Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cuba, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 230ft / 70.4mTotal length
  • $45,005,000Total costs
  • 83,809Total average daily traffic
  • 11,310Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cuba
  • No street view available for this location

New bridges in Cuba, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21940-1949
  • 31960-1969
  • 181970-1979
  • 31980-1989
  • 12000-2009
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Cuba, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 52000-2009
  • 12010-2019
Average Bridge Daily Traffic in Cuba, NY
Average Bridge Truck Traffic in Cuba, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 12.5%Very good
  • 50.0%Good
  • 8.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 8.3%Very good
  • 54.2%Good
  • 16.7%Satisfactory
  • 4.2%Fair
  • 4.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Excellent
  • 12.5%Very good
  • 54.2%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.2%Excellent
  • 12.5%Very good
  • 29.2%Good
  • 37.5%Satisfactory
  • 16.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Excellent
  • 25.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 104547,  Location: 1.5 MILES SE OF CUBA (Lat: 42.197122,  Lng: -78.271331),  Route carried "on" structure: State highway 305,  Year Built: 2011,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,239 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,292 (year 2040),  Design Load: HL 93,  Features Intersected: GRIFFIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.954,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $712,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $1,129,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104548,  Location: 1 MILE SE OF CUBA (Lat: 42.204589,  Lng: -78.274853),  Route carried "on" structure: State highway 305,  Year Built: 1938,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,505 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,656 (year 2040),  Design Load: H 20,  Features Intersected: JOHNSONS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.839,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $335,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $531,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 10455,  Location: .6 MILE NORTH OF CUBA (Lat: 42.226450,  Lng: -78.277286),  Route carried "on" structure: State highway 305,  Year Built: 1966,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 4,786 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,992 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: OIL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.333,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,040,000,  Roadway Improvement Cost: $609,000,  Total Project Cost: $1,650,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 104775,  Location: 1.5 MI W JCT RTE 446 &305 (Lat: 42.217731,  Lng: -78.308619),  Route carried "on" structure: State highway 446,  Year Built: 1986,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 2,625 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,738 (year 2040),  Design Load: HS 20,  Features Intersected: CUBA LAKE OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,211,000,  Roadway Improvement Cost: $709,000,  Total Project Cost: $1,921,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104777,  Location: .9 MI E JCT SR466 & CO LN (Lat: 42.217469,  Lng: -78.290675),  Route carried "on" structure: State highway 446,  Year Built: 1961,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 2,625 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,738 (year 2040),  Design Load: H 20,  Features Intersected: OIL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $782,000,  Roadway Improvement Cost: $458,000,  Total Project Cost: $1,239,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1090031,  Location: 0.1 MI E JCT CITY LNE & I (Lat: 42.216289,  Lng: -78.308331),  Route carried "on" structure: Interstate 86,  Year Built: 1972,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 4,721 (year 2011),  Truck Traffic: 25%,  Design Load: HS 20,  Features Intersected: OIL CREEK CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,504,000,  Roadway Improvement Cost: $881,000,  Total Project Cost: $2,385,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1090032,  Location: 0.1 MI E JCT CITY LNE & I (Lat: 42.215992,  Lng: -78.307589),  Route carried "on" structure: Interstate 86,  Year Built: 1972,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 4,509 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 8,412 (year 2040),  Design Load: HS 20,  Features Intersected: OIL CREEK CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,504,000,  Roadway Improvement Cost: $881,000,  Total Project Cost: $2,385,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1090041,  Location: .4 MI E JCT I86 & CO LINE (Lat: 42.218225,  Lng: -78.301839),  Route carried "on" structure: Interstate 86,  Year Built: 1972,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 4,721 (year 2011),  Truck Traffic: 25%,  Design Load: HS 20,  Features Intersected: RTE 446
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,942,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $3,079,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1090042,  Location: .4 MI E JCT I86 & CO LINE (Lat: 42.217914,  Lng: -78.301186),  Route carried "on" structure: Interstate 86,  Year Built: 1972,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 4,509 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 8,412 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 446
