Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Croydon, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 325ft / 98.6mTotal length
  • $8,050,000Total costs
  • 576,634Total average daily traffic
  • 42,031Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Croydon
  • No street view available for this location

New bridges in Croydon, PA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 181960-1969
  • 11980-1989
  • 41990-1999
Reconstructed bridges in Croydon, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 21980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Croydon, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 36.4%Good
  • 45.5%Satisfactory
  • 18.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 9.1%Good
  • 27.3%Satisfactory
  • 54.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Good
  • 45.5%Satisfactory
  • 27.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Fair
  • 50.0%Poor
Find on map >>   Show street view

Structure Number: 6843,  Location: 1MI.N.EDDINGTON 42B12 (Lat: 40.092400,  Lng: -74.919972),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 44,372 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 48,073 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BRISTOL PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.442,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 40.5m (132.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $66,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $893,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6845,  Location: 1MI.N.EDDINGTON 42B12 (Lat: 40.092264,  Lng: -74.920572),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Status: Open,  Structure Length: 8.93m (29.30ft),  Average Daily Traffic: 44,587 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,759 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BRISTOL PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.408,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 15 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 41.5m (136.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $205,000,  Total Project Cost: $940,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6846,  Location: 1MI.N.EDDINGTON 42B12 (Lat: 40.094744,  Lng: -74.918097),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 44,587 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,759 (year 2032),  Design Load: HS 20,  Features Intersected: MAPLE AVENUE (T454)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.408,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $429,000,  Total Project Cost: $1,137,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6849,  Location: 1MI.S.CROYDON 42D11 (Lat: 40.101786,  Lng: -74.908156),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 44,372 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 48,073 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: KLECKNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.055,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 685,  Location: 1MI.S.CROYDON 42D11 (Lat: 40.101983,  Lng: -74.908381),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Year Reconstructed: 1981,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 44,587 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,759 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: KLECKNER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.018,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6851,  Location: CROYDON 42E10 (Lat: 40.104242,  Lng: -74.902072),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Status: Open,  Structure Length: 18.14m (59.51ft),  Average Daily Traffic: 44,372 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 48,073 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NESHAMINY CR & SR 2027
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.771,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.10m (59.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $527,000,  Total Project Cost: $2,417,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6854,  Location: CROYDON 42E10 (Lat: 40.104622,  Lng: -74.901661),  Route carried "on" structure: Interstate 95,  Year Built: 1964,  Status: Open,  Structure Length: 18.14m (59.51ft),  Average Daily Traffic: 44,587 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,759 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NESHAMINY CR & APPL 276
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.798,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Poor,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.10m (59.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $527,000,  Total Project Cost: $2,417,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7156,  Location: 2MI.TO BRISTOL 46C01 (Lat: 40.084803,  Lng: -74.911117),  Route carried "on" structure: State highway ,  Year Built: 1939,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 9,139 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,547 (year 2032),  Design Load: HS 20,  Features Intersected: NESHAMINY CREEK,  Facility Carried by Structure: STATE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.870,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.60m (34.78ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: November 2016,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $246,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7167,  Location: .2MI.N.STATE ROAD 46C01 (Lat: 40.086575,  Lng: -74.915328),  Route carried "on" structure: State highway ,  Year Built: 1985,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,577 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,809 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: BR.NESHAMINY CREEK,  Facility Carried by Structure: TOTEM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.389,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Inventory Rating: 79.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7765,  Location: BRISTOL INTERCH. 42F09 (Lat: 40.110472,  Lng: -74.891361),  Route carried "on" structure: Ramp State highway ,  Year Built: 1969,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 13.75m (45.11ft),  Average Daily Traffic: 9,432 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,114 (year 2032),  Design Load: HS 20,  Features Intersected: INTERSTATE 95,  Facility Carried by Structure: RAMP A SOUTHBOUND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 47.9m (157.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.50m (47.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 40186,  Location: KEYSTONE INDST.PK. 42F09 (Lat: 40.109758,  Lng: -74.892461),  Route carried "on" structure: Ramp State highway ,  Year Built: 1999,  Status: Open,  Structure Length: 14.17m (46.49ft),  Average Daily Traffic: 4,784 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,581 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: RAMP A;INTERSTATE 95,  Facility Carried by Structure: RAMP D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 50.6m (166.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 15.10m (49.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6843,  Location: 1MI.N.EDDINGTON 42B12 (Lat: 40.092400,  Lng: -74.919972),  Route carried "under" structure: US 13,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 15,097 (year 2021),  Truck Traffic: 7%,  Features Intersected: BRISTOL PIKE,  Facility Carried by Structure: INTERSTATE 95 (NB)
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 5.813,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 6844,  Location: 1MI.N.EDDINGTON 42B12 (Lat: 40.094378,  Lng: -74.918017),  Route carried "under" structure: State highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 850 (year 1980),  Truck Traffic: 7%,  Features Intersected: MAPLE AVENUE (T454),  Facility Carried by Structure: INTERSTATE 95 (NB)
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 6845,  Location: 1MI.N.EDDINGTON 42B12 (Lat: 40.092264,  Lng: -74.920572),  Route carried "under" structure: US 13,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 15,097 (year 2021),  Truck Traffic: 7%,  Features Intersected: BRISTOL PIKE,  Facility Carried by Structure: INTERSTATE 95 (SB)
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 5.813,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.5m (136.2ft)

