  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 400ft / 122mTotal length
  • $44,528,000Total costs
  • 104,362Total average daily traffic
  • 4,305Total average daily truck traffic
  • 142,174Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Daleville
  • No street view available for this location

New bridges in Daleville, AL - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 61960-1969
  • 11970-1979
  • 21980-1989
  • 111990-1999
  • 12000-2009
Average Bridge Daily Traffic in Daleville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 30.8%Very good
  • 38.5%Good
  • 23.1%Satisfactory
  • 7.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.8%Very good
  • 53.8%Good
  • 15.4%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 38.5%Very good
  • 46.2%Good
  • 15.4%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 19.0%Very good
  • 47.6%Good
  • 23.8%Satisfactory
  • 9.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Excellent
  • 10.0%Very good
  • 50.0%Good
  • 30.0%Satisfactory
Find on map >>   Show street view

Structure Number: 2757,  Location: 2.5 MI. E. OF DALEVILLE (Lat: 31.310917,  Lng: -85.682450),  Route carried "on" structure: State highway 134,  Year Built: 1943,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 4,460 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,422 (year 2033),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.317,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $697,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $767,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3775,  Location: 1.25 MI SE OF BLUFF (Lat: 33.802689,  Lng: -87.910669),  Route carried "on" structure: County highway 107,  Year Built: 1992,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 60 (year 1996),  Average Future Daily Traffic: 70 (year 2030),  Design Load: HS 20,  Features Intersected: HELL'S CREEK,  Facility Carried by Structure: KIRKLAND RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $402,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $442,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 745,  Location: SEC-33 T-4-N R-24-E (Lat: 31.272719,  Lng: -85.647886),  Route carried "on" structure: County highway 121,  Year Built: 1961,  Status: Posted for load,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 121 (year 2005),  Truck Traffic: 8%,  Average Future Daily Traffic: 180 (year 2034),  Design Load: H 15,  Features Intersected: LITTLE CHOC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.75m (28.71ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,441,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $1,585,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9159,  Location: 3 MI. E. OF DALEVILLE (Lat: 31.275617,  Lng: -85.678950),  Route carried "on" structure: US 84,  Year Built: 1966,  Status: Open,  Structure Length: 15.21m (49.90ft),  Average Daily Traffic: 9,165 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,295 (year 2033),  Design Load: HS 20,  Features Intersected: CHOCTAWHATCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 308.690,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 7,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.98m (52.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,616,000,  Roadway Improvement Cost: $362,000,  Total Project Cost: $3,978,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9677,  Location: SEC-28 T-4-N R-23-E (Lat: 31.285453,  Lng: -85.751511),  Route carried "on" structure: County highway 24,  Year Built: 1968,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,406 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,089 (year 2034),  Design Load: H 15,  Features Intersected: SNELL BRIDGE CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $666,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $733,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9678,  Location: SEC-27 T-4-N R-23-E (Lat: 31.285369,  Lng: -85.738753),  Route carried "on" structure: County highway 24,  Year Built: 1968,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 1,406 (year 2006),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,089 (year 2034),  Design Load: HS 20,  Features Intersected: CLAYBANK CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.76m (32.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,075,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $2,283,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9982,  Location: 4.5 MI SW OF COFFEE SPRI (Lat: 31.096600,  Lng: -85.934375),  Route carried "on" structure: County highway 8,  Year Built: 1969,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 125 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 150 (year 2040),  Design Load: H 15,  Features Intersected: LONG BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $554,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $609,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9983,  Location: 0.16 MI N OF PINEBROOK DR (Lat: 32.401392,  Lng: -86.188333),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 2,800 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,920 (year 2038),  Design Load: H 15,  Features Intersected: MONTGOMERY EAST DITCH,  Facility Carried by Structure: WARES FERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.199,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,545,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $1,700,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11476,  Location: FORT RUCKER GATE (Lat: 31.321467,  Lng: -85.710433),  Route carried "on" structure: State highway 85,  Year Built: 1975,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 11,910 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,978 (year 2033),  Design Load: HS 20,  Features Intersected: WIREGRASS CENTRAL R.R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.876,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,558,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $2,814,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1338,  Location: JCT. DALE CO. 114 (Lat: 31.308114,  Lng: -85.743336),  Route carried "on" structure: State highway 37,  Year Built: 1984,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 3,400 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,472 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE CLAYBANK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.491,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 83.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.33m (4.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $747,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $822,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13381,  Location: 1 MI. W. SR 85 (Lat: 31.305683,  Lng: -85.743600),  Route carried "on" structure: US 84,  Year Built: 1984,  Status: Open,  Structure Length: 20.42m (66.99ft),  Average Daily Traffic: 9,465 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,698 (year 2033),  Design Load: HS 20,  Features Intersected: CLAYBANK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 301.556,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 12,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.42m (66.