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.692,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,942,000,  Roadway Improvement Cost: $1,137,000,  Total Project Cost: $3,079,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090061,  Location: 0.2 MI W JCT RTS 17 + 305 (Lat: 42.224475,  Lng: -78.280317),  Route carried "on" structure: Interstate 86,  Year Built: 1972,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 4,721 (year 2011),  Truck Traffic: 25%,  Design Load: HS 20,  Features Intersected: OIL CREEK CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.510,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,347,000,  Roadway Improvement Cost: $1,375,000,  Total Project Cost: $3,722,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090062,  Location: 0.2 MI W JCT I86 + SR 305 (Lat: 42.223939,  Lng: -78.280503),  Route carried "on" structure: Interstate 86,  Year Built: 1972,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 4,509 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 8,412 (year 2040),  Design Load: HS 20,  Features Intersected: OIL CREEK CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.510,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.03m (19.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,260,000,  Roadway Improvement Cost: $1,323,000,  Total Project Cost: $3,583,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109007,  Location: 0.2 MI W JCT RTS 17 + 305 (Lat: 42.225092,  Lng: -78.280122),  Route carried "on" structure: Interstate ,  Year Built: 1972,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 1,388 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,589 (year 2040),  Design Load: HS 20,  Features Intersected: OIL CREEK,  Facility Carried by Structure: 86-I WB ONRAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $981,000,  Roadway Improvement Cost: $574,000,  Total Project Cost: $1,555,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109008,  Location: 0.2 MI W JCT RTS 17 + 305 (Lat: 42.223400,  Lng: -78.280681),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1972,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 1,466 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,734 (year 2040),  Design Load: HS 20,  Features Intersected: OIL CREEK,  Facility Carried by Structure: 86I EB OFFRAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,016,000,  Roadway Improvement Cost: $595,000,  Total Project Cost: $1,611,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1090091,  Location: JCT 86I & 305 (Lat: 42.224906,  Lng: -78.277828),  Route carried "on" structure: Interstate 86,  Year Built: 1972,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 4,721 (year 2013),  Truck Traffic: 27%,  Design Load: HS 20,  Features Intersected: RTE 305
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,788,000,  Roadway Improvement Cost: $1,047,000,  Total Project Cost: $2,834,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090092,  Location: JCT 86I & 305 (Lat: 42.224375,  Lng: -78.277978),  Route carried "on" structure: Interstate 86,  Year Built: 1972,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 4,509 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 8,412 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 305
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.735,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,889,000,  Roadway Improvement Cost: $1,106,000,  Total Project Cost: $2,995,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221457,  Location: 3 MILES SE OF CUBA (Lat: 42.181481,  Lng: -78.254464),  Route carried "on" structure: Other road ,  Year Built: 1981,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 186 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 260 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: TRIB GRIFFIN CREE,  Facility Carried by Structure: FARNSWORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $408,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $646,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221458,  Location: 1.0 MI SOUTH OF CUBA (Lat: 42.204014,  Lng: -78.277414),  Route carried "on" structure: Other road ,  Year Built: 2017,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 139 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 195 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: GRIFFIN CREEK,  Facility Carried by Structure: KELLER HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.784,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $330,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $523,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221491,  Location: 0.5 MI N OF CUBA (Lat: 42.226733,  Lng: -78.276358),  Route carried "on" structure: Other road ,  Year Built: 1972,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 432 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 605 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: OIL CREEK,  Facility Carried by Structure: NORTH BRANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $565,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $896,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221541,  Location: 0.4 MI W OF SH 305 - CUBA (Lat: 42.216178,  Lng: -78.279069),  Route carried "on" structure: Other road ,  Year Built: 1945,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 879 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,231 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: GRIFFIN CREEK,  Facility Carried by Structure: WEST MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $836,000,  Roadway Improvement Cost: $490,000,  Total Project Cost: $1,326,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221542,  Location: IN CUBA (Lat: 42.216636,  Lng: -78.282047),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 695 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 973 (year 2038),  Features Intersected: GRIFFIN CREEK,  Facility Carried by Structure: BULL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 24.