Find on map >>   Show street view

Structure Number: 6846,  Location: 1MI.N.EDDINGTON 42B12 (Lat: 40.094744,  Lng: -74.918097),  Route carried "under" structure: State highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 850 (year 1980),  Truck Traffic: 7%,  Features Intersected: MAPLE AVENUE (T454),  Facility Carried by Structure: INTERSTATE 95 (SB)
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 6849,  Location: 1MI.S.CROYDON 42D11 (Lat: 40.101786,  Lng: -74.908156),  Route carried "under" structure: State highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1980),  Truck Traffic: 7%,  Features Intersected: KLECKNER ROAD,  Facility Carried by Structure: INTERSTATE 95 (NB)
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 9.1m (29.9ft)

Find on map >>   Show street view

Structure Number: 685,  Location: 1MI.S.CROYDON 42D11 (Lat: 40.101983,  Lng: -74.908381),  Route carried "under" structure: State highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 1980),  Truck Traffic: 7%,  Features Intersected: KLECKNER ROAD,  Facility Carried by Structure: INTERSTATE 95 (SB)
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 9.1m (29.9ft)

Find on map >>   Show street view

Structure Number: 6851,  Location: CROYDON 42E10 (Lat: 40.104242,  Lng: -74.902072),  Route carried "under" structure: State highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 9,497 (year 2022),  Truck Traffic: 4%,  Features Intersected: NESHAMINY CR & SR 2027,  Facility Carried by Structure: INTERSTATE 95 (NB)
Minimum Vertical Clearance: 4.15m (13.62ft),  Kilometerpoint: 0.922,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 6854,  Location: CROYDON 42E10 (Lat: 40.104622,  Lng: -74.901661),  Route carried "under" structure: State highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 9,497 (year 2022),  Truck Traffic: 4%,  Features Intersected: NESHAMINY CR & APPL 276,  Facility Carried by Structure: INTERSTATE 95 (SB)
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.922,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 7765,  Location: BRISTOL INTERCH. 42F09 (Lat: 40.110472,  Lng: -74.891361),  Route carried "under" structure: Interstate 95,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 44,372 (year 2021),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 95,  Facility Carried by Structure: RAMP A SOUTHBOUND
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 9.637,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 7765,  Location: BRISTOL INTERCH. 42F09 (Lat: 40.110472,  Lng: -74.891361),  Route carried "under" structure: Interstate 95,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 44,587 (year 2021),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 95,  Facility Carried by Structure: RAMP A SOUTHBOUND
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 9.643,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 40186,  Location: KEYSTONE INDST.PK. 42F09 (Lat: 40.109758,  Lng: -74.892461),  Route carried "under" structure: Interstate 95,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 44,372 (year 2021),  Truck Traffic: 8%,  Features Intersected: RAMP A;INTERSTATE 95,  Facility Carried by Structure: RAMP D
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 9.637,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 40186,  Location: KEYSTONE INDST.PK. 42F09 (Lat: 40.109758,  Lng: -74.892461),  Route carried "under" structure: Ramp State highway ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 9,432 (year 2021),  Truck Traffic: 7%,  Features Intersected: RAMP A;INTERSTATE 95,  Facility Carried by Structure: RAMP D
Minimum Vertical Clearance: 5.57m (18.27ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 40186,  Location: KEYSTONE INDST.PK. 42F09 (Lat: 40.109758,  Lng: -74.892461),  Route carried "under" structure: Interstate 95,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 44,587 (year 2021),  Truck Traffic: 7%,  Features Intersected: RAMP A;INTERSTATE 95,  Facility Carried by Structure: RAMP D
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 9.643,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.6m (166.0ft)

Discuss Croydon, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.