Bridge Statistics for Deer Lodge, Montana (MT)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 236ft / 71.6mTotal length
  • $920,000Total costs
  • 96,975Total average daily traffic
  • 20,004Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Deer Lodge
  • No street view available for this location

New bridges in Deer Lodge, MT - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 141960-1969
  • 61970-1979
  • 21980-1989
  • 42000-2009
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Deer Lodge, MT - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 11960-1969
  • 11970-1979
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Deer Lodge, MT
Average Bridge Truck Traffic in Deer Lodge, MT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.2%Very good
  • 29.2%Good
  • 50.0%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 54.2%Good
  • 33.3%Satisfactory
  • 4.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.2%Very good
  • 37.5%Good
  • 54.2%Satisfactory
  • 4.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 26.7%Very good
  • 46.7%Good
  • 13.3%Satisfactory
  • 13.3%Fair
Find on map >>   Show street view

Structure Number: 202004954,  Location: DEER LODGE - SECOND STREE (Lat: 46.402439,  Lng: -112.736581),  Route carried "on" structure: City street 39124,  Year Built: 2012,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Design Load: HL 93,  Features Intersected: COTTONWOOD CREEK,  Facility Carried by Structure: SECOND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 202104955,  Location: Deer Lodge (Lat: 46.390600,  Lng: -112.737200),  Route carried "on" structure: County highway 1016,  Year Built: 2021,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Design Load: HL 93,  Features Intersected: CLARK FORK RIVER,  Facility Carried by Structure: CONLEY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.702,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.3m (112.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: I00090180+04301,  Location: 6.2M N DEER LODGE (Lat: 46.476633,  Lng: -112.723183),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 7,487 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,861 (year 2040),  Design Load: HS 20,  Features Intersected: JR GRADE SEP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 288.149,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.5m (21.3ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 37.8m (124.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: I00090182+09191,  Location: 6.2M N DEER LODGE (Lat: 46.440392,  Lng: -112.723503),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 7,487 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,861 (year 2040),  Design Load: HS 20,  Features Intersected: JR GRADE SEP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 292.171,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 40.8m (133.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: I00090184+09061,  Location: 1.2M N DEER LODGE (Lat: 46.411933,  Lng: -112.723461),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 7,385 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,754 (year 2040),  Design Load: HS 20,  Features Intersected: INT N DEER LODGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 295.338,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090184+09062,  Location: 1.2M N DEER LODGE (Lat: 46.411981,  Lng: -112.723117),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 7,385 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,754 (year 2040),  Design Load: HS 20,  Features Intersected: INT N DEER LODGE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 295.441,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090185+10121,  Location: DEER LODGE (Lat: 46.397347,  Lng: -112.717603),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 7,385 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,754 (year 2040),  Design Load: HS 20,  Features Intersected: SEP MILWAUKEE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 297.039,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090185+10122,  Location: DEER LODGE (Lat: 46.397331,  Lng: -112.717217),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 7,385 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,754 (year 2040),  Design Load: HS 20,  Features Intersected: SEP MILWAUKEE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 297.149,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090187+00291,  Location: 0.6M S DEER LODGE (Lat: 46.383069,  Lng: -112.725767),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 7,385 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,754 (year 2040),  Design Load: HS 20,  Features Intersected: SEP EASTSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 298.766,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $456,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090187+00292,  Location: 0.6M S DEER LODGE (Lat: 46.382839,  Lng: -112.725622),  Route carried "on" structure: Interstate 90,  Year Built: 1974,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 7,385 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,754 (year 2040),  Design Load: HS 20,  Features Intersected: SEP EASTSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 298.907,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090187+06891,  Location: 1.2M S DEER LODGE (Lat: 46.376072,  Lng: -112.735869),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 7,385 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,754 (year 2040),  Design Load: HS 20,  Features Intersected: CLARK FORK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 299.866,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090187+06892,  Location: 1.2M S DEER LODGE (Lat: 46.375897,  Lng: -112.735631),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 7,385 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,754 (year 2040),  Design Load: HS 20,  Features Intersected: CLARK FORK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 299.997,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.7m (51.5ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: L39018007+03001,  Location: 5M N DEER LODGE (Lat: 46.472892,  Lng: -112.728214),  Route carried "on" structure: County highway 39028,  Year Built: 1989,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Design Load: HS 20,  Features Intersected: CLARK FORK RIVER 038,  Facility Carried by Structure: ROCK CREEK CATTLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.352,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L39018007+04001,  Location: 5M N DEER LODGE (Lat: 46.473061,  Lng: -112.726014),  Route carried "on" structure: County highway 39028,  Year Built: 1989,  Status: Open,  Structure Length: 3.49m (11.45ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Design Load: HS 20,  Features Intersected: CLARK FORK RIVER 03,  Facility Carried by Structure: ROCK CREEK CATTLE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.180,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.0m (52.5ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: L39242001+01001,  Location: 2M S DEER LODGE (Lat: 46.359669,  Lng: -112.741678),  Route carried "on" structure: ServiceState highway 81011,  Year Built: 1930,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 1.11m (3.64ft),  Average Daily Traffic: 443 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 465 (year 2040),  Design Load: H 15,  Features Intersected: POWELL CREEK 063,  Facility Carried by Structure: S FRONTAGE RD 011
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.066,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: M39031000+00501,  Location: DEER LODGE-CENTER ST (Lat: 46.399442,  Lng: -112.721733),  Route carried "on" structure: City street 39031,  Year Built: 2015,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Design Load: HL 93,  Features Intersected: COTTONWOOD CREEK 049,  Facility Carried by Structure: CENTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.447,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $126,000,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: M39031000+00601,  Location: DEER LODGE-KOHRS ST (Lat: 46.399547,  Lng: -112.724433),  Route carried "on" structure: City street 39031,  Year Built: 2003,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Features Intersected: COTTONWOOD CREEK 065,  Facility Carried by Structure: KOHRS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.278,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 23.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: M39031000+00701,  Location: DEER LODGE-CLAGETT ST (Lat: 46.400133,  Lng: -112.727203),  Route carried "on" structure: City street 31,  Year Built: 2007,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Design Load: HS 20,  Features Intersected: COTTONWOOD CREEK 081,  Facility Carried by Structure: CLAGETT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.233,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: M39031000+00901,  Location: DEER LODGE-4TH ST (Lat: 46.400703,  Lng: -112.733500),  Route carried "on" structure: City street 31,  Year Built: 2007,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 100 (year 2037),  Design Load: HS 20,  Features Intersected: COTTONWOOD CREEK 080,  Facility Carried by Structure: FOURTH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.202,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: M39031000+08001,  Location: DEER LODGE-CLARK ST (Lat: 46.400131,  Lng: -112.730403),  Route carried "on" structure: City street 31,  Year Built: 2007,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 224 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 235 (year 2040),  Design Load: HS 20,  Features Intersected: COTTONWOOD CREEK 083,  Facility Carried by Structure: CLARK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: S00272000+03441,  Location: DEER LODGE (Lat: 46.398144,  Lng: -112.742594),  Route carried "on" structure: State highway 272,  Year Built: 1940,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 3,195 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,355 (year 2040),  Design Load: H 15,  Features Intersected: CLARK FORK RIVER,  Facility Carried by Structure: W MILWAUKEE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.561,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.1m (46.3ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $338,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: S00275001+00951,  Location: DEER LODGE-MAIN ST (Lat: 46.402019,  Lng: -112.735058),  Route carried "on" structure: State highway 275,  Year Built: 2014,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 4,806 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,046 (year 2040),  Design Load: HL 93,  Features Intersected: COTTONWOOD CREEK,  Facility Carried by Structure: MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.740,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.6m (51.2ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 32.9m (107.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: S00275002+04801,  Location: S DEER LODGE (Lat: 46.382203,  Lng: -112.737547),  Route carried "on" structure: State highway 275,  Year Built: 1949,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 2,101 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,206 (year 2040),  Design Load: HS 20,  Features Intersected: CLARK FORK RIVER,  Facility Carried by Structure: MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.962,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: S00275003+00921,  Location: 1M S DEER LODGE (Lat: 46.373819,  Lng: -112.738542),  Route carried "on" structure: State highway 275,  Year Built: 1961,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 2,101 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,206 (year 2040),  Design Load: HS 20,  Features Intersected: INT S DEER LODGE-I 90,  Facility Carried by Structure: RAMP TO MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.901,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.7m (61.4ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: I00090180+04301,  Location: 62M N DEER LODGE (Lat: 46.476633,  Lng: -112.723183),  Route carried "under" structure: County highway 39126,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Features Intersected: JR GRADE SEP,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 0.040,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 6.5m (21.3ft)

