Bridge Statistics for Crawford, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 135ft / 41.0mTotal length
  • $35,649,000Total costs
  • 31,106Total average daily traffic
  • 2,357Total average daily truck traffic
  • 37,593Total future (year 2035) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Crawford
  • No street view available for this location

New bridges in Crawford, NY - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 31950-1959
  • 21960-1969
  • 11970-1979
  • 21990-1999
  • 32000-2009
  • 32010-2019
Average Bridge Daily Traffic in Crawford, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 58.3%Good
  • 25.0%Satisfactory
  • 8.3%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Excellent
  • 30.8%Very good
  • 23.1%Good
  • 7.7%Satisfactory
  • 15.4%Fair
  • 7.7%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Excellent
  • 15.4%Very good
  • 30.8%Good
  • 23.1%Satisfactory
  • 15.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 31.3%Good
  • 43.8%Satisfactory
  • 18.8%Fair
  • 6.3%Poor
Find on map >>   Show street view

Structure Number: 101448,  Location: 0.5 MI W JCT RTS 17K+302 (Lat: 41.543972,  Lng: -74.370728),  Route carried "on" structure: State highway 17K,  Year Built: 1958,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 4,379 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,399 (year 2040),  Design Load: HS 15,  Features Intersected: PAKANASINK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.374,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $436,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101449,  Location: 1.1 MI E JCT SH17K &SH302 (Lat: 41.538711,  Lng: -74.341550),  Route carried "on" structure: State highway 17K,  Year Built: 1959,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,785 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,802 (year 2040),  Design Load: H 20,  Features Intersected: DWAAR KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.884,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $482,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 102666,  Location: JCT RT 52/SHAWANGUNK KILL (Lat: 41.611469,  Lng: -74.304814),  Route carried "on" structure: State highway 52,  Year Built: 2000,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 7,129 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,660 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SHAWANGUNK KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.7m (136.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.44m (27.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,458,000,  Roadway Improvement Cost: $2,611,000,  Total Project Cost: $7,069,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102667,  Location: 2.2 MI E JCT RTS 52+302 (Lat: 41.594078,  Lng: -74.268628),  Route carried "on" structure: State highway 52,  Year Built: 2017,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 4,716 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,728 (year 2040),  Design Load: HL 93,  Features Intersected: DWAAR KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.701,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $478,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $758,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222316,  Location: 1.3 MI NE THOMPSON RIDGE (Lat: 41.587444,  Lng: -74.324936),  Route carried "on" structure: Other road ,  Year Built: 1928,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 199 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 279 (year 2037),  Features Intersected: PAKANASINK CREEK,  Facility Carried by Structure: BRUYN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Critical,  Superstructure: Serious,  Substructure: Poor,  Channel: Poor,  Operating Rating: 18.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $447,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $709,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222317,  Location: 1.2 MI NORTH OF BULLVILLE (Lat: 41.555767,  Lng: -74.365578),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 742 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,039 (year 2040),  Design Load: HS 20,  Features Intersected: PAKANASINK CREEK,  Facility Carried by Structure: BURLINGHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.009,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 81.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $502,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $797,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334434,  Location: 2.0 MI NE BLOOMINGBURGH (Lat: 41.572833,  Lng: -74.409939),  Route carried "on" structure: Other road ,  Year Built: 2010,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 540 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 756 (year 2035),  Design Load: HL 93,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: PETTICOATE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $2,618,000,  Roadway Improvement Cost: $1,533,000,  Total Project Cost: $4,151,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334436,  Location: 2.7 MI NW THOMPSON RIDGE (Lat: 41.586383,  Lng: -74.377972),  Route carried "on" structure: County highway ,  Year Built: 1965,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 837 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,172 (year 2040),  Design Load: HL 93,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: COUNTY ROAD 48
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.425,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.39m (17.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,165,000,  Roadway Improvement Cost: $1,268,000,  Total Project Cost: $3,433,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334437,  Location: 1.0 MI W JCT RTS 52 & 302 (Lat: 41.602067,  Lng: -74.326500),  Route carried "on" structure: Other road ,  Year Built: 1921,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 810 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,134 (year 2040),  Design Load: HS 20,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: ULSTERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.738,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $1,976,000,  Roadway Improvement Cost: $1,157,000,  Total Project Cost: $3,133,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334438,  Location: 07 MI N OF PINE BUSH (Lat: 41.618947,  Lng: -74.293867),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 1,230 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,722 (year 2040),  Design Load: HS 20,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: HARDENBURG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.4m (122.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,160,000,  Roadway Improvement Cost: $1,265,000,  Total Project Cost: $3,425,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334439,  Location: 1.9 MI NE OF PINE BUSH (Lat: 41.628150,  Lng: -74.272344),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 1,581 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,213 (year 2035),  Design Load: HS 20,  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: WALLKILL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.32m (14.17ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $3,253,000,  Roadway Improvement Cost: $1,905,000,  Total Project Cost: $5,158,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33444,  Location: 1.3 MI SE THOMPSON RIDGE (Lat: 41.561792,  Lng: -74.309028),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,291 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,807 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: DWAAR KILL,  Facility Carried by Structure: COLLABAR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.475,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 68.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $575,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334442,  Location: 0.8 MI W JCT RTS 52+302 (Lat: 41.600783,  Lng: -74.322817),  Route carried "on" structure: Other road ,  Year Built: 1951,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 862 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,207 (year 2040),  Design Load: HS 20,  Features Intersected: PAKANASINK CREEK,  Facility Carried by Structure: ULSTERVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.416,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $610,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $968,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334443,  Location: 1.9 MI SE THOMPSON RIDGE (Lat: 41.566267,  Lng: -74.295614),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,051 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,471 (year 2040),  Features Intersected: DWAAR KILL,  Facility Carried by Structure: COUNTY ROAD 17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.749,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $408,000,  Total Project Cost: $1,104,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334444,  Location: 2.3 MI SE PINE BUSH (Lat: 41.587472,  Lng: -74.268283),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,486 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,549 (year 2040),  Design Load: HS 20,  Features Intersected: DWAAR KILL,  Facility Carried by Structure: HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.915,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,062,000,  Roadway Improvement Cost: $622,000,  Total Project Cost: $1,684,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336017,  Location: 2.2 MI NW THOMPSON RIDGE (Lat: 41.598619,  Lng: -74.349353),  Route carried "on" structure: Other road ,  Year Built: 1975,  Year Reconstructed: 2017,  Status: Posted for load,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 468 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 655 (year 2040),  Features Intersected: SHAWANGUNK KILL,  Facility Carried by Structure: CRAWFORD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.912,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 9.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $1,115,000,  Roadway Improvement Cost: $653,000,  Total Project Cost: $1,767,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other