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $520,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 225518,  Location: IN CUBA (Lat: 42.211781,  Lng: -78.277306),  Route carried "on" structure: Other road ,  Year Built: 1974,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 517 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 724 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: GRIFFIN CREEK,  Facility Carried by Structure: BRISTOL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $878,000,  Total Project Cost: $2,378,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 309029,  Location: IN CUBA (Lat: 42.220500,  Lng: -78.264839),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 1,223 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,712 (year 2036),  Design Load: HL 93,  Features Intersected: TANNERY CREEK,  Facility Carried by Structure: COUNTY ROAD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Inventory Rating: 84.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $475,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33302,  Location: 1.4 MI S OF CUBA (Lat: 42.199519,  Lng: -78.275428),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 358 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 501 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: GRIFFIN CREEK,  Facility Carried by Structure: OLD COUNTY ROAD 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $366,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333021,  Location: 1.6 MI S OF CUBA (Lat: 42.195322,  Lng: -78.278381),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 930 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 970 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TRIB W BRANCH CRK,  Facility Carried by Structure: COUNTY ROAD 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.259,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $632,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333023,  Location: 2.7 MI NW OF CUBA (Lat: 42.260058,  Lng: -78.299681),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 905 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,267 (year 2036),  Features Intersected: RAWSON CREEK,  Facility Carried by Structure: COUNTY ROAD 7D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.365,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $925,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333024,  Location: 2.5 MI NW OF I86 & SH 305 (Lat: 42.256519,  Lng: -78.303800),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 458 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 641 (year 2038),  Design Load: HS 20,  Features Intersected: TRIB CUBA LAKE,  Facility Carried by Structure: COUNTY ROAD 7C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $480,000,  Roadway Improvement Cost: $281,000,  Total Project Cost: $762,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335756,  Location: 2.4 MI NW OF CUBA (Lat: 42.244725,  Lng: -78.306467),  Route carried "on" structure: County highway ,  Year Built: 1978,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 947 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,326 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: MUNGER HOLLOW CRK,  Facility Carried by Structure: COUNTY ROAD 7D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $298,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $472,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 660001,  Location: OIL SPRINGS INDIAN RESERV (Lat: 42.236383,  Lng: -78.307314),  Route carried "on" structure: Other road 961R,  Year Built: 1937,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 544 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 762 (year 2038),  Design Load: HL 93,  Features Intersected: CUBA LAKE OUTLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $874,000,  Roadway Improvement Cost: $512,000,  Total Project Cost: $1,386,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1090041,  Location: .4 MI E JCT I86 & CO LINE (Lat: 42.218225,  Lng: -78.301839),  Route carried "under" structure: State highway 446,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 1979),  Features Intersected: RTE 446,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 1090042,  Location: .4 MI E JCT I86 & CO LINE (Lat: 42.217914,  Lng: -78.301186),  Route carried "under" structure: State highway 446,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 1979),  Features Intersected: RTE 446,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 1090091,  Location: JCT 86I & 305 (Lat: 42.224906,  Lng: -78.277828),  Route carried "under" structure: State highway 305,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 6,400 (year 1978),  Features Intersected: RTE 305,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 22.124,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 1090092,  Location: JCT 86I & 305 (Lat: 42.224375,  Lng: -78.277978),  Route carried "under" structure: State highway 305,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 6,400 (year 1978),  Features Intersected: RTE 305,  Facility Carried by Structure: RTE I86
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 22.124,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Find on map >>   Show street view

Structure Number: 704549,  Location: S END OF CUBA (Lat: 42.211642,  Lng: -78.275183),  Route carried "under" structure: State highway 305,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 4,242 (year 2002),  Features Intersected: RTE 305,  Facility Carried by Structure: WNYP
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 20.627,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 22.2m (72.8ft)

Discuss Cuba, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.