Find on map >>   Show street view

Structure Number: I00090182+09191,  Location: 62M N DEER LODGE (Lat: 46.440392,  Lng: -112.723503),  Route carried "under" structure: County highway 39123,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Features Intersected: JR GRADE SEP,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.30m (14.11ft),  Kilometerpoint: 0.079,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 6.1m (20.0ft)

Find on map >>   Show street view

Structure Number: I00090184+09061,  Location: 12M N DEER LODGE (Lat: 46.411933,  Lng: -112.723461),  Route carried "under" structure: State highway 275,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Features Intersected: INT N DEER LODGE,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: I00090184+09062,  Location: 12M N DEER LODGE (Lat: 46.411981,  Lng: -112.723117),  Route carried "under" structure: State highway 275,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Features Intersected: INT N DEER LODGE,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.026,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: I00090185+10121,  Location: DEER LODGE (Lat: 46.397347,  Lng: -112.717603),  Route carried "under" structure: ServiceCounty highway 39251,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Features Intersected: SEP MILWAUKEE AVENUE,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.067,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: I00090185+10122,  Location: DEER LODGE (Lat: 46.397331,  Lng: -112.717217),  Route carried "under" structure: ServiceCounty highway 39251,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 3%,  Features Intersected: SEP MILWAUKEE AVENUE,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.093,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: I00090187+00291,  Location: 06M S DEER LODGE (Lat: 46.383069,  Lng: -112.725767),  Route carried "under" structure: ServiceState highway 39000,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 46 (year 2020),  Truck Traffic: 3%,  Features Intersected: SEP EASTSIDE ROAD,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: I00090187+00292,  Location: 06M S DEER LODGE (Lat: 46.382839,  Lng: -112.725622),  Route carried "under" structure: ServiceState highway 39000,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 46 (year 2020),  Truck Traffic: 3%,  Features Intersected: SEP EASTSIDE ROAD,  Facility Carried by Structure: I 90
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.833,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: S00275003+00921,  Location: 1M S DEER LODGE (Lat: 46.373819,  Lng: -112.738542),  Route carried "under" structure: Interstate 90,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 8,559 (year 2020),  Truck Traffic: 23%,  Features Intersected: INT S DEER LODGE-I 90,  Facility Carried by Structure: RAMP TO MAIN ST
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 300.198,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.7m (61.4ft)