Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dante, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 56ft / 17.5mTotal length
  • $872,000Total costs
  • 5,938Total average daily traffic
  • 403Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dante
  • No street view available for this location

New bridges in Dante, VA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 61950-1959
  • 11960-1969
  • 11970-1979
  • 21980-1989
Reconstructed bridges in Dante, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 01990-1999
  • 22000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 62.5%Good
  • 25.0%Satisfactory
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Good
  • 37.5%Satisfactory
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 37.5%Good
  • 50.0%Satisfactory
  • 12.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.1%Very good
  • 11.1%Good
  • 33.3%Satisfactory
  • 33.3%Fair
  • 11.1%Poor
Find on map >>   Show street view

Structure Number: 5785,  Location: 10.8 TO R83;3.8 TO RUS.CO (Lat: 37.014939,  Lng: -82.294431),  Route carried "on" structure: State highway 63,  Year Built: 1956,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,058 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,164 (year 2040),  Design Load: HS 20,  Features Intersected: TRAMMEL CREEK @ TRAMMEL,  Facility Carried by Structure: DANTE MTN. ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.585,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 5791,  Location: 0.04 FR. 656; 1.01 TO 626 (Lat: 37.028219,  Lng: -82.299878),  Route carried "on" structure: State highway 63,  Year Built: 1953,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 1,058 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,164 (year 2040),  Design Load: HS 20,  Features Intersected: ROARING FORK @ TRAMMEL,  Facility Carried by Structure: DANTE MOUNTAIN RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.160,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $274,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5872,  Location: 2.54 FR 627 -.05 TO 63 (Lat: 37.041586,  Lng: -82.316156),  Route carried "on" structure: County highway 655,  Year Built: 1951,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 49 (year 2016),  Average Future Daily Traffic: 55 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MCCLURE RIVER,  Facility Carried by Structure: RICHARD LONG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.246,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5894,  Location: 0.01 FR 63 & .79 TO 757 (Lat: 37.034342,  Lng: -82.311264),  Route carried "on" structure: County highway 715,  Year Built: 1980,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 138 (year 2016),  Average Future Daily Traffic: 155 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MCCLURE RIVER,  Facility Carried by Structure: WAKENVA HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.261,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16377,  Location: 0.35MTO 627 & 0.20MTO 63 (Lat: 36.974778,  Lng: -82.298228),  Route carried "on" structure: County highway 608,  Year Built: 1982,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 629 (year 2015),  Average Future Daily Traffic: 708 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LICK CREEK,  Facility Carried by Structure: BUNCH TOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16378,  Location: 0.00MTO 627 & .55MTO 63 (Lat: 36.978247,  Lng: -82.297728),  Route carried "on" structure: County highway 608,  Year Built: 1930,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 629 (year 2015),  Average Future Daily Traffic: 708 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LICK CREEK,  Facility Carried by Structure: BUNCH TOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16404,  Location: .01M TO 616& 1.09M TO 616 (Lat: 36.951600,  Lng: -82.212500),  Route carried "on" structure: County highway 615,  Year Built: 1958,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 638 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 702 (year 2040),  Design Load: HS 20,  Features Intersected: CHANEY CREEK,  Facility Carried by Structure: GRAVEL LICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.290,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 16427,  Location: 0.0M TO 608& 0.95MTO DCL (Lat: 36.979631,  Lng: -82.297844),  Route carried "on" structure: County highway 627,  Year Built: 1968,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 340 (year 2015),  Average Future Daily Traffic: 382 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LICK CREEK,  Facility Carried by Structure: SAWMILL HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.496,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 78.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $49,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $69,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16511,  Location: .30M TO 627&.25M TO 763 (Lat: 36.976003,  Lng: -82.297017),  Route carried "on" structure: County highway 687,  Year Built: 1957,  Year Reconstructed: 1959,  Status: Posted for load,  Structure Length: 5.20m (17.06ft),  Average Daily Traffic: 89 (year 2015),  Average Future Daily Traffic: 100 (year 2040),  Design Load: H 15,  Features Intersected: SR-63,  Facility Carried by Structure: ROANOKE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.640,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $357,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $529,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16534,  Location: .00MTO63&.02MTOENDMAINT. (Lat: 36.937686,  Lng: -82.284072),  Route carried "on" structure: County highway 838,  Year Built: 1975,  Year Reconstructed: 2016,  Status: Posted for load,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 10 (year 2015),  Average Future Daily Traffic: 11 (year 2040),  Design Load: HS 20,  Features Intersected: HAMLIN BRANCH,  Facility Carried by Structure: SUN DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16511,  Location: .30M TO 627&.25M TO 763 (Lat: 36.976003,  Lng: -82.297017),  Route carried "under" structure: State highway 63,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 1,300 (year 2017),  Truck Traffic: 7%,  Features Intersected: SR-63,  Facility Carried by Structure: ROANOKE HILL ROAD
Minimum Vertical Clearance: 10.26m (33.66ft),  Kilometerpoint: 12.084,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Discuss Dante, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.