Bridge Statistics for Croton-on-Hudson, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 305ft / 93.1mTotal length
  • $77,072,000Total costs
  • 284,441Total average daily traffic
  • 8,000Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Croton-on-Hudson
  • No street view available for this location

New bridges in Croton-on-Hudson, NY - historical statistics
  • New bridges - historical statistics
  • 101960-1969
  • 11980-1989
  • 61990-1999
Average Bridge Daily Traffic in Croton-on-Hudson, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 22.2%Very good
  • 22.2%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 22.2%Good
  • 55.6%Satisfactory
Find on map >>   Show street view

Structure Number: 1004971,  Location: 1.2 MI S JCT RTS 9 & 129 (Lat: 41.187231,  Lng: -73.874344),  Route carried "on" structure: US 9,  Year Built: 1998,  Status: Open,  Structure Length: 14.78m (48.49ft),  Average Daily Traffic: 21,347 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 30,113 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CROTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.405,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 0.0m,  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.78m (48.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $10,708,000,  Roadway Improvement Cost: $6,271,000,  Total Project Cost: $16,979,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1004972,  Location: 1.2 MI S JCT RTS 9 & 129 (Lat: 41.188139,  Lng: -73.875392),  Route carried "on" structure: Interstate 9,  Year Built: 1998,  Status: Open,  Structure Length: 14.78m (48.49ft),  Average Daily Traffic: 21,347 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 30,113 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CROTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.470,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.78m (48.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $8,532,000,  Roadway Improvement Cost: $4,997,000,  Total Project Cost: $13,529,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1004989,  Location: 0.8 MI S JCT RTS 9+129 (Lat: 41.192975,  Lng: -73.882050),  Route carried "on" structure: US 9,  Year Built: 1964,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 35,965 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 50,735 (year 2040),  Design Load: H 20,  Features Intersected: RTE 9A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.306,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.6m (97.1ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 22.1m (72.5ft),  Out-to-Out Width: 23.6m (77.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.93m (16.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,650,000,  Roadway Improvement Cost: $2,723,000,  Total Project Cost: $7,373,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1004991,  Location: JCT RTS 9+129 (Lat: 41.201469,  Lng: -73.887961),  Route carried "on" structure: US 9,  Year Built: 1963,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 17,983 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,368 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 129
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.400,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $1,039,000,  Total Project Cost: $2,812,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1004992,  Location: JCT RTS 9+129 (Lat: 41.201572,  Lng: -73.887839),  Route carried "on" structure: US 9,  Year Built: 1963,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 17,983 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,368 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 129
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.400,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,774,000,  Roadway Improvement Cost: $1,039,000,  Total Project Cost: $2,812,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 100501,  Location: .7 MI N JCT US 9 & SH 129 (Lat: 41.209542,  Lng: -73.896300),  Route carried "on" structure: Other road ,  Year Built: 1962,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 829 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,007 (year 2040),  Design Load: HS 20,  Features Intersected: 9 9 87032173 SB, Ramp,,  Facility Carried by Structure: SENASQUA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.31m (23.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,508,000,  Roadway Improvement Cost: $2,055,000,  Total Project Cost: $5,563,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 100502,  Location: 2.0 MI N JCT RTS 9+129 (Lat: 41.222169,  Lng: -73.912306),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 138 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 193 (year 2037),  Design Load: HS 20,  Features Intersected: 9 9 87032186 SB, RTE 9,  Facility Carried by Structure: WARREN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.24m (17.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,390,000,  Roadway Improvement Cost: $1,400,000,  Total Project Cost: $3,790,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 227005,  Location: .5 MI SW JCT SH9A & MAPLE (Lat: 41.198669,  Lng: -73.887117),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 345 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 483 (year 2036),  Design Load: HS 20,  Features Intersected: MNRR HU LINE,  Facility Carried by Structure: HALFMOON BAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,923,000,  Roadway Improvement Cost: $1,126,000,  Total Project Cost: $3,049,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33479,  Location: IN CROTON-ON-HUDSON (Lat: 41.191092,  Lng: -73.884792),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 32.74m (107.41ft),  Average Daily Traffic: 3,323 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,111 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: YARD ROAD, MNRR HU LINE,,  Facility Carried by Structure: CROTON POINT AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: Railroad,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.73m (107.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $13,349,000,  Roadway Improvement Cost: $7,817,000,  Total Project Cost: $21,165,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1004989,  Location: 0.8 MI S JCT RTS 9+129 (Lat: 41.192975,  Lng: -73.882050),  Route carried "under" structure: State highway 9A,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 30,958 (year 2000),  Features Intersected: RTE 9A,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 6.12m (20.08ft),  Kilometerpoint: 26.130,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 1004991,  Location: JCT RTS 9+129 (Lat: 41.201469,  Lng: -73.887961),  Route carried "under" structure: Ramp State highway 129,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,899 (year 2002),  Features Intersected: RTE 129,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>   Show street view

Structure Number: 1004992,  Location: JCT RTS 9+129 (Lat: 41.201572,  Lng: -73.887839),  Route carried "under" structure: Ramp State highway 129,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,899 (year 2002),  Features Intersected: RTE 129,  Facility Carried by Structure: RTE 9
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 100501,  Location: .7 MI N JCT US 9 & SH 129 (Lat: 41.209542,  Lng: -73.896300),  Route carried "under" structure: US 9,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 38,475 (year 1999),  Features Intersected: 9 9 87032173 SB, Ramp,,  Facility Carried by Structure: SENASQUA ROAD
Minimum Vertical Clearance: 5.71m (18.73ft),  Kilometerpoint: 27.868,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>   Show street view

Structure Number: 100502,  Location: 2.0 MI N JCT RTS 9+129 (Lat: 41.222169,  Lng: -73.912306),  Route carried "under" structure: US 9,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 38,475 (year 1999),  Features Intersected: 9 9 87032186 SB, RTE 9,  Facility Carried by Structure: WARREN RD
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 29.992,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 226866,  Location: 1.7 MI N OF US9 / CROTON (Lat: 41.205717,  Lng: -73.892669),  Route carried "under" structure: US 9,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 38,475 (year 1999),  Features Intersected: 9 9 87032170 NB, RTE 9,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 7.99m (26.21ft),  Kilometerpoint: 27.353,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.2m (118.8ft)

Find on map >>   Show street view

Structure Number: 226866,  Location: 1.7 MI N OF US9 / CROTON (Lat: 41.205717,  Lng: -73.892669),  Route carried "under" structure: US ,  Year Built: 1998,  Structure Length: 0. m,  Features Intersected: 9 9 87032170 NB, RTE 9,  Facility Carried by Structure: PEDESTRIAN BRIDGE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 27.353,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.2m (118.8ft)

Find on map >>   Show street view

Structure Number: 33479,  Location: IN CROTON-ON-HUDSON (Lat: 41.191092,  Lng: -73.884792),  Route carried "under" structure: Other road ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: YARD ROAD, MNRR HU LINE,,  Facility Carried by Structure: CROTON POINT AVE
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.1m (148.0ft)