.00 W UP SALT CR ROAD (Lat: 39.282169,  Lng: -86.165950),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 725 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,000 (year 2041),  Design Load: HS 20,  Features Intersected: NORTH FORK OF SALT CREEK,  Facility Carried by Structure: SPRUNICA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 51.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 70005,  Location: 0.1 MI E OF UP SALT CR RD (Lat: 39.268750,  Lng: -86.165411),  Route carried "on" structure: County highway ,  Year Built: 1934,  Year Reconstructed: 2012,  Status: Posted for load,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 100 (year 2021),  Average Future Daily Traffic: 150 (year 2041),  Features Intersected: NORTH FORK OF SALT CREEK,  Facility Carried by Structure: PETRO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 41.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 700064,  Location: 0.9 MI. W. SWEETWATER TRL (Lat: 39.286331,  Lng: -86.124881),  Route carried "on" structure: County highway ,  Year Built: 1925,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 75 (year 2041),  Features Intersected: E BRANCH SWEETWATER CREE,  Facility Carried by Structure: MOUNT MORIAH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 700078,  Location: 0.1 MI. W. SWEETWATER TRL (Lat: 39.304661,  Lng: -86.202000),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 150 (year 2041),  Design Load: H 15,  Features Intersected: BEAN BLOSSOM CREEK,  Facility Carried by Structure: BELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 700079,  Location: 00.00 W UP SALT CR ROAD (Lat: 39.308400,  Lng: -86.166300),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 150 (year 2041),  Design Load: HS 20,  Features Intersected: NORTH FORK OF SALT CREEK,  Facility Carried by Structure: WEBBER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $150,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 70008,  Location: 1.2 MI E OF BELLSVILLE PK (Lat: 39.287839,  Lng: -86.120250),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 75 (year 2041),  Design Load: HS 20,  Features Intersected: FORK EAST BR SWEETWATER,  Facility Carried by Structure: MOUNT MORIAH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 67.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 700081,  Location: 0.2 MI. S. HAMILTON CR RD (Lat: 39.311031,  Lng: -86.164950),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 250 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH OF N FORK SALT CR,  Facility Carried by Structure: UPPER SALT CR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 85.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 700087,  Location: .4 MI. S. OF SPRUNICA RD. (Lat: 39.276911,  Lng: -86.166039),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 125 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 200 (year 2041),  Design Load: HS 20,  Features Intersected: NORTH FORK OF SALT CREEK,  Facility Carried by Structure: UPPER SALT CR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 63.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Cordry Sweetwater Lakes, Indiana (IN) on our hugely popular Indiana forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.