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $6,441,000,  Roadway Improvement Cost: $644,000,  Total Project Cost: $7,085,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15122,  Location: DALEVILLE (Lat: 31.285000,  Lng: -85.758333),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 100 (year 1996),  Average Future Daily Traffic: 150 (year 2034),  Design Load: HS 20,  Features Intersected: LITTLE CLAYBANK CREEK,  Facility Carried by Structure: BRUER DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $305,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $336,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15934,  Location: DALE-HOUSTON CO.LINE (Lat: 31.262817,  Lng: -85.668650),  Route carried "on" structure: US 84,  Year Built: 1994,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 9,165 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,295 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE CHOCTAWHATCHEE R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.420,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 77.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.38m (30.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,700,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $2,970,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15935,  Location: 3 MI.E. OF DALEVILLE (Lat: 31.275800,  Lng: -85.678767),  Route carried "on" structure: US 84,  Year Built: 1994,  Status: Open,  Structure Length: 16.22m (53.22ft),  Average Daily Traffic: 9,165 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,295 (year 2033),  Design Load: HS 20,  Features Intersected: CHOCTAWHATCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 308.690,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 16.96m (55.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $4,885,000,  Roadway Improvement Cost: $489,000,  Total Project Cost: $5,374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15936,  Location: 2.5 MI E.OF DALEVILLE (Lat: 31.279167,  Lng: -85.684517),  Route carried "on" structure: US 84,  Year Built: 1993,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 9,165 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,295 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 308.014,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,778,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $1,956,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16039,  Location: 2.5 MI.E.OF DALEVILLE (Lat: 31.278683,  Lng: -85.685117),  Route carried "on" structure: US 84,  Year Built: 1995,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 9,165 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,295 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 308.014,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,308,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,439,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16109,  Location: DALE-HOUSTON CO. LINE (Lat: 31.262683,  Lng: -85.668800),  Route carried "on" structure: US 84,  Year Built: 1994,  Status: Open,  Structure Length: 8.38m (27.49ft),  Average Daily Traffic: 9,165 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,295 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE CHOCTAWHATCHEE R.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.420,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.38m (30.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,700,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $2,970,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16111,  Location: 3.6 MI.E.OF DALEVILLE (Lat: 31.312967,  Lng: -85.672550),  Route carried "on" structure: State highway 134,  Year Built: 1994,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 4,460 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,422 (year 2033),  Design Load: HS 20,  Features Intersected: DILLY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.281,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,380,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $1,518,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16234,  Location: 3.8 MI. E. OF DALEVILLE (Lat: 31.316017,  Lng: -85.661783),  Route carried "on" structure: State highway 134,  Year Built: 1995,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 4,460 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,422 (year 2033),  Design Load: HS 20,  Features Intersected: KELLY MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.309,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 83.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,143,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $2,357,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16258,  Location: TANK HILL GATE, FT RUCKER (Lat: 31.314164,  Lng: -85.733203),  Route carried "on" structure: US 37,  Year Built: 1943,  Status: Posted for load,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 80 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 105 (year 2033),  Design Load: H 15,  Features Intersected: WIREGRASS CENTRAL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.204,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 37.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 4.07m (13.35ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $808,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $889,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16671,  Location: SEC 29, T4N, R4E (Lat: 31.286417,  Lng: -85.659431),  Route carried "on" structure: County highway 31,  Year Built: 1996,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 612 (year 2007),  Truck Traffic: 5%,  Average Future Daily Traffic: 909 (year 2034),  Design Load: H 20,  Features Intersected: HWY 31
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 58.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $449,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $494,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16672,  Location: SEC 17, T3N, R23E (Lat: 31.228692,  Lng: -85.769728),  Route carried "on" structure: County highway 26,  Year Built: 1996,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 167 (year 2006),  Truck Traffic: 2%,  Average Future Daily Traffic: 248 (year 2034),  Design Load: H 15,  Features Intersected: BRACKIN MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $746,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1859,  Location: R-23-E T-4-N SEC-22 (Lat: 31.310192,  Lng: -85.735861),  Route carried "on" structure: Spur County highway 114,  Year Built: 2001,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 4,340 (year 2001),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,080 (year 2034),  Design Load: H 20,  Features Intersected: SPUR OFF CLAY BANK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $601,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $661,000 ( Estimate for 2022)