Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cross Lanes, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 92ft / 27.8mTotal length
  • $950,000Total costs
  • 62,586Total average daily traffic
  • 12,051Total average daily truck traffic
  • 76,264Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cross Lanes
  • No street view available for this location

New bridges in Cross Lanes, WV - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 31980-1989
  • 61990-1999
  • 22020-2022
Average Bridge Daily Traffic in Cross Lanes, WV
Average Bridge Truck Traffic in Cross Lanes, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Very good
  • 27.3%Good
  • 36.4%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Very good
  • 27.3%Good
  • 36.4%Satisfactory
  • 9.1%Fair
  • 9.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 36.4%Very good
  • 45.5%Good
  • 9.1%Satisfactory
  • 9.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 41.7%Good
  • 25.0%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 20A013,  Location: 0.01 MI N OF WV 622 (Lat: 38.455419,  Lng: -81.723231),  Route carried "on" structure: County highway 705,  Year Built: 1993,  Status: Open,  Structure Length: 4.06m (13.32ft),  Average Daily Traffic: 500 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 610 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: ROCKY FORK OF POCA RIVER,  Facility Carried by Structure: COUNTY ROAD 7/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A014,  Location: 0.04 MI S OF CR 21/10 (Lat: 38.439431,  Lng: -81.716150),  Route carried "on" structure: County highway 78,  Year Built: 1989,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 350 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 427 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: FISHER BRANCH,  Facility Carried by Structure: CR 7/8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.331,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A295,  Location: 0.17 MI N OF CR 7/9 (Lat: 38.443081,  Lng: -81.726981),  Route carried "on" structure: State highway 622,  Year Built: 1988,  Status: Open,  Structure Length: 3.22m (10.56ft),  Average Daily Traffic: 2,800 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,996 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ROCKY FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.990,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.0m (49.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A299,  Location: 0.01 MI N OF WV 622 (Lat: 38.471431,  Lng: -81.716989),  Route carried "on" structure: County highway 703,  Year Built: 1993,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 101 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 123 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: POCATALICO RIVER,  Facility Carried by Structure: COUNTY ROUTE 7/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A378,  Location: 0.49 MI E OF WV 622 (Lat: 38.409289,  Lng: -81.793431),  Route carried "on" structure: Interstate 64,  Year Built: 1965,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 56,000 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 68,320 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ROCKY FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.136,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 33 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.4m (14.4ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $100,000,  Total Project Cost: $100,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 20A564,  Location: 0.09 MI E OF WV 622 (Lat: 38.431489,  Lng: -81.737861),  Route carried "on" structure: County highway 711,  Year Built: 1980,  Status: Posted for load,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 20 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 24 (year 2038),  Design Load: HS 20,  Features Intersected: ROCKY FORK CREEK,  Facility Carried by Structure: COUNTY ROUTE 7/11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $350,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20A676,  Location: 0.08 MI S OF CR 5/3 (Lat: 38.425411,  Lng: -81.752369),  Route carried "on" structure: County highway 513,  Year Built: 1991,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 122 (year 2039),  Features Intersected: ROCKY FORK CREEK,  Facility Carried by Structure: COUNTY ROUTE 5/13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20A793,  Location: 0.15 MI E OF CR 5/2 (Lat: 38.427061,  Lng: -81.769511),  Route carried "on" structure: Other road 9026,  Year Built: 1990,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 20 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 25 (year 2040),  Features Intersected: ROCKY FORK,  Facility Carried by Structure: HARP RD 902/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 2.4m (7.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 3.1m (10.2ft),  Out-to-Out Width: 3.1m (10.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 40A046,  Location: 0.31 MI E OF CR 38/3 (Lat: 38.491731,  Lng: -81.741239),  Route carried "on" structure: County highway 3800,  Year Built: 1993,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 205 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 267 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: HARMONS CREEK,  Facility Carried by Structure: CR 38
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.256,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40A108,  Location: 0.04 MI W OF CR 38/3 (Lat: 38.487331,  Lng: -81.740881),  Route carried "on" structure: County highway 38,  Year Built: 1993,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,608 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HARMONS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.693,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40A171,  Location: 0.03 MI N OF CR 31 (Lat: 38.476619,  Lng: -81.736711),  Route carried "on" structure: County highway 381,  Year Built: 2020,  Status: Open,  Structure Length: 5.93m (19.46ft),  Average Daily Traffic: 90 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 122 (year 2040),  Design Load: HL 93,  Features Intersected: POCATALICO RIVER,  Facility Carried by Structure: CR 38/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40A172,  Location: 0.01 MI W OF CR 38/1 (Lat: 38.483989,  Lng: -81.739500),  Route carried "on" structure: County highway 38,  Year Built: 2020,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,620 (year 2040),  Design Load: HL 93,  Features Intersected: HARMONS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.355,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Cross Lanes, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.