Bridge Statistics for Cottonwood, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 105ft / 31.6mTotal length
  • $11,065,000Total costs
  • 11,997Total average daily traffic
  • 1,407Total average daily truck traffic
  • 18,675Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cottonwood
  • No street view available for this location

New bridges in Cottonwood, AL - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11950-1959
  • 41960-1969
  • 61980-1989
  • 21990-1999
  • 12010-2019
Average Bridge Truck Traffic in Cottonwood, AL
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 80.0%Good
  • 20.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 80.0%Good
  • 20.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Excellent
  • 6.7%Very good
  • 73.3%Good
  • 13.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Very good
  • 70.0%Good
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 1398,  Location: 1.1 MI S JCT US 72 (Lat: 34.625211,  Lng: -86.330389),  Route carried "on" structure: County highway 5,  Year Built: 1936,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 370 (year 1989),  Truck Traffic: 2%,  Average Future Daily Traffic: 495 (year 2039),  Design Load: H 10,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $337,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6354,  Location: US 84 TO COTTONWOOD (Lat: 31.056050,  Lng: -85.277028),  Route carried "on" structure: County highway 77,  Year Built: 1958,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 260 (year 1993),  Truck Traffic: 7%,  Average Future Daily Traffic: 475 (year 2033),  Features Intersected: GUM SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.27m (4.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $257,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8374,  Location: COTTONWOOD TO HENRY CO (Lat: 31.263414,  Lng: -85.225753),  Route carried "on" structure: County highway 55,  Year Built: 1964,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 535 (year 1993),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,500 (year 2033),  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $472,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9093,  Location: US 84 TO CO RD 4 (Lat: 31.090297,  Lng: -85.324667),  Route carried "on" structure: County highway 33,  Year Built: 1966,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 576 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 800 (year 2033),  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $435,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9476,  Location: AL 53 TO CO RD 81 (Lat: 31.055111,  Lng: -85.241464),  Route carried "on" structure: County highway 81,  Year Built: 1966,  Status: Open,  Structure Length: 0.66m (2.17ft),  Average Daily Traffic: 320 (year 1993),  Truck Traffic: 7%,  Average Future Daily Traffic: 600 (year 2033),  Features Intersected: GUY BRANCH,  Facility Carried by Structure: HICKORY GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 39.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $277,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9759,  Location: AL 53 TO CO RD 81 (Lat: 31.052694,  Lng: -85.272703),  Route carried "on" structure: County highway 81,  Year Built: 1968,  Status: Open,  Structure Length: 1.50m (4.92ft),  Average Daily Traffic: 295 (year 1993),  Truck Traffic: 15%,  Average Future Daily Traffic: 530 (year 2033),  Features Intersected: GUM SLOUGH BRANCH,  Facility Carried by Structure: HICKORY GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.18m (7.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $465,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $512,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12405,  Location: ST MARY CH RD TO CWOOD (Lat: 31.070333,  Lng: -85.320817),  Route carried "on" structure: County highway 77,  Year Built: 1980,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 235 (year 1993),  Truck Traffic: 8%,  Average Future Daily Traffic: 850 (year 2033),  Design Load: HS 20,  Features Intersected: BUCK CREEK,  Facility Carried by Structure: FLETCHER SMITH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $615,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $677,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12406,  Location: ST MARY CH RD TO CWOOD (Lat: 31.070233,  Lng: -85.319119),  Route carried "on" structure: County highway 77,  Year Built: 1980,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 231 (year 1992),  Truck Traffic: 7%,  Average Future Daily Traffic: 900 (year 2033),  Design Load: HS 20,  Features Intersected: BUCK CREEK,  Facility Carried by Structure: FLETCHER SMITH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $615,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $677,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13328,  Location: 4.3 MI. N. FLA. LINE (Lat: 31.034350,  Lng: -85.262367),  Route carried "on" structure: State highway 53,  Year Built: 1985,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,820 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,366 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.898,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 82.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $436,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $480,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13329,  Location: 4.9 MI. N. FLA. LINE (Lat: 31.038017,  Lng: -85.270400),  Route carried "on" structure: State highway 53,  Year Built: 1985,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,820 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,366 (year 2033),  Design Load: HS 20,  Features Intersected: GUM SLOUGH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.815,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $802,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $882,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13967,  Location: COTTONWOOD TO HENRY CO (Lat: 31.059917,  Lng: -85.298656),  Route carried "on" structure: County highway 55,  Year Built: 1986,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,220 (year 1993),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,620 (year 2033),  Design Load: HS 20,  Features Intersected: BOGGY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1398,  Location: AL 53 TO CO RD 81 (Lat: 31.053392,  Lng: -85.294244),  Route carried "on" structure: County highway 77,  Year Built: 1986,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 395 (year 1993),  Truck Traffic: 9%,  Average Future Daily Traffic: 700 (year 2033),  Design Load: HS 20,  Features Intersected: BOGGY CREEK,  Facility Carried by Structure: GROVE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $611,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $672,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15196,  Location: IN COTTONWOOD (Lat: 31.044867,  Lng: -85.294950),  Route carried "on" structure: State highway 53,  Year Built: 1990,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 2,150 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,795 (year 2033),  Design Load: HS 20,  Features Intersected: BOGGY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.359,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $825,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17064,  Location: ASHFORD TO COTTONWOOD (Lat: 31.105617,  Lng: -85.254558),  Route carried "on" structure: County highway 55,  Year Built: 1997,  Status: Open,  Structure Length: 11.40m (37.40ft),  Average Daily Traffic: 775 (year 1996),  Truck Traffic: 30%,  Average Future Daily Traffic: 1,200 (year 2033),  Features Intersected: COWARTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.27m (40.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,525,000,  Roadway Improvement Cost: $253,000,  Total Project Cost: $2,778,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2152,  Location: _ (Lat: 31.048983,  Lng: -85.314217),  Route carried "on" structure: County highway 55,  Year Built: 2019,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 995 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 1,478 (year 2040),  Features Intersected: _STATE LINE RD,  Facility Carried by Structure: _BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,270,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,